01-19-11 Board of Public Works Meeting Agenda
BOARD OF PUBLIC WORKS OFFICIAL NOTICE OF REGULAR MEETING A meeting of the Board of Public Works will be held on Wednesday, January 19, 2011, at 4:45 p.m. in Common Council Chambers - Third Floor, City Hall, 108 East Green Street, Ithaca, New York. Agenda 1. Additions or Deletions to Agenda (Items 1 -5: 20 min.) 2. Mayor's Communications 3. Communications and Hearinas from Persons before the Board 4. Response to Public 5. Reports Special Committees of the Board Council Liaison Board Liaisons Superintendent and Staff Other Department Heads 6. Approval of Minutes (10 min.) 6.1 December 22, 2010, Board of Public Works Meeting Minutes 7. Administration and Communications 7.1 BPW meeting for January 19, 2011 7.2 BPW meeting for February 9, 2011 8. VOTING ITEMS 8.1 Buildings, Properties. Refuse, and Transit 8.2 Hiahways, Streets. and Sidewalks (20 min.) 8.2 Award of Contract for Professional Services for Reconstruction of Stewart Avenue — Capital Project 728 — Resolution 8.3 Parking and Traffic (5 min.) 83 Requests for Reserved Parking for People with Disabilities from Kitchen Theater Company and St. Paul's Methodist Church — Resolution 8.4 Creeks. Bridges. and Parks 8.5 Water and Sewer (5 min.) 8.5 Appeal of Water Bill for 104 -06 Homestead Road — Resolution 9. DISCUSSION ITEMS 9.1 Buildings, Properties, Refuse, and Transit 9.2 Highways, Streets, and Sidewalks (15 min.) 9.2 Widening of Road at the Intersection of Aurora and Prospect Streets — Discussion 9.3 Parking and Traffic 9.4 Creeks, Bridges, and Parks 9.5 Water and Sewer 10. New Business 11. Adioumment If you have a disability that will require special arrangements to be made in order for you to fully participate in the meeting, please contact the City Clerk at 274 -6570 at least 48 hours before the meeting. The Board of Public Works meets on the second, third and fourth Wednesdays of the month at 4:45 p.m. All meetings are voting meetings, which opens with a public comment period. Meeting agendas are created from prior public input, Department operating and planning issues, and requests made to the Supenntendent. The Board reserves the right to limit verbal comments to three minutes and to request written comments on lengthy or complex issues. This information may then be used to create committee agendas, with the speaker or author invited to attend. Page 2 Notes for BPW Agenda. January 19. 2011 6.1 December 22.2010. Board of Public Works Meeting Minutes Enclosed is Page 2 of the meeting minutes for December 22, 2010. This is the only page with proposed changes. 7.1 BPW meetina for January 19, 2011 The Mayor has called a Special Meeting of Common Council for Wednesday January 19, 2011 at 6:45 pm so the BPW meeting will end at 6:30 to allow for the change over of meetings. 7.2 BPW meeting for February 9. 2011 The Mayor has called a Special Meeting of Common Council for Wednesday February 9, 2011 at 5:30 pm in Common Council Chambers. I have reserved the second floor conference room for the BPW meeting from 4:45 pm to 6:45pm that evening. 8.2 Award of Contract for Professional Services for Reconstruction of Stewart Avenue — Capital Project 728 — Resolution Attached is a modified resolution prepared by City Attorney Dan Hoffman following the Board's discussion on January 12th about the need to address the status of environmental review for the project. Dan has inserted a third Whereas to address this point. On the same topic, a conversation seems to be starting up about the use of brick paving on the street as required by Common Council in a resolution dated October 3, 1984. Kathy Gehring has located a substantial collection of historical notes on the topic which we can provide when the topic comes before the Board (or when requested). Since the scope of work for the design contract being authorized here includes a comparison of life cycle costs for various paving materials leg. clay brick, concrete brick, asphalt), we believe the report phase of the design work would be the appropriate time to discuss this topic and to make a recommendation to Common Council based on the economic and community factors raised during that discussion. The recommendation would go along with a recommendation to fund the paving project. At this time the project only authorizes funds for design work. 8.3 Requests for Reserved Parking for People with Disabilities from Kitchen Theater Company and St. Paul's Methodist Church — Resolution Attached are resolutions prepared by Tim Logue, based on the BPW discussion on January 19th. Because of the nature of the solutions being adopted in response to the requests, we have formulated these as two different resolutions. One fits into the current schedules as part of the Vehicle and Traffic Law in City Code. The other is an expansion of our juvenile meter bag program. 