Loading...
HomeMy WebLinkAboutPlansS S S S S S S S S S S S S S S S S S S S S S S S S Existi n g 6 ' P r i v a t e S a n i t a r y E a s e m e n t S S S S S S N . S u n s e t D r i v e -2' MH MH 640 644 646 648 650 652 654 6 5 6 660 662658 634 638 664 666 30% SLOPE 60 0 C A Y U G A H E I G H T S R O A D 604 C A Y U G A H E I G H T S R O A D -1' -2' -2' 636 40% S L O P E 648 P 6 5 2 P 6 5 0 6 4 0 65 0 P 6 6 0 Fisher, GeoFFrey & Katie 1.-3-11.2 211 North suNset Drive S.G. 1" = 10' S-1 22-166 EX I S T I N G S I T E VI L L A G E O F C A Y U G A H E I G H T S , I T H A C A , N E W Y O R K ST A R L A N D B U I L D E R S 21 1 N . S u n s e t P a r k SCALE: 1" = 10'-0" 10'0'10'15' Mar 3, 2023 S S S S S S S S S S S S N . S u n s e t D r i v e -2' MH MH 640 644 646 648 650 652 654 6 5 6 660 662658 634 638 664 666 30% SLOPE 60 0 C A Y U G A H E I G H T S R O A D 604 C A Y U G A H E I G H T S R O A D -1' -2' -2' 636 40% S L O P E 648 P 6 5 2 P 6 5 0 6 4 0 65 0 P 6 6 0 Fisher, GeoFFrey & Katie 1.-3-11.2 211 North suNset Drive Silt Fence Stabi l i z e d C o n s t r u c t i o n Entr a n c e Proposed 15" CpEp Culvert Daylight drain to 631.25+/- 4'L x 2'W Rip-Rap Emergency Overflow Inv. El. 635.60' D r i v e w a y L e n g t h , 9 9 - L F 6 4 0 6 4 2 64 2 S S S S S S S S S S S S S S S S S S S S Relocated Sewer with 6' Private Easement Install Cleanouts at Each Bend S S S S 6 4 0 6 4 6 6 4 8 6 5 0 6 5 2 64 4 . 5 0 ' 64 4 6 4 6 6 4 8 6 5 0 6 5 2 Retaining Wall 6 5 4 6 4 4 6 3 8 6 3 6 6 3 5 6 3 6 Water Quality Bio-Swale Floor of Practice - 243-SF Designed for 10 Yr Storm A v g . S l o p e , 9 . 0 % 64 3 64 4 S.G. 1" = 10' S-2 22-166 ER O S I O N A N D S E D I M E N T CO N T R O L P L A N VI L L A G E O F C A Y U G A H E I G H T S , I T H A C A , N E W Y O R K ST A R L A N D B U I L D E R S 21 1 N . S u n s e t P a r k SCALE: 1" = 10'-0" 10'0'10'15' Mar 3, 2023 S.G. N.T.S. S-3 22-166 E& S C D E T A I L S VI L L A G E O F C A Y U G A H E I G H T S , I T H A C A , N E W Y O R K ST A R L A N D B U I L D E R S 21 1 N . S u n s e t P a r k Mar 3, 2023 5. STOCKPILES, BORROW AREAS AND SPOIL AREAS SHALL BE SHOWN ON THE PLANS AND 3. FILL MATERIAL SHALL BE FREE OF FROZEN PARTICLES, BRUSH, ROOTS, SOD, OR OTHER FOREIGN OR OTHER OBJECTIONABLE MATERIALS SHALL BE SUBJECT TO THE PROVISIONS OF THIS STANDARD AND SPECIFICATION. ACCORDANCE WITH THE STANDARD AND SPECIFICATION FOR SUBSURFACE DRAIN 4. SEEPS OR SPRINGS ENCOUNTERED DURING CONSTRUCTION SHALL BE HANDLED IN THAT WOULD INTERFERE WITH OR PREVENT CONSTRUCTION OF 2. ALL FILL TO BE PLACED AND COMPACTED IN LAYERS NOT TO EXCEED 9 INCHES SUPPORT BUILDINGS, STRUCTURES AND CONDUITS, ETC. SHALL BE COMPACTED 1. ALL FILLS SHALL BE COMPACTED AS REQUIRED TO REDUCE EROSION, SLIPPAGE, IN ACCORDANCE WITH LOCAL REQUIREMENTS OR CODES. SETTLEMENT, SUBSIDENCE OR OTHER RELATED PROBLEMS. FILL INTENDED TO OR OTHER APPROVED METHOD. SATISFACTORY FILLS. IN THICKNESS. 1. PHYSICALLY MARK LIMITS OF LAND DISTURBANCE