N. Schweitzer, 515 Cayuga Heights Road
J. Salerno, 515 Cayuga Heights Road
C. Gonzalez, Brotherton Construction
Members of the Public
Item 1 – Meeting called to order
• Chair F. Cowett opened the meeting at 7:00 pm.
Item 2 – October 27, 2025 Minutes
• The Board reviewed the minutes of the October 27, 2025 meeting.
M. Johnston
R. Segelken
RESOLUTION No. 450
APPROVING MINUTES OF OCTOBER 27, 2025
RESOLVED,that the written, reviewed and revised minutes of the October 27, 2025
meeting are hereby approved.
Chair F. Cowett, M. Johnston, J. Leijonhufvud, R. Segelken
M. McMurry
– None
Item 3 – Public Comment
• No members of the public wished to comment.
2
Item 4 – Site Plan Review – 515 Cayuga Heights Road
• Chair F. Cowett stated that on September 29, 2025 the Planning Board approved with
conditions the site plan for the construction of a new residence on an unimproved lot
at 515 Cayuuga Heights Road; subsequent to that approval, an Article 78 proceeding
was initiated pursuant to a variance granted by the Village’s Zoning Board of Appeals
for the proposed height of the residence; also subsequent to site plan approval, the
applicant discovered more bedrock on site than had been anticipated which made the
proposed design difficult to achieve and a redesign of the residence followed; changes
made in the redesign included eliminating a walk-in basement and lowering building
height so that its height would comply with the requirements of the Village’s Zoning
Law; the variance granted by the Village’s ZBA became moot and the Article 78
proceeding was withdrawn.
• Chair F. Cowett further stated that the redesign also included a change to the
residence footprint and its location on site, shifting a water garden in front to the
south, and adding a rain garden in back of the residence; the Village’s Zoning Officer
determined from a revised plan and elevations provided by the applicant that, first,
lot coverage, setbacks, and building height complied with requirements of the
Village’s Zoning Law and, second, pursuant to § 305-118.I of the Village’s Zoning
Law, changes were substantial enough for the Planning Board to reconsider its site
plan approval and to determine if the effect of the proposed changes required a new
site plan application; the revised plan and elevations submitted by the applicant and
the Zoning Officer’s Report were posted to the Planning Board’s webpage and made
available to the public in advance of this meeting; a public hearing was also scheduled
for tonight’s meeting with ten days public notice given in advance of the meeting.
• The public hearing commenced at 7:03 pm.
• No members of the public wished to speak.
• Chair F. Cowett stated that the public hearing would remain open in case members of
the public wished to speak later in the meeting or to ask questions.
• Chair F. Cowett asked the applicant if the carport in the approved site plan was now a
garage and if its location had shifted slightly to the north and west.
• N. Schweitzer, 515 Cayuga Heights Road, replied that the carport was now a garage
and its location had shifted slightly towards a clearing to avoid cutting trees.
• Chair F. Cowett asked about shifting the location of the rain garden in front.
• N. Schweitzer replied that the rain garden had shifted slightly to the west and south
to accommodate the planting of evergreen trees to reduce the view of the residence
from Cayuga Heights Road.
• C. Gonzalez, Brotherton Construction, stated that the rain garden in front had been
resized and is smaller due to the addition of a rain garden behind the residence which
reduced required capacity for the rain garden in front.
• Chair F. Cowett asked about the rationale for adding the rain garden in back.
3
• C. Gonzalez replied that further stormwater analysis by T.G. Miller and the steepness
of the slope behind the residence suggested the need for the rain garden in back.
• M. Johnston asked about the French drain shown on the revised plan leading to the
rain garden in back and the location of piping leading from the rain garden.
• C. Gonzalez replied that the French drain will be comprised of stone and piping
leading from the rain garden will be located beneath the back patio.
• M. Johnston stated that piping beneath the patio could be a future maintenance
concern for the applicant.
• Chair F. Cowett asked if the same type of siding for the residence is being used in the
redesign.
• C. Gonzalez replied that the same type of siding is being used with the exception of
the stucco in what was the residence’s south wing which has been eliminated.
• Chair F. Cowett asked if most of the residence redesign consisted of changes to the
floor plan.
• N. Schweitzer replied that the floor plan changed dramatically with the elimination
of the basement; the residence is now a single story with an unfinished attic.
• M. Johnston asked, given the choice of roofing which can be noisy, whether thought
had been given to the type of insulation being used and if the residence will continue
to be all-electric.
• C. Gonzalez replied that the insulation plan is still being considered and that the
residence remains all-electric.
• J. Leijonhufvud stated that there is still a lot of glazing which can create issues with
bird strikes and asked if the applicant has considered appliques on the windows.
• N. Schweitzer replied that he checked with the window manufacturer and was told
that adding anything to the windows would void their warranty.
• J. Leijonhufvud stated that exterior lighting design can help to minimize bird strikes
and suggested the applicant consult the Lab of Ornithology website to learn more
about this prior to construction.
• Chair F. Cowett asked if the driveway entrance on Cayuga Heights Road has been
moved slightly to the south.
