Loading...
HomeMy WebLinkAboutFinal Design BudgetVillage of Cayuga Heights Cayuga Heights Road Culvert Right Sizing 2019 CFA Grant vs Final Design Budget Culvert # L o�T 4 4A 6 7 I7Dlverslon �N 8 9 10 11 Replacement Culvert Description Estimated Construction Cost 2019 CFA Grant Preliminary Design 2019 CFA Grant Preliminary Design Size Reduction Ranlara JA" r'MP with 55 Rpnlarp 74" CIVIR with JdQ fggj I " HOPE & feet of 42" HOPE 2 Storm Mar holes $ 35,004 $ Replace 24" HDPE with Replace 24" HOPE with 42" HDPE and 3 42' HDPE and 2 Storm Storm Manholes Manholes $ 161,142 $ Replace 24" with 48" Replace 24" & 36" Steel with 60" HDPE and HDPE and 2 Storm 2 Storm Manholes Manholes $ 139,858 $ Replace 24" Steel with Replace 24/18" Steel with 36" HDPE and 1 Steel Pipe -Arch 57"x38" Storm Manhole $ 29,974 $ Replace 18" HDPE with Replace 18" & 24" with 48" HOPE and 2 36" HDPE and 2 Storm Storm Manhole Manholes $ 89,985 $ Install 308 LF of 24" HDPE and 2 Storm NA Manholes between Culverts 97 & #8 S S Replace 24" Steel with Replace 24" Steel with 24" HDPE and 1 Steel Pipe -Arch 42"x29" Storm Manhole $ 23,828 $ Replace Steel Pipe -Arch Replace Steel Pipe -Arch 35"x24" with Steel 35"x24" with Steel Pipe Pipe -Arch 71"x47" Arch 57"x38" $ 29,292 $ Replace 30" Steel with Replace 30" Steel with 60" HDPE and Storm Steel Pipe -Arch 71"x47" Manhole $ 44,278 $ Replace 18" HOPE with Replace 15" HDPE with 30" HDPE and Storm Steel Pipe -Arch 57"x38" Manhole $ 42,407 $ SUBTOTAL CONSTRUCTION $ 595,768 $ Change from previous estimate NA $ 109,490 $ 109,490 $ 123,082 $ 99,425 S 181,255 $ 149,060 $ 45,604 $ 34,942 $ Significant Changes (Size Reduction -Update) Final Design Bedrock is deeper than on V Snall assumed. P - 93,882 Stone headwall added. No change in bedrock. 1ol,zss Stone headwall added. Bedrock is deeper than originally assumed, 149,577 Stone headwall added. Bedrock depth is similar to what was originally -,assumed: 44,092 _ Stone headwall added. Bedrock depth is deeper than " originally assumed. 98,008 $ 66,969 $ 72,337 yr No significant change. Stone headwall added.- Bedrock is deeoet than originally assumed. 42,267 $ 42,267 $ 38,415 Stone headwall added. No significant change in assumed bedrock depth. 80,033 $ 45,383 $ S3,781 Stone headwall added. Bedrock should be deeper than originally assumed. 89,239 S 64,262 $ 65,767 Stone headwall added. Bedrock is deeperthan originally assumed. 54.152 S 33.006, $ 35,092 888,082 ,$ 703,754 719,152 292,314 $ 184,327.55 $ \ 15,398 T,G. Miller, P.C. 1 10/20/2021