Loading...
HomeMy WebLinkAboutMN-SJC-2026-01-14SJC MEETING January 14, 20026 A Robert Cantelmo, City of Ithaca P Rod Howe, Town of Ithaca A Clyde Lederman, City of Ithaca A Rob Rosen, Town of Ithaca P Scott Reynolds, City of Ithaca A Ray Burger, Town of Dryden P Dave Warden, City of Ithaca P Jason Leifer, Town of Dryden P Rich DePaolo, Town of Ithaca P = Present, PZ = Present Via Zoom, E = Excused and A = Absent PZ Wendy Cole, City of Ithaca PZ Peter Wernsdorfer, Camden Group P Scott Gibson, City of Ithaca PZ Ken Scherrieble, Camden Group P Joe Slater, Town of Ithaca P Kelly VanRiper, City of Ithaca P Jesse Semanchik, B & L PZ Brigid Mulroe, B & L P Dan Fuller NYS DEC Region 7 P Fernando Tigueroa, The Voice P = Present, PZ = Present Via Zoom, E = Excused and A = Absent Called to Order 1:02 pm 1) Agenda 2) Election of Chair and Vice Chair a. Chair -Scott Reynolds b. Vice Chair- Rich DePaolo c. Set 2026 Meeting Schedule & Venue -Second Wednesday of Every Month 3) Consider Approval of 11/12/2025 Minutes a. Rich DePaolo Moved b. Dave Warden Second 4) Review Susan Brock Letter of Engagement for 2026 Legal Services a. Susan is Retiring in July b. Tabled to Discuss Report at Next Meeting 5) Review of Monthly Financials -Wendy a. Audit Update February 2026 b. Still have Expenses Coming in for 2025 6) Operations & Engineering Report -Peter and Scott G a. Influent Pump Update i. 3-Duty Cycle Pumps 1-Off tine ii. 2-Wet Weather Pumps 1- Off Line iii. December 22, 2025 Wet Weather Failed iv. Emergency Plan $150,000 set a Side by S J C v. 3 Duty Cycle Pumps are Currently Working vi. Ordering Parts for 1 Wet Weather Pump vii. Second Wet Weather Pump needs a Complete Rebuild viii. Pump #3 Repair estimated at $10,000 ix. Pumps are 40 Years Old & Need Replacing/Rebuilds b. Nitrite & Ammonia Sampling Results are Reflected in the Appendix Reports c. Operation Report & Engineering Reports are also in the Appendixes 7) NYSDEC Permit Modification Update -Jesse a. Data Acquisition, Lake Monitoring- Ken, Rich, & Jesse b. PFAS-State Focus 8) Capital Improvement Projects -Jesse a. Short Term Plan (2026/2027) b. Long TermPlan(8-10Years) 9) Misc. Updates a. May 2026 Contract Expires Renew with Partners b. Rate Increases Revisit Middle of Summer Adjournment-2:20 pm Upcoming Meeting Date February 11, 2026 Please See Attached Appendixes: 1 -Agenda January 14, 2026 2-January 14, 2026, Minutes 3 - Letter from Susan Brock 4-Financials 5-Operator's & Engineer's Report 6 - Gas usage Report 7-Schedule of Compliance 8- IAWWTF Influent Building Pump Repair 9 - DMR Copy of Record RIppe.nd I x 'I ITHACA AREA WASTEWATER TREATMENT FACILITY TOWN OF ITHACA CITY OF ITHACA TOWN OF DRYDEN, OWNERS 525 THIRD STREET ITHACA, NEW YORK 14850 (607)273-8381 Special Joint Committee Wednesday, January 14, 2026, 1:00 PM Ithaca Town Hall. Aurora Conference Room A Zoom link is provided for staff and members of the public who chose to attend virtually: hftos:Hus06web.zoom.us/i/83271492698 1) Agenda Review 2) Election of Chair and Vice Chair b) Set 2026 meeting schedule & venue 3) Consider approval of minutes: 11/12/25 4) Review Susan Brock letter of engagement for 2026 legal services 5) Review of monthly financials- Wendy b) Audits: Status update 6) Operations & Engineering Report- Peter, Scott b) Influent pumps update c) Nitrite & Ammonia sampling results to -date 