8.5 Appeal of Water Bill for 104-06 Homestead Road — Resolution An adjusted bill of $282.44 has been calculated for this property which takes into account the number of minimum bills paid by the property during the six year period in question and gives credit to the property for the unused portion of those minimum bills against the outstanding charge. Mr. Johnson indicated to the Board that he had paid a bill of Page 3 approximately $889 to cover this expense. The charge had been transferred to taxes during the dispute period. Between previous adjustments and penalties levied in the billing history, it will take the Chamberlain's office a little time to calculate the credit or refund due Mr. Johnson. The resolution has been written accordingly. 9.2 Widenina of Road at the Intersection of Aurora and Prospect Streets — Discussion In the public comments for this project, during various presentations, it was observed that the work did not resolve the issue of a dedicated turning lane for south bound Route 96B traffic which wanted to turn north (head down hill) on Aurora. Currently those turning left can backup a substantial amount of traffic that want to make the right hand turn and continue south (412 of 467 vehicles in the pm peak hour make the right hand turn, the other 55 turn left, 88% to 12 %). They sought to have this project resolve that problem. The designer provided drawings and we sent letters to the three impacted properties who would lose property if the city undertakes the design changes needed to respond to the comments. A sample copy of the letter is attached. I have been involved in many modifications to this intersection over the years, in attempts to improve the intersection for pedestrians, vehicles, trucks or buses. This proposal is the best balance of the pedestrian and vehicular needs that meets the goal the driving public who have been requesting a turning lane for more than twenty years. However, it requires the taking of private land to make this work better. While I believe that the impacts are modest and the improvements warranted, we have been nibbling away at the properties or tree lawns on all sides of the intersection for many years. It would be good to take a look at the intersection in the afternoon, and the properties anytime prior to our discussion. FYI — Also included in your agenda packet is a calendar of events for the Kitchen Theatre for their 2011 season. W.J. Gray, P.E. Superintendent of Public Works January 14, 2011 Page 4 8.2 Award of Contract for Professional Services for Reconstruction of Stewart Avenue — Capital Project 728 — Resolution (Original Proposed Resolution) WHEREAS, proposals were solicited for professional engineering and design services for of the Reconstruction of Stewart Avenue, and WHEREAS, staff recommends award of contract for professional services to Delta Engineers, Architects and Land Surveyors of Endwell, NY for a not -to- exceed fee of $224,960.00 now therefore be it RESOLVED, That the City of Ithaca Board of Public Works hereby awards the contract for Professional Services for Reconstruction of Stewart Avenue to Delta Engineers, Architects and Land Surveyors of Endwell, NY for their not -to- exceed fee for services of $224,960.00, and be it further RESOLVED, That the Mayor be and hereby is authorized to execute this contract, and that the Superintendent of Public Works be and hereby is authorized to administer the same. (Amended Proposed Resolution submitted by City Attorney Hoffman) WHEREAS, proposals were solicited for professional engineering and design services, for the reconstruction of Stewart Avenue, and four proposals were received and reviewed, and WHEREAS, staff recommends award of a contract for such professional services to Delta Engineers, Architects and Land Surveyors of Endwell, NY, for a not -to- exceed fee of $224,960.00, and WHEREAS, while, according to City and State environmental review laws, the reconstruction of Stewart Avenue appears to be either an unlisted or a Type II (exempt) action - depending on the scope of the project once there is an actual, proposed design for it, the design phase itself (which consists of "engineering studies ... and other studies and preliminary planning and budgetary processes necessary to the formulation of a proposal for action ... [which] do not commit the agency to commence, engage in or approve such action ") falls within at least one of the types of actions defined as Type II, and therefore does not require environmental review at this time; now therefore be it RESOLVED, That the City of Ithaca Board of Public Works hereby awards the contract for Professional Services for the Reconstruction of Stewart Avenue to Delta Engineers, Architects and Surveyors of Endwell, NY, for its not -to- exceed fee for services of $224,960.00, and be it further RESOLVED, That the Mayor be and hereby is authorized to execute this contract, upon the advice of the City Attorney, and that the Superintendent of Public Works be and hereby is authorized to administer the same. Page 5 -11 Utlrhe, N. 17H4 this is sm;r,har diffcront than thm: :.>rmu 1. Iu,,•,; el err:uts, 11 Zoning rosu LU ions du urigivatc and ire dISCLISSCd in tha Planning f, Development Committee and then the praceluro the committees havr. agreed upon is that tL,' 11Idn1ji1u.: Ii Ilevnlopinent Colmaitl.cu would thou 'all rot n 1,10.1 i, h:•.iring ;v: a pa rt ire l:rr proposed zoning rusulutiou; at that point it would he referred LO the Chartm' r, Ordinance Committee for nee -month period for review and recommendation as to whether w' not it should pass to Council. (art(!r the public hearing, is hold). Recent ion /RetmLlacement. of Erick and ldasonr Pavia. Materials uy h7Serperson (ludic ngs[ eS con�re y erman omanoi,, RESOLVED, That the following be adopted as the City's policy on retention /reimplacoment of brick and masonry paving materials: Common Council shall: 1. Identify all existing brick and masonry paved streets and appurtenances in the City of Ithaca, including those with an a:y)hait overlay. Evaluate the condition of all brick/ masonry streets and appurtenances. M Z. Document the type of base, cushion and size of brick (or CO masonry) on each street and appurtenance. Record data of M installation and known iopnirs. M 3. Establish a system of categorizing brick.masonry streets CD and appurtenances. Sot priorities for which streets and Q appurtenances will be retained. e.g. a. Local streets and appurtenances within National Register eligible Historic Districts or on which National Register buildings are located. b. local streets and appurtenances in neighborhoods with local historic districts or proposed districts. C. Streets and appurtenances in residential or commercial areas 1.hat have undergone considerable revitalization efforts and that retain their original integrity. It. Strecl.s and appurtenances with unique paving patterns or matminls. VIC Board of public Works shall: 4. Establish stockpiling methods which conform to the following: a. All reasonable salvageable brick /masonry materials should be carefully removed from the site and transported to a reasonably secure storage area. b. All such paving materials are to be cleaned and piled in an orderly and retrievable manner, preferably on pallets, in an economically feasible fashion; the methods of cleaning and stockpiling to be investigated by the Board of public 1Vorks. C. Usable paving materials shall he pilot] according to size and recorded, to ensure that in adequate accounting of those valuable resources is made. .,. Cross train DPW personnel to repair /maintain such streets and appuricnancos in ruder to heap tha b, ick laying skill eilhin 1'ho dup:u't niont. h. Require that all utility and other oponiu[;s are repaired in kind with identical paving mater ift1s and replacement teclniques. 7. Prepare model speei rications and contract documents thnt rofleet current teehnulol;i•n in brick pavin,. 