HomeMy WebLinkAbout17 - DPW - WS - Prioritized_Construction_Equipment_Requests.pdfCITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works DIVISION: Water and Sewer Division
ITEM REQUESTED: CAT 305.5E Mini Excavator with compactor,
CVP16 Compactor
ESTIMATED COST: $80,000.00
IS THIS ITEM A REPLACEMENT: YES X NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED: 14 -yrs
CONDITION OF ITEM TO BE REPLACED: fair
DISPOSITION OF ITEM TO BE REPLACED: Auction
JUSTIFICATION OF NEED
To replace existing 4x4 Backhoe #593 (2000 JCB 215E)
Replace with smallest possible alternative to meet carbon footprint reduction goals.
Replacement serves to reduce our annual fuel and maintenance costs.
#593 is worn out to the point where excavation power is lacking
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
ITEM REQUESTED:
ESTIMATED COST:
DIVISION: Water and Sewer Division
2015 Ford Transit Connect -Light Commercial 4 -cyl. Utility Van with shelves
$30,000.00
IS THIS ITEM A REPLACEMENT; YES x NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED: 10 years
CONDITION OF ITEM TO BE REPLACED: Poor, 87K miles
DISPOSITION OF ITEM TO BE REPLACEI Auction
JUSTIFICATION OF NEED
To replace existing fleet vehicle #304 (2002 Chrysler 6 -cyl Mini Van)
Water & Sewer Systems Utility Location Technician Vehicle:
Replace with smallest possible alternative to meet carbon footprint reduction goals.
Replacement serves to reduce our annual fuel and maintenance costs.
Van #304's life time operating cost has reached $0.81 /mile this year, note the average
life time cost per mile of vehicles in a similar class is $0.37 /mile. It is at a point where
it is costing us more to keep it than replace it. Fuel milage is at 8.69 mpg
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
DIVISION: Water and Sewer Division
ITEM REQUESTED: Skidsteer with Pavement Cutting Wheel & Broom Attachments
CAT 236B Skid Steer Loader
ESTIMATED COST: $80,000.00
IS THIS ITEM A REPLACEMENT: YES 2 for 1 NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED:
CONDITION OF ITEM TO BE REPLACED:
DISPOSITION OF ITEM TO BE REPLACED:
16& 10
Fair- poor/Undersized
Auction
JUSTIFICATION OF NEED
Replacement for #162 - (1998 -Gehl Skidsteer) & #278 (2004 - Multiquip 20" Concrete /Asphalt
Cutting machine)
#162 lacks hydraulic and power capacity to function for pavement saw attachment.
#278 lacks the power and speed to effectively cut through heavier pavement section
We have spent thousands $ on the rental of pavement cutters and lost many productive
hours using equipment undersized for the work.
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
ITEM REQUESTED:
ESTIMATED COST:
DIVISION: Water and Sewer Division
Trench Shield Modular Panel Safety Shoring System
$35,000.00
IS THIS ITEM A REPLACEMENT: YES x NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED:
CONDITION OF ITEM TO BE REPLACED:
DISPOSITION OF ITEM TO BE REPLACED:
15 yrs. +
unservicable
scrap
JUSTIFICATION OF NEED
Modular Box Panel Trench Safety Shoring System. Replacement for old hydraulic jack and
laminate panel shoring system. Laminate panels and structural members have degraded
beyond the point where they are no longer certifiable for OSHA & PESH purposes.
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
ITEM REQUESTED:
ESTIMATED COST:
DIVISION: Water and Sewer Division
2.5 -CY Wheeled Loader CAT 930K w /GP bucket
$140,000.00
IS THIS ITEM A REPLACEMENT: YES x NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED:
CONDITION OF ITEM TO BE REPLACED:
DISPOSITION OF ITEM TO BE REPLACED:
14
Fair /poor
Auction
JUSTIFICATION OF NEED
To replace existing Loader #592 (2000 Case 621C)
#592 we've replaced emergency electric backup steering & braking system several times.
These are critical safety features which persistantly burn out from unknown cause.
We have spent thousands repairing without having CASE give us any idea of root cause.
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
ITEM REQUESTED:
ESTIMATED COST:
DIVISION: Water and Sewer Division
2015 Chevrolct Colorado Light 4X4, 4 -cyl. Pickup truck w/Utility Body
$30,000.00
IS THIS ITEM A REPLACEMENT: YES X NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED: 10 years
CONDITION OF ITEM TO BE REPLACED: Poor, 93K miles
DISPOSITION OF ITEM TO BE REPLACED: Scrap / Auction
JUSTIFICATION OF NEED
To replace existing fleet vehicle #8 (2003 Chevrolet Astro 4 -WD, 6 -cyl. Work Van)
Water Meter Section: Meter Reading, Installation, Repair & Maintenance Vehicle
Replace with smallest possible alternative to meet carbon footprint reduction goals.