• C. Gonzalez replied that the the driveway entrance was moved a few feet to the south
and that driveway grade remains about 8% which complies with Village code.
• R. Segelken asked why more test boring hadn’t been done prior to the project’s initial
design if bedrock was the reason for the residence redesign.
• N. Schweitzer replied that bedrock was one reason for the residence redesign, but
equally important was wanting to be responsive to neighbor concerns about the
initial design.
• R. Segelken stated that the applicant has done a good job of hiding as much as possible
the view of the residence from Cayuga Heights Road.
• Board members and the public had no further questions or comments.
4
Motion: J. Leijonhufvud
M. McMurry
that the public hearing regarding the site plan for the proposed project at the
515 Cayuga Heights Road be closed.
Chair F. Cowett, M. Johnston, J. Leijonhufvud, M. McMurry, R. Segelken
None
• The public hearing closed at 7:28 pm.
R. Segelken
M. Johnston
RESOLUTION No. 452
REGARDING PROPOSED CHANGES TO THE SITE PLAN PREVIOUSLY APPROVED BY
THE PLANNING BOARD AT 515 CAYUGA HEIGHTS ROAD
WHEREAS, on September 29, 2025 the Village of Cayuga Heights Planning Board approved
with conditions a site site plan for a new residence on an unimproved lot at 515 Cayuga
Heights Road which included a variance approved by the Village’s Board of Appeals for the
height of the residence; and
the applicant has since proposed changes to that site plan, including but not
limited to the design, location, and footprint of the new residence proposed for 515 Cayuga
Heights Road, and has provided a plan and elevations documenting these changes; and
, proposed residence height is now in compliance with the requirements of the
Village’s Residence Zone, the variance is now moot, and an Article 78 proceeding initiated
pursuant to the approval of the variance has been withdrawn; and
the Planning Board has held a public hearing to receive comments from the
public concerning the proposed changes to the previously approved site plan; and
, the Planning Board has carefully considered at this meeting the impact of the
proposed changes to the previously approved site plan;
5
NOW, THEREFORE, BE IT RESOLVED THAT, the Village of Cayuga Heights Planning
Board does find that the proposed changes to the site plan previously approved with
conditions by the Planning Board are not substantial enough to require a new site plan
application by the applicant and that the site plan previously approved with conditions
remains in effect.
Chair F. Cowett, M. Johnston, J. Leijonhufvud, M. McMurry, R. Segelken
– None
• Chair F. Cowett asked if an agreement had been signed with the property owners at
120 Cayuga Park Road allowing water, electrical, gas, and sewer lines traversing the
parcel at 515 Cayuga Heights Road to connect the parcel at 120 Cayuga Park Road
with utility lines and a sewer line located on Cayuga Heights Road.
• N. Schweitzer replied that he has an agreement with the property owners at 120
Cayuga Park Road, but that it hasn’t yet been finalized by their respective lawyers.
• M. Johnston asked Code Enforcement Office B. Cross about possible drainage issues
on Cayuga Heights Road.
• Code Enforcement Office B. Cross replied the Cayuga Heights Road drainage system
has been upgraded recently and he doesn’t anticipate any drainage issues.
• C. Gonzalez stated that T.G. Miller is revising stormwater calculations and will have
them for Code Enforcement Office B. Cross in a couple of weeks.
• Code Enforcement Office B. Cross asked Deputy Clerk K. Perkins to confirm for the
record that notices of the meeting and public hearing were mailed out properly.
• Deputy Clerk K. Perkins confirmed that notices of the meeting and public meeting
were mailed out properly and none were returned.
• M. McMurry thanked the applicant for creating the website for the project which was
informative and transparent.
Item 5 – New Business
• Chair F. Cowett stated that the Board of Trustees will continue its review of the
proposed East Upland Road PDZ at a special meeting on Thursday March 5th; if the
PDZ is approved, the Planning Board will conduct site plan review of the project.
• M. Johnston asked Code Enforcement Officer B. Cross about a vacant house located
on North Triphammer Road property opposite Kendal.
• Code Enforcement Officer B. Cross replied that there have been legal issues related to
assumption of the mortgage following the deaths of the property owners.
• R. Segelken asked Code Enforcement Officer B. Cross about an old house on Hanshaw
Road near RaNic Golf Club.
• Code Enforcement Officer B. Cross replied that the property owner, who has lived
there since childhood, is uninterested in maintaining the house; he has tried to work
6
with the property owner and encourage him to be more proactive in maintaining the
house; it is an ongoing situation.
• M. McMurray asked Code Enforcement Officer B. Cross about the timeline of the
Cayuga Heights Road sidewalk project.
• Code Enforcement Officer B. Cross replied that, although securing easements from
property owners for the sidewalk hasn’t been a problem, the project has been pushed
back until 2027 because of delays from DOT for design approval; because there has
been significant cost escalation since the grants for the project were awarded, project
scope has been downsized to meet the funds that are available and the Village will
seek additional grant funding to complete the full project.
• Chair F. Cowett stated that the next regularly scheduled meeting of the Planning
Board will be held on Monday March 23, 2026 at 7:00 pm at Marcham Hall.
Item 6 – Adjourn