12 -13- 0, tebol' 1994 S. include annual mnintanave sChed I, les in 1.1 1114ti wu rk p, eg ram for hri.c k /masonry s rcc is alit] aplitn tenaucos. Ili srusslaa fnlicwud nn ihu flour. A vote on the resolution resulted ;,s follows: Ayes (8) - Petorsort, Dearman, Killeen, 1)(7111115, Cunnings, Myers, Rumanuwski, schI a ther Nays (2) - Ila.ine, Do.ldsworth Ca. I ied East State Street Pavement ilyy�lr a- semen '.uimnin8s: 'Seconded by Alderainn not Goan IYNEREAS, there are several uu :nswered questions regarding the condition of the brick and enrcrete hit s. on Bast State Strcet, and h'DERP.AS, these questions can be answered through certain test.., recommended by the �'Ity lingineer, and WHEREAS, performing these tests will greatly reduce the uncar- tainty, regarding the cost of repaving East State Street, and IVIIEREAS, the City Ungi.ncer has recommended that a demonstration brick repaving project be undertaken in 1985 on one or two blocks in downtown Ithaca to reaffirm the City's commitmelit to enhancement and revitalization, and IVIIF.RIIAS, the repaving project will generate further practical knowledge on brick paving and give local contractors familiarity with such projects; now, therefore, be it RESOLVED, That the Common Council request that the necessary tests recommended by the City P,nginear be undertaken as soon as practicable, and be it further RESOLVED, That the planning, design and construction of a demonstra- tion brick paving project be included in the 1985 Capital Budget Request List. Discussion followed on the floor. A vote on the resolution resulted as follows Ayes (9) - Peterson, lloffm_an, Killeen, Ilaine, Dennis, Cummings, Myers, Romnrowski, Schlatdmr Noy (1) - Doldswarth Carried NYSGA Grant Award )ty Alderporson Cunnings: Seconded by Alderperson Peterson IV111,REAS, the City has been awarded a $3,000 gnat from Ncnw York State Council on the Arts requiring a $2,500 local match to evaluate under- utilized commercial space in the City of Ithaca, to aid future planning efforts, and produce a catalogue to pre - moto oppropriule uses of commercial space, ;it] id Ili IIEREAS, such match will be requested for inclu,t ion in the Planning and DevC.I upmertt Departlnant fudgct request for 1985; now, thcrcforr :, be it RESOLVED, That. the City accopt said fends to Lever the cost of the ,..hove- mentioned projoct. Discussion full need out the floor '1'ub' l illy. Not! or lfy udcTmall ficatis: SOCwndeO by Alderporson Hain, IiliSttl,ylilt, 'I'hnt 1'110 rev ul,rtien cone.. rn ing NYSCA Grant Award h,- bihlcd. 8.3 Requests for Reserved Parking for People with Disabilities from Kitchen Theater Company and St. Paul's Methodist Church A Resolution to Allow the Kitchen Theater to Use Meter Bags to Reserve Two On -Street Parking Spaces for People with Disabilities on West State/ Martin Luther King, Jr. Street on Performance Days WHEREAS, the Board of Public Works has received a petition from the Kitchen Theatre, 417 -419 West State /Martin Luther King, Jr. Street, asking for authorization to place two meter bags on two meters in front of the theater on performance days to reserve the spaces for people with disabilities, and WHEREAS, the Kitchen Theatre is in a B -2c Zoning District that does not require any off - street parking and the Kitchen Theatre does not have exclusive control over any off - street parking, and WHEREAS, most of the performance times at the theater are weekends or weekday evenings and are, therefore, outside the normal times of operation of the parking meters, and WHEREAS, temporary meter bags provide more flexibility than permanent signage and therefore should reduce the impacts of reserving on- street parking spaces for people with disabilities on the surrounding land uses, and WHEREAS, the City Transportation Engineer has recommended that the request be granted and the Board of Public Works is willing to try this arrangement as an experiment, now therefore be it RESOLVED, That the Board of Public Works hereby grants the request of the Kitchen Theater for the ability to use two (2) meter bags to reserve two on- street parking spaces for people with disabilities for theater performance days, and be it further RESOLVED, That the Kitchen Theater shall be responsible to purchase and maintain the meter bags at their expense, which meter bags shall be approved by the City Transportation Engineer to ensure that the bags have the appropriate wording and symbols and are made of a durable material. Page 6 To Amend the Vehicle and Traffic Schedules to Create Reserved Parking Spaces for People with Disabilities on North