Replacement serves to reduce our annual fuel and maintenance costs.
Van #8's life time operating cost has reached $0.71 /mile this year, note the average
life time cost per mile of vehicles in a similar class is $0.37 /mile. It is at a point where
it is costing us more to keep it than replace it. Fuel milage is at 7.53 mpg
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
ITEM REQUESTED:
ESTIMATED COST:
DIVISION: Water and Sewer Division
2015 Chevrolct Colorado Light 4X4, 4 -cyl. Pickup truck w/Utility Body
$30,000.00
IS THIS ITEM A REPLACEMENT: YES X NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED: 10 years
CONDITION OF ITEM TO BE REPLACED: Poor, 93K miles
DISPOSITION OF ITEM TO BE REPLACED: Scrap / Auction
JUSTIFICATION OF NEED
To replace existing fleet vehicle #8 (2003 Chevrolet Astro 4 -WD, 6 -cyl. Work Van)
Water Meter Section: Meter Reading, Installation, Repair & Maintenance Vehicle
Replace with smallest possible alternative to meet carbon footprint reduction goals.
Replacement serves to reduce our annual fuel and maintenance costs.
Van #8's life time operating cost has reached $0.71 /mile this year, note the average
life time cost per mile of vehicles in a similar class is $0.37 /mile. It is at a point where
it is costing us more to keep it than replace it. Fuel milage is at 7.53 mpg
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
DIVISION: Water & Sewer Division
ITEM REQUESTED: 2.5 -CY Wheeled Loader, CAT 930K w /GP bucket
ESTIMATED COST: $140,000.00
IS THIS ITEM A REPLACEMENT: YES x NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED:
CONDITION OF ITEM TO BE REPLACED:
DISPOSITION OF ITEM TO BE REPLACED:
21
Good/fair
Auction
JUSTIFICATION OF NEED
To replace existing Loader #448 (1993 John Deere 544G)
John Deere no longer making or stocking replacement / repair parts for this old model
Repair parts availability will most likely render this machine unsustainable in the near future.
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
DIVISION: Water and Sewer Division
ITEM REQUESTED: 2 -Steel Road Plates 10' -6" x 5' -6"
ESTIMATED COST: $3,500.00
IS THIS ITEM A REPLACEMENT: YES x NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED: 20 -yrs
CONDITION OF ITEM TO BE REPLACED: warped
DISPOSITION OF ITEM TO BE REPLACED: scrap
JUSTIFICATION OF NEED
Replacement for 2 -old unservicable plates
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
ITEM REQUESTED:
ESTIMATED COST:
1 - 3" Diaphram Pump
$1,800.00
DIVISION: Water and Sewer Division
IS THIS ITEM A REPLACEMENT: YES x NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED:
CONDITION OF ITEM TO BE REPLACED:
DISPOSITION OF ITEM TO BE REPLACED:
14 yrs.
JUSTIFICATION OF NEED
Replacement for #127 -2000 Wacker PT3A
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
ITEM REQUESTED:
ESTIMATED COST:
14 "- Demo /Pipe Saw
$1,400.00
DIVISION: Water & Sewer Division
IS THIS ITEM A REPLACEMENT: YES x NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED:
CONDITION OF ITEM TO BE REPLACED:
DISPOSITION OF ITEM TO BE REPLACED:
7
broken/irrepairable
scrap
JUSTIFICATION OF NEED
Replacement for #201 -2007 Makita All Purpose Saw
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN
CITY OF ITHACA
EQUIPMENT REQUEST FORM
DEPARTMENT: Public Works
DIVISION: Water and Sewer Division
ITEM REQUESTED: TR1551 DS -45 Gas Core Drill w/4 " &6" wet core bits
ESTIMATED COST: $3,000.00
IS THIS ITEM A REPLACEMENT: YES
X NO
REPLACEMENT INFORMATION
AGE OF ITEM TO BE REPLACED: 17 yrs.
CONDITION OF ITEM TO BE REPLACED: Scrap
DISPOSITION OF ITEM TO BE REPLACED: Junked
JUSTIFICATION OF NEED
Replacement for #533 -1997 Wheeler Sewer Hole Cutting System
BUDGET AND ADMINISTRATION COMMITTEE APPROVAL
CHAIRMAN