7) NYSDEC permit modification update —Jesse b) Data acquisition, lake monitoring— Ken, Rich, Jesse 8) Capital Improvement Project Update- Jesse a) Short-term plan (2026/2027) b) Long-term plan 9) Misc. updates 10) Adjournment Upcoming Meeting Date: February 11, 2026 Out of consideration for the health of other individuals, please refrain from using perfume/cologne and other scented personal care products at City of Ithaca meetings. Thank you foryour cooperation and understanding. SJC MEETING January 14, 20026 A Robert Cantelmo, City of Ithaca P Rod Howe, Town of Ithaca A Clyde Lederman, City of Ithaca I A Rob Rosen, Town of Ithaca P Scott Reynolds, City of Ithaca A Ray Burger, Town of Dryden P Dave Warden, City of Ithaca P Jason Leifer, Town of Dryden P Rich DePaolo, Town of Ithaca P = Present, PZ = Present Via Zoom, E = Excused and A = Absent PZ Wendy Cole, City of Ithaca PZ Peter Wernsdorfer, Camden Group P Scott Gibson, City of Ithaca PZ Ken Scherrieble, Camden Group f P Joe Slater, Town of Ithaca P Kelly VanRiper, City of Ithaca P Jesse Semanchik, B & L PZ Brigid Mulroe, B & L P Dan Fuller NYS DEC Region 7 P Fernando Tigueroa, The Voice P = Present, PZ = Present Via Zoom, E = Excused and A = Absent Called to Order 1:02 pm 1) Agenda 2) Election of Chair and Vice Chair a. Chair -Scott Reynolds b. Vice Chair- Rich DePaolo c. Set 2026 Meeting Schedule & Venue -Second Wednesday of Every Month 3) Consider Approval of 11/12/2025 Minutes a. Rich DePaolo Moved b. Dave Warden Second 4) Review Susan Brock Letter of Engagement for 2026 Legal Services a. Susan is Retiring in July b. Tabled to Discuss Report at Next Meeting 5) Review of Monthly Financials -Wendy a. Audit Update February 2026 b. Still have Expenses Coming in for 2025 6) Operations & Engineering Report- Peter and Scott G a. Influent Pump Update i. 3 - Duty Cycle Pumps 1 -Off Line ii. 2-Wet Weather Pumps 1- Off line iii. December 22, 2025 Wet Weather Failed iv. Emergency Plan $150,000 set a Side by S J C v. 3 Duty Cycle Pumps are Currently Working vi. Ordering Parts for 1 Wet Weather Pump vii. Second Wet Weather Pump needs a Complete Rebuild viii. Pump #3 Repair estimated at $10,000 ix. Pumps are 40 Years Old & Need Replacing/Rebuilds b. Nitrite & Ammonia Sampling Results are Reflected in the Appendix Reports c. Operation Report & Engineering Reports are also in the Appendixes 7) NYSDEC Permit Modification Update -Jesse a. Data Acquisition, Lake Monitoring -Ken, Rich, &Jesse b. PFAS-State Focus 8) Capital Improvement Projects -Jesse a. Short Term Plan (2026/2027) b. Long TermPlan(8-10Years) 9) Misc. Updates a. May 2026 Contract Expires Renew with Partners b. Rate Increases Revisit Middle of Summer Adjournment-2:20 pm Upcoming Meeting Date February 11, 2026 Please See Attached Appendixes: 1 -Agenda January 14, 2026 2-January 14, 2026, Minutes 3 - Letter from Susan Brock 4- Financials 5-Operator's & Engineer's Report 6 - Gas usage Report 7-Schedule ofCompliance 8- IAWWTF Influent Building Pump Repair 9 - DMR Copy of Record Append't x 3 SUSAN H. BROCK Attorney at Law 12 Pheasant Way Ithaca, New York 14850 Telephone: 607-277-3995 Facsimile: 607-277-8042 January 2, 2026 Supervisor Rod Howe Town of Ithaca 215 N. Tioga St. Ithaca, NY 14850 Supervisor Jason Leifer Town of Dryden 93 E. Main St. Dryden, NY 13053 Acting City Manager Dominick Recckio City of Ithaca 