Aurora Street along St. Paul's Methodist Church WHEREAS, the Board of Public Works has received a petition from St. Paul's United Methodist Church, 402 North Aurora Street, to create one additional reserved parking space for people with disabilities (RPPD) on North Aurora Street, and two time limited, RPPD spaces (Sundays only, between 7a.m. and noon), and WHEREAS, the Board of Public Works is authorized by Section 346-4 of the City Code to adopt and to amend a system of Schedules in order to administer the Vehicle and Traffic Law, and WHEREAS, the City Transportation Engineer has recommended that the request be granted, and WHEREAS, the Board of Public Works is in agreement with the request and recommendation, now therefore be it RESOLVED, That Schedule XXV, Reserved Parking for People with Disabilities, be amended as follows: Name of Street Side Location Aurora Street West Three (3) spaces closest to the comer of E. Court St along 402 N. Aurora St Aurora Street West Two (2) spaces along 402 N. Aurora St (between the abovementioned three spaces and Cascadilla Creek), which shall be time limited to Sundays Only from 7 a.m. to noon (otherwise not reserved spaces) Page 7 8.5 Appeal of Water Bill for 104-06 Homestead Road — Resolution WHEREAS, the change -out of water meters at 104 -106 Homestead Road uncovered a discrepancy in the outside register and the actual water meter which had accumulated over a period of ten years, and WHEREAS, an adjusted bill has been calculated by Water and Sewer following a detailed review of the billing history which takes into account the a maximum period of six years for recovering billings, the use pattern of the current property owner as demonstrated in current billings, the number and size of minimum use bills paid at the property during the correction period, produces an adjusted bill of $282.44, and WHEREAS, Mr. Johnson has indicated that he was billed for several figures in the last several years and is currently under the impression he has paid a sum of approximately $889 to cover this expense, now therefore be it RESOLVED, That the Board expunges any prior billings related to the adjustments billed against the Water and Sewer Account #1405516100, 104 -106 Homestead Road and adopts the calculated adjustment of $282.44 to cover the billable portion of water meter correction, and requests that the Chamberlain calculate the actual refund due the property owner based on a complete review of the billing history, as well as any charges transferred and recovered though the property taxes, and forward the refund to the owner as soon as possible. Page 8 F RA: ' , t %, 0 gPogOTfcO CITY OF ITHACA 108 East Green Street, Ithaca, New York 14850 -6590 OFFICE OF THE CITY ENGINEER Telephone: 607 /274-6530 Fax: 607/274 -6587 December 22, 2010 dUMMINENSWO Ithaca NY, 14850 C�Op� Re: East Clinton Street Bridge Replacement /Prospect Street Reconstruction Project Dear Currently, City of Ithaca and Delta Engineers, Architects, & Land Surveyors are working on a project to replace East Clinton Street Bridge and to reconstruct Prospect Street. As part of this project and based on public inputs from a public information meeting which was hold on October 27,2010, the consultant proposed design alternatives at Prospect Street /South Aurora Street intersection in order to allow two lanes (a right and a left ) to exist Prospect street. Attached please find the proposed design alternatives and their associated Right of Way impacts. These materials are for your information about the proposed design alternatives at this particular intersection prior to a January 19, 2011 Board of Public Works meeting. If you have questions about the plans, please feel free to contact me or Mr. Bill Gray, P.E at (607) 274-6530 or you can e-mail me at aeebre(a),citvofithaca.ore Sincerely, Addisu ebm Bridge System Engineer cc: Honorable Carolyn K. Peterson, Mayor Alderperson Maria Coles, Common Council - First Ward Alderperson Jennifer Dotson, Common Council - First Ward 9 a s Fa vall e 5 a y o ya e fP— .. C55 8§ • i L„ ' �! p 5p ` 4 h I Fa e G�W�C,f / ) II © \ 2! a+ e� \ 14 } ; « � � - - -.� J \J fit) / ) II © \ 2! a+ e� •ne � �• m• oa. .�n...•.aii...ra�o�w.�rm�bbm"p I 89faY�� R'�R E t R mnv mn — 4 � aum r _ a 4-9 � O o 0 p�C g' O f 1 1 1 Sa a : I i% I 89faY�� R'�R E t R mnv mn 0 `o s t f 3 0 a 7 t _i