HomeMy WebLinkAboutMN-SJC-04-08-26ITHACA AREA WASTEWATER TREATMENT FACILITY
TOWN OF ITHACA CITY OF ITHACA TOWN OF DRYDEN, OWNERS
525 THIRD STREET
ITHACA, NEW YORK 14850
(607) 273-8381
SJC MEETING
APRIL 8, 2026
P = Present, PZ = Present Via Zoom, E = Excused and A = Absent
STAFF
PZ Wendy Cole, City of Ithaca P Kelly Anderson, Town of Ithaca
A Scott Gibson, City of Ithaca P Joe Slater, Town of Ithaca
PZ Kelly VanRiper, City of Ithaca
GUEST
PZ Ken Scherrieble, Camden Group PZ Brigid Mulroe, B & L
PZ Peter Wernsdorfer, Camden Group PZ Jesse Semanchik, B & L
P = Present, PZ = Present Via Zoom, E = Excused and A = Absent
Called to Order 1:00 pm
1) Agenda Review – no changes
2) Consider approval of minutes: 12/23/25, 01/14/26, & 02/13/26
a. Motioned by Rich, Seconded by Dave, Unanimously Approved
3) Financials – Wendy
a. Review of 2026 monthly Financials
i. Nothing concerning, septage income is up over YTD projections
b. Discuss 2025 “mostly Complete” financials and cash planning
i. Currently showing a surplus of $279,598 but $150,000 was already encumbered forward to 2026, voted
on in December 2025
ii. Looks like it will leave around $130,000 net which would go into the fund balance
iii. Wendy said she would find the last fund balance breakdown and update it, send to SJC
c. Post 2020 Audits progress
i. City is still working with Bonadillo to clean up finances
ii. City has put out an RFP for a new audit firm. Wendy will provide updates when a firm has been
selected.
d. Project Finances – Close out old Ones
i. Wendy has more analysis to do but it appears, f0r projects:
1. Project 422J, various improvements has a cash balance of ~$88,800
2. Project 423J, boiler replacements, has a cash balance of $366,814
ii. Scott G, Wendy, and Dominic have a scheduled meeting to discuss Capital Projects. Wendy will report
back at next month’s meeting.
4) Operations & Engineering Report – Peter and Scott G
a. The plant is suffering from a filamentous bloom. Camden is applying appropriate remedies, and they are keeping
a close eye on it. It is affecting the effluent quality but not to the point of any violations.
b. Review monthly Report
i. Operations
1. nothing major to note outside of the report
2. Camden is looking into energy cost improvements with behind the meter battery wall and best
use of gas produced. They will report in June or July to the SJC.
ii. Reporting - no violations, regulatory reports were sent as scheduled
c. Influent Pumps Updates
i. Pumps. 1, 4, & 5 are working. No 3 is just back in service today, no 2 is being rebuilt at W2O
ii. Pumps 2 and 3 are 7500 gpm wet weather pumps, Pumps 1, 4, and 5 are regular 5000 gpm duty pumps
5) NYSDEC Permit Modification – Jesse
a. Update on NYS Communications
i. Permit revision is working its way through the DEC system.
b. Data Acquisition, Lake Monitoring – no report
6) Capital Improvement Project Update- Jesse and Scott G
a. WQIP Funding Meeting With DEC
i. Very productive meeting with the DEC regarding Water Quality Improvement Program grant.
ii. Based on the meeting, the SJC should expect DEC to send more materials soon. The understanding is
that the funds can be used throughout the plant on items related to phosphorus removal.
iii. We will have to work out the details on DEC. They indicated that there is flexibility with those funds.
b. Discuss Modified Short-Term Plan (2026/2027) Thinking, Finances and Schedule
i. B&L reviewed the 5 scenarios they prepared, the scenarios include various combinations of primaries
rehab, thickening improvements, dewatering improvement, and adding drying. The baseline project
described in the memo that went out last fall includes raw influent pumps, digester piping and valves,
septage receiving building improvements, Actiflo improvements, concrete repairs, windows and doors,
SCADA, and facility security.
ii. Smart play is to maximize the use of 10 million from WQIP for the short term improvements and the
apply for additional funds for the long term improvements.
iii. B&L believes that NYS would not support replacing the failing ActiFLo system with a totally new system
even if that makes sense financially in the mid term as NYS would not support spending the grant on
improvements that might be abandoned in the long term improvement work.
iv. Under these thoughts, Scenarios 2 and 3 are the most cost effective with Scenario 3 (base CIP plus
primaries, thickening, dewatering) the most attractive.
v. The biggest strategic question is how much in the short term do the owners want to spend for
engineering costs. There is a meeting next week re City’s thoughts on bonding to do that.
c. B & L Amendment 2 status
i. Discuss next month
7) Legal Services Procurement – Rod and Scott R
a. Currently interviewing 2 firms
b. SJC is looking to follow the Town’s lead
c. Scott Reynolds will contact the Town’s pick to see if they would be interested in representing the SJC.
8) Misc. updates
a. Foundational Agreements Approval Progress – Rich
i. Intermunicipal wastewater agreement was circulated to the signatories and discussed at the meeting.
The agreement is still out for review
ii. We are waiting on the City for the Plant-to-Plant agreement, currently operating according to the old
agreement. Robin will bring it up at Common Council meeting tonight as a nudge.
b. Town of Ithaca Interceptor Study Update – Joe
i. Joint inceptors are only between town of Ithaca and City of Ithaca but information from the study could
inform plant planning for I&I.
ii. The Larson Group has been doing some fieldwork. Second phase will be metering flows which would
not be until next year.
c. 2027 Budget Prep RFPs and RFQs – Scott G
i. We will revisit next month when Scott G is present.
Adjournment – 2:30 pm
Upcoming Meeting Date - May 13, 2026