108 E. Green St. Ithaca, NY 14850 Re: Engagement Letter for Legal Services Dear Supervisor Howe, Supervisor Leifer and Acting City Manager Recckio: E-mail: brock@claritycomect.com This will confirm the terms on which the Town of Ithaca, City of Ithaca, and Town of Dryden are retaining me to provide legal services as the attorney for the Ithaca Area Wastewater Treatment Facility. Beginning January 1, 2026, my hourly rate for these services will be $305.00. Any paralegal time will be billed at $185/hour. All time, including but not limited to meetings, telephone calls, document drafting, court and administrative appearances, research, and out -of -county travel will be billed on an hourly basis, to the nearest one -tenth of an hour. hi addition to time charges, I will bill for my actual disbursements, including but not limited to photocopying in bulk, any out-of-town travel expenses, any court filing fees, and other miscellaneous out-of-pocket expenses. I will submit monthly bills showing a detailed description of services and a breakdown by day as to how much time was spent on IAW WTF matters. The bills will also show an itemization of disbursements for which the IAW WTF is being charged. Upon the IAW WTF's request, I will provide separate bills for specific matters. In the event that a dispute arises between us relating to my fees, the IAW WTF/municipal owners shall have the right to arbitration of the dispute pursuant to Part 137 of the Rules of the Chief Administrator of the Courts, a copy of which will be provided to you upon request. The municipal owners may terminate my representation at any time with or without cause by notifying me in writing of their desire to do so. Upon receipt of the notice to terminate representation, I will cease immediately all IAW WTF legal work. The IAW WTF/municipal owners will be responsible for paying all legal fees and expenses incurred until written notice of termination is received by me. Engagement Letter for Legal Services January 2, 2026 Page 2 At the conclusion of my representation of the IAW WTF, I will work with the Special Joint Committee Chair to determine which files to transfer to the IAW WTF's/municipal owners' possession. I will then retain any of their legal files still remaining in my possession for a minimum period of six years. I reserve the right to charge administrative fees and costs associated with retrieving, copying and delivering such files. If the foregoing accurately describes our agreement, each of you will need to sign this letter after your respective governing body approves it. Once that has occurred, please return a copy to me. This letter may be signed in separate counterparts, any one of which need not contain the signature of more than one party, but all of which taken together will constitute one and the same agreement. Please do not hesitate to discuss with me any questions you may have about this letter or any future bills. I have very much enjoyed working with the three municipalities and iAW WTF staff and look forward to my continued work with you and them. Sincerely, Susan H. Brock TOWN OF ITHACA By: Date: Rod Howe, Supervisor TOWN OF DRYDEN By: Date: Jason Leifer, Supervisor CITY OF ITHACA By: Date: Dominick Recckio, Acting City Manager Hppe na + x `t Revenues: J8150 Account # Description Budget Actual 2373 Septage Service Other $ 800,000 $ 543,175 2374 Sewer Service OtherGovt's $ 4,735,276 $ 3,797,877 2392 Debt Service Other Govt's $ 1,683,489 $ 989,496 2401 Interest & Earnings $ 2,500 $ - 2665 Sale of Equipment $ 1,500 $ 6,315 2680 Insurance Recoveries $ - $ - 2701 Refund of Prior Year Expense $ $ 2705 Gifts and Donations $ $ - 2770 Unclassified Revenue $ 1,000 $ 8,401 Total Revenues as of 12131125 $ 7,223,765 $ 5,345,264 Expenditures: J8150 Account# Description Operations: 1920 Municipal Asssociation Dues 1990 Contingency Account 5105 Administration Salaries 5110 Staff Salaries Budget Actual $ 1,119 $ 1,055 $ 150,000 $ $ 526,314 $ 392,826 Excess or % (Deficiency) Redd $ (256,825) 67.90% $ (937,399) 80.20% $ (693,993) 58.78% $ (2,500) 0.00% $ 4,815 421.00% $ 7,401 840.10% $ (1,878,501) 74.00% Available % Balance Used $ 64 94.28% $ 150,000 0.00% $ - 0.00% $ 133,488 74.64% 5115 HourlyF/T $ 28,146 $ 28,927 $ (781) 102.77% 5120 HourlyP/T $ 20,000 $ 8,501 $ 11,499 42.51% 5125 Overtime $ 25,000 $ 9,640 $ 15,360 38.56% 5210 Office Equipment $ - $ - $ - 0.00% 5215 Motor Vehicles $ $ - $ - 0.00% 5225 Other Equipment $ $ 960 $ (960) 0.00% 5405 Telephone $ 6,000 $ 3,332 $ 2,668 55.53% 5410 Utilities $ 463,000 $ 444,290 $ 18,710 95.96% 5415 Clothing $ 10,000 $ 6,416 $ 3,584 64.16°% 5420 Gas & Oil $ 15,000 $ 1,961 $ 13,039 13.07% 5425 Office Expense $ 3,000 $ 5,201 $ (2,201) 173.37% 5430 Fees $ 100,000 $ 99,142 $ 858 99.14% 5435 Contracts $ 1,664,000 $ 1,536,021 $ 127,979 92.31% 5436 Overhead Charge City General Funi $ 300,306 $ 300,306 0.00% 5440 Staff Development $ 15,000 $ 9,948 $ 5,052 66.32°% 5450 Advertising $ 200 $ 88 $ 112 44.00% 5455Insurance $ 257,568 $ 235,116 $ 22,452 91.28% 5475 Property Maintenance $ - $ - $ - 0.00% 5476 Equipment Maintenance $ - $ - $ - 0.00% 5477 Equipment Parts $ 450,000 $ 295,262 $ 154,738 65.61% 5479 Vehicle Maintenance $ 2,000 $ 26 $ 1,974 1.30°% 5480 Building Maintenance Supplies $ 18,000 $ 6,628 $ 11,372 36.82% 5494 Safety Materials & Supplies $ 7,000 $ 3,708 $ 3,292 52.97% 5495 Treatment Supplies $ 750,000 $ 435,642 $ 314,358 58.09°% 5496 Lab Supplies $ 90,000 $ 51,913 $ 38,087 57.68% 5499 Sludge Disposal Fees $ 550,000 $ 520,625 $ 29,375 94.66°% 5700 Prior Year Encumbrances $ - $ 19,893 $ (19,893) 0.00% 5720 Prior Year Equipment $ - $ - $ - 0.00% Sub -Totals $ 5,451,653 $ 4,117,121 $ 1,334,532 75.52% Benefits: 9010 State Retirement $ 86,842 $ 71,861 $ 14,981 82.75°% 9030 Social Security $ 40,263 $ 33,674 $ 6,589 83.64% 9040 Workers Compensation $ 28,000 $ 15,407 $ 12,593 55.03% 9050 Unemployment Insurance $ - $ - 0.00% 9060 Health Insurance $ 129,710 $ 229,142 $ (99,432) 176.66% 9070 Dental Insurance $ 2,808 $ 2,572 $ 236 91.60°% 9080 Day Care Assistance $ - $ - $ - #DIV/0! 9089 Employee Tuition $ 1,000 $ - $ 1,000 0.00% Sub -Totals $ 288.623 $ 352,656 $ (64,033) 122.19% Debt Service 9710 Serial Bonds $ 1,034,278 $ 1,034,278 $ - 100.00% 9711 Interest on Serial Bonds $ 580,477 $ 580,507 $ (30) 100.01% 9730 BANS $ 1,042 $ 1,042 $ - 0.00% 9731 Interest on BANS $ 67,692 $ 68,138 $ (446) 100.66% Sub -Totals $ 1.683.489 $ 1,683,965 $ (476) 100.03% Interfund Transfers 9951 Transfer to Capital Reserves $- $ - $ - 0.00% Sub -Totals $- $ $ 0.00% Total All Expenditures as of 1213 $ 7,423,765 $ 6.153.742 $ 1.270.023. Surplus(deficit) as of $ (200,000) $ (808,478) $ (608,478) $200,000 was appropriated from Fund