Loading...
HomeMy WebLinkAboutMN-EBE-2025-07-21 July 21 2025 Electrical Board of Examiners Minutes In attendance: Rob Fell-deWalt Tim Hayes Max Paskin Rober t Sparks Chris Accardo -The Board met discuss implementation of new exam process -Below is a handout created by Chris Accardo detailing research done on this topic Board Came to the Following Consensus (1) Years of experience required will be 5, and with need to have been or worked under a licensed electrician in some jurisdiction (2) The City will move to using the ICC exam process in lieu of a City written exam (3) Continuing ed., will not be a requirement as this time, but may be rolled out later (4) Graduated licensure will not be enacted at this time, plan is to roll out after we see how updated exam works out (5) Details of implementation to be determined later Possible Ways to Apply ICC Exam for Ithaca Licensure Option A: Lowest amount of overhead and admin Option B: Slightly more admin for recert, and will impact “non-active” license holders Option C: More overhead, but more robust Option D: Most overhead, most robust, impacts “non-active” license holders Why Switch Licensure Process (1) Less liability, standardized (2) Less work in writing, management, grading, and security (3) Fairness: allows applicants a pathway to study (4) Possibly allows licensure and/or reciprocality in other jurisdictions (5) Let’s us create a standard for reciprocal licensing (ICC only) (6) Let’s us doing rolling licensure (could do 3-4 times a year) (7) Gives us pathway for graduated licensure (Residential, HVAC, Journeyman vs Master, etc) ***In addition to changing exam process, we should review required number years of experience and clarify experience requirements for Masters exam Ithaca: 3.5 Years Binghamton: 9000 hours apprenticeship for journey man, 2 years as journeyman Middletown: trade school +5 years or 7 years in field experience North Tonawanda: 5000 hours Newburgh: 5 years Jamestown: 5 years Auburn: 10 years City Code Changes Required The following City of Ithaca Code articles would need to be updated with our exam 146-36(A-B): Payment for exam 146-36E: If we want to limit reciprocality 146-36(C): If we require additional training etc 146-37A-D: A: When exams are given and minimum requirements B: Exam scope C: Grading and valuation D: Passing/failing procedures City Code Changes to Clarify/Re-Write? 146-35: Clean up wording ICC EXAM DETAILS SCOPE Click here for information regarding what to expect Before the Exam, Exam Day, and After the Exam Passing score is 75%. Exam Price $115.00 REFERENCES NFPA 70®: National Electrical Code® (NEC®), 2023 Edition $155.0 0 External References Ugly's Electrical Reference (any edition) —--------------------------------------------------------------------------------------------------------------------- General Knowledge Electrical Theory and General Electrical Load Calculations Code Definitions and Terms Plan Reading 12% Services and Service Equipment Services and Fault Current Service Load Calculations Service Equipment & Service Conductors Transformers System Grounding and Bonding Temporary Service Wiring 16% Feeders Load Calculations Equipment Grounding 4% Branch Circuits and Conductors Branch Circuit Calculation Overcurrent Protection Conductors Required Outlets & GFCI / AFCI Protection Equipment Grounding 16% Wiring Methods and Materials Raceway Installations Underground Wiring Methods Boxes and Enclosures Cabinets Panel Boards & Switchboards Clearance and Guarding Flexible Cords and Cables 19% Equipment and Devices Luminaires, Receptacles, Switches and Other Devices Appliances and Other Equipment Other Utilization Equipment Heating and Cooling Equipment 10% Control Devices Switches, Disconnects and Controllers 3% Motors and Generators Motors Generators 8% Special Occupancies, Equipment and Conditions Special Occupancies, Swimming Pools and Similar Installations Mobile Homes and RV Parks Data Processing Equipment Miscellaneous Special Equipment Emergency Systems Signaling and Fire Alarm Systems 12%