Balance surplus for 2025 82.89% Ap�e�no�► ► x 5 Operator's and Engineer's Report 14 January, 2025 1. Operations a. Regulatory Compliance - Effluent quality is consistently high quality b. Personnel —No changes c. Influent — A compactor auger (1 of 2) was replaced and brought back into service d. Blowers — No changes e. Digesters — Operating normally f. Micro Turbines — All turbines are operational, gas quality is high g. ActiFlo (Tertiary Treatment) — ActiiFlo is operational h. Clarifiers — Work is delayed for the winter L Aeration — AT 3 will be complete after winter j. Trucked Waste — We await parts for the repair k. Facility Improvements — Our meetings with NYSDEC continue with B&L. The Asst. Superintendent can provide details L Asset Management - Currently, we are tracking 18 open work orders, have completed 177 of 204 repair work orders. We are tracking 8 PM work orders out of total of 97 recurring PMWOs m. Staff Management - Weekly check -ins continue. Safety Toolbox Talks are distributed weekly 2. Reporting - no issues noted a. Regulatory reports were sent as scheduled 3. Business, Long -Term Development a. Capital Planning - Semi-monthly meetings continue b. Energy Management — No activity this month 4. Operations Data - The MOR and Gas Data Tables are under separate cover to the Chair 07-24-OP-REPORT.docx page 1 Append I x to Gas Use - Sept. 2024 - Present Equipment Usage - MCF Month Co -Gen Boilers Waste Total BioGas Natural Gas Sept.2024 2271 158 104 2533 3298 Oct.2024 2223 545 79 2847 6330 Nov.2024 3354 227 73 3654 12862 Dec.2024 2328 812 105 3245 16337 Jan.2025 3385 237 0 3622 28611 Feb.2025 3368 0 0 3368 17742 Mar. 2025 3664 0 0 3664 19115 Apr. 2025 3330 108 0 3438 14131 May 2025 1687 1201 0 2888 4937 June 2025 1115 110 46 4043 5048 July 2025 1854 268 0 2122 3270 Aug.2025 2854 190 0 3044 965 Sept. 2025 3573 231 0 3804 3099 Oct. 2025 3312 133 0 3445 3027 Nov.2025 3598 72 0 3670 3194 Dec.2025 3803 0 0 3803 3381 NIppey.)a i x I SCHEDULE OF COMPLIANCE a) The iermittee shall comply with the followinq schedule: Outfall(s) Compliance Action Compliance Date 001 INTERIM PROGRESS REPORT2 EDPM + g Months The permittee shall provide a status update on the Preliminary Engineering Report Addendum and compliance with the final total phosphorus concentration effluent limitation. 001 MIXING ZONE STUDY WORK PLAN EDPM + 12 Months The permittee shall submit an approvable3 work plan of the mixing zone study, prepared by a Professional Engineer currently licensed to practice in New York State, for review and approval. The work plan shall include a schedule for the study. If the Department approves the work plan, the approved schedule will become an enforceable part of this Schedule of Compliance. 001 PHOSPHORUS CONCENTRATION EFFLUENT LIMITATION EDPM + 18 Months The permittee shall comply with the final total phosphorus concentration effluent limitation. 001 INTERIM PROGRESS REPORT EDPM + 21 Months The permittee shall provide a status update for the Design Documents. 001 MIXING ZONE STUDY EDPM + 24 Months The purpose of the mixing zone study is to determine the nearfield and far -field dilution factors in the ambient water (Cayuga Lake, Southern Shelf). The dilution factors will be used in refining the current water quality -based effluent limits (WQBEL) for Outfall 001. At the conclusion of the study, the permittee shall submit a report summarizing the results of the study which shall include data collected at various distances away from the discharge location from Outfall 001, dilution profiles from between 5 feet to 500 feet from the discharge structure (upstream, downstream and etc.). The Department reserves the right to modify WQBEL's pending the results of the report. 001 INTERIM PROGRESS REPORT EDPM + 30 Months The permittee shall provide a status update for the Design Documents. 001 PRELIMINARY ENGINEERING REPORT ADDENDUM EDPM + 36 Months The permittee shall submit an addendum to the May 2025 Preliminary Engineering Report describing the treatment alternatives or facility modifications that may be used to comply with the final effluent limitations for ammonia and nitrite. 001 INTERIM PROGRESS REPORT EDPM + 39 Months The permittee shall provide a status update for the Design Documents. 001 DESIGN DOCUMENTS The permittee shall submit approvable Design Documents including a Basis of Design Report (BODR), Plans, Specifications, and Construction Schedule for the EDPM + 48 Months selected alternative that will ensure compliance with final effluent limitations for ammonia and nitrite. r 6 NYCRR 750-1.14 (a) 2 6 NYCRR 750-1.14 (b) 3 6 NYCRR 750-1.2 (a)(8) SCHEDULE OF COMPLIANCE (continued) INTERIM EFFLUENT LIMIT MONITORING REQUIREMENTS OUTFALL PARAMETER Location Sample Sample —votes Type Limit Units Limit Units Frequency TY�y�e� Inf. Eff. 001 Ammonia Monthly Monitor mg/L 920 Ib/d 1/Month 2' "" X 1 6/1-10/31 Average Comp. 001 Ammonia Monthly Monitor mg/L 3,200 Ib/d 1/Month 24-hr. X 1 11/1 —5/31 Averaqe Com��DD,��. 001 Nitrite Daily Max Monitor mg/L 1/Month 247r X 1 001 Total Phosphorus Monthly Monitor mg/L 2/Week 24-hr. X 2 Averaqe Comp. Notes: 1. Interim limits for ammonia and nitrite expire EDPM + 60 months. 2. Interim limit for phosphorus expires EDPM + 18 months. b) The permittee shall submita written notice of compliance or non-compliance with each of the above schedule dates no laterthan 14 days following each elapsed date, unless conditions require more immediate noticeas prescribed in 6 NYCRR Part 750-1.2(a) and 750-2. All such compliance or noncompliance notification shall be sent to the locations listed under the section of this permit entitled RECORDING, REPORTING AND ADDITIONAL MONITORING REQUIREMENTS. Each notice of noncompliance shall include the following information: 1. A short description of the noncompliance; 2. A description of any actions taken or proposed by the permittee to comply with the elapsed schedule requirements without further delay and to limit environmental impact associated with the non-compliance; 3. Any details which tend to explain or mitigate an instance of noncompliance; and 4. An estimate of the datethe permittee will complyw ththe elapsed schedule requirement and an assessment of the probability that the permittee will meet the next scheduled requirement on time. c) The permittee shall submit copies of any document required by the above schedule of compliance to the NYSDEC Regional Water Engineer and to the Bureau of Water Permits. IAWWTF Influent Building Pump Repair Estimate of Probable Cost Date Vendor Repair 12/22/2025 W20 Pull Pump 2 and Prep Pump 3 $ 1/7/2026 W&S Remove and Install Gate Valve 3 $ 2 rubber couplers (Pump 5), reinstall Pump 5 on 1/9/2026 W20 January13 Ordered rotating assembly for Pump 2 along with 1/9/2026 W20 estimated Pump 2repair 1/9/2026 W20 Ordered 2 Shafts for Pump 3 Plus Freight 1/9/2026 W20 Ordered nutfor Pump 3 1/14/2026 W20 Pump 3 repair 1/8/2026I Rain for Rent I Installation and Removal+ Incidentals 28 day rental after 1 month Cost Status Notes 4,500.00 Approved & Paid 5,500.00 Estimate New Gate Valve Already Purchased in 2025 $ 9,000.00 Estimate Processing $ 57,000.00 Estimate Processing $ 12,700.00 Estimate Processing $ 1,125.00 Estimate Processing Pending $ 89,825.00 Total $ 30,2007.25IQuote INotyet approved APPend'x 9 DMR Copy of Record Form Approved OMB No.2MW-0004 assume on 07912020 EPA may make all Me mfomlaGon eubmgled Mough Mr. farm (including all allachmams) Muslable 1d the public without hcdr lickw to you. Oo not use this coin. Imm he submit p...net Information (e.0„ non4uslness roll phone number or non-buaNess..II addo ss7, mnlldenGal m alness mformegon (CBI), or If you Intend to asserta CHI claim on any of the submitted information. Pursuant W 40 CFR 2203(a), EPA b posd ing you with nonce Mal all CBI claims must be aspect at Me time of submission. EPA cannot accommodate a lend CBI GBIm to covet previously submitted Inimmabou bd®use e0eRs he protect the mbermahao eta her adminisloth ely precticaMO since 9 may atready W disclosed to the public, Nlheugb we do not iuresea a need far parsons to assert le mare of CBI be." on the types of Infmma0om ".too in How form, If peremovash to ..an a CBI calm we of. surplus. to conduct me IP111 arcei He, ca,for hinder guidance. Please rate Mel EPA may compact you doer you submit this of"d for mom tnfarmelion. Thus collection of information Is apposed by OMB under the Paperwork Reduction Act, 44 U.S.C. 3501 N seq. (OMB Control No. 2040-0004). Response to the collection of information are mandi in ac,rummun with this permit and EPA NPDES mgule0ors 40 CM 122.41(1)(4)(i). An aganry may not conduct or sponsor, and a person Is not required to respond to, a Collection of informaton unless II displays a ourerlly va0d OMB con"I number. The public resulting and rdcondkeepirg burden for this collection of information are estimated to avereg02 hours per outhat Send comments on the Agencys .ad for We Information, the accamry of Me PmAded burden es0mates and any suggested malhots for mlnimbet, hemandert burden 10 and Regulatory Support Oivbiun Director, US. Emionmenral Protection Agency (2821T), 1200 Pennsylvania Awn., NW, WasNnglM. O.C. 2011 IncluEa Me OMB consul number in any cormspontlence. DO not sand Ore completed form to this address. Perm Parent w: NY0026638 Perminee: ITHADA(C) Fecolty f11WCA AREA Ati Mlaor: Yes lownw0sea Address: 108 FAST GREEN ST Facility LoaMiee, 525 THIRD STREET ITHACA, NY 14850 RHACA, W lost Pecmh son Faatun: 001 D.mu, . Gi Erlemai oidbol W WrP OUFFALL th paA Dacha A Seakrs Momolmg Period: Fom 11)(11125 to 11130125 DMR Due Oases: 1X21UHS smam. N MR Validated C...i '.Hors for Form Cpn"soni Pmeryeal E.Ohna ORuer Final Name: HennBM Tue. Puddanl T.Mistiona: 315-2454444 "a, Nerve: Scherrietele An, Ara Moll INDOO Fern NOIN - Porri strewn In—sgm OwmPym\NYMy aWlitmrnNnnuMbn ax4 irt4.vnyMAvlyvr sai TlFn OWIMNI Wbel O,ulllw4 VaM2 VeM euMNwr1 Newt ggMµe2 Vur] OUWMMa Wl.y 4eT 15-EpF mal-T,m Per day GR - Grab Mal TlmpeAtuM, walerd0.fahranba0 ®®y.J�� 1-EMuanl GNan 0 - �"^"�J1 - AI.OGAILVM% 15-EqF 0 .1-T.Perday GR-Gn0 _y.�) = al 15-"F OLOt-ibmP.Ory ful M011 Temperature, water daM labmnhaN G- Raw Sewage lnflmnl 0 - easawl Rp MondAlLy. us -a i 0 0301-TMeFaID, GR-Greb seaeal sital_f .1.a 319.1) 26-WO = be = on u-m Ni-TakeEvel Wxp 24-24lbw commuw 00310 BOp,5Oay.204wS,C 1-EMuenlGmss 0 - 1n1.181 a�hi' 250O0MOAVG c 3aWATO9AVG26-tod e= 30AMOAVG a502WAVG 19-IL 0 oblo-Tale Every Weea N-241bur Cams. am*% .11" 2a-bE = 1. 19-nWL 02/W-iMS Emory Wwa 21-Il Xourrbry4yq 0310 BOD, SEry. WMg. C G- Raw SavaOe lnnuenl 0 - "Reap RWMmlai 2a-per Rp Nou No And 19-red. 0 =01-Twos Every Wo-e&-24 Nee ciumeed, i NIAaW lA = 2-so OSTI-Two Pow us,b GR-Gra 00400 pH de,�j 1-EMuenl G. 0 - --� y, '= aA MMIMUM YNaa 9A MA%IMOM R-50 0 a., -I seer Der ...... �Ilpr._�( = TA a 9,1 12-au OAH-Tweserdey Gle-Greb OO4m PN R G-M Seem, MlluMe,y.p l 0 - � RN tom MNMNN MIIYpes'1! Wp as. NA%MUM 12. ad g .1 P. day GR-G. ale F 330A ease ]9-Nd = so = is. 1a-,, OLOr-TMn Ewy Weak M-N ibur CanprtelY 00530 9wlid5, u,ml¢ uapondud 1-EMuem Gr0ss 0 - jim"I'el_� 25D3A AD AVG u 300O0TWAm ffi-Na m ]O,OMOAVG a 1. 31 WAVG 19-mpL 0 r.,-Take Every W. N-2, Wq GM nePp Vametal t"i .10A ye -led = 118.0 19-mpL OMW-name Every Weh 24-24 Hor purpose OOiAO So11M.tWaleumended G- Raw Sesm, Induced 0 - 'hseall" Rpaton MOAW 26-1:11 RNMan WAND 19-rryl 0 02A1-Twice Emory WM 24-N Hb CamMY9 bAa 1Mbl ( O,1 2a-L OYTI-Inca PxdGR-Greb II DD545 9.M. ¢aneabla i- Flnuanl Grvaa 0 - I"Well ¢= O.sdA0.Y MA 26-.MIL 0 OLm.11,ee Per Oe. Ga-Grta vaelill 4.0 lbe 19-mat- mar-MmWy 24-24Wacmpmm not Nlnour anim ¢Mlles Nl 1-Mind G. 1 - N-nll 0 mM-Marls, N-s414urGmµwwb l Pam} ma m-Ne omH-Twb Everyww m-xlav Pampafll. Omm Phosphorus, tonal to. Pj 1-Effluent Groan 0 - =- Vella <DA ROL1 m-be 0 WV-TMU Ew,V 24-N Mo,a Compmtle I'Mem,-p 1Nai m-be = ]]W 19-myL 0MP-Tet., .et2.-NibNCaRRxwR 0D055 Pho.Phe..,..I(as P) EG- Eflluenl DR. C _ INwiii" tea... m-tee Rp Mm MG AVG 19- r 0 wry bbo epL Dzmr-]wlnl w..E 29-25Iw ca q imml� V- I- 5a12 0]-MOO 9wn-Cor.. RC - eMo.(aubl 50050 Now. In candUlt or Mm inatmeni pNm 1-Muenl Gm6w 0 - � 13O MO AVG D2. MG0 0 .0-Cortmoo. RC-Rto2er(wb) Obe ID-ne, CL01-Owe ow Cy GR-One 6060 Chbtlre,bhlmldual 1-EMuenl Gross 0 - 14SS',�J c= O.1 QALYm l8-m 0 ovol-OP.r Wy GR-Ca we Vliw W1 %.1-) = O.RB aM-n Dfi]0-.m GR-GM 719M MMrco,.IOMl(u Hp) 1-EMuenl Gras 0 - 1"MmM = W.O.1 M% aM-q'L 0 b1MG-MmWY GR-Gne wmRii. + J = aD = 19.0 ta-WebolL LLD]-TWS Every WM GR-GM 76055 Colft.. laelI IIBMRI 1-H.Md G. 0 - FNf a 200,0 9.EG a .[U 07 MGM 1a-WI.L 0 OLDi-TWm Eery WeN OR-Gne VIh Na81 —y��y� 950 2].% Dll]D-MCMnIY G-CakupW 81010 SOD. 5-day, pnem nmeval K-Pemnl ReMovel 0 - •= BSOMO nV MN 29.% 0 o1GD.MonUJY G-CNeuYM Ilon"I'lli 93D m-% 01120-Mobbb G-C4 wd Stoll 8e1W.wuspan4E pswnl nmoval K-PawnRabowtweet" l 0 - te1 >= a50 M0 AV MN m-% 0 DIGC-AbnPf/ M-C wwb .Rao, SAwn son None lea pammelerr dom not cantaln any velum for the Sample mr Effluent Tmdllg. Men none MAID folbwin9 funds will be supmdNe for Mal mw: Unll9. NumOarof EKcunlom, FmgmmyWAmiysls,and Samplo Type. Edit Checa C. No... Connronu A ro.A. net Nano Type Slow Meg MOR pdf pee 1151500 AepaN Lae2Avetl8y JWAOAA fC1 Umr: admin®cMbdM,.pum.com Name: CIMy Cameron E+Aell: edmin®cemWigmupum.wm Dame: 2025-12-23 1029 (Rmelme:-O5'AO) Noon Loll Si wobf Hy User Info®rsmd.,RR pe M.mm Name: KenneOl SchenNLle E-MM1: In(o®ramden,m,. u a.mm Oaf rne: 2025-12-2421:30 (]Ima2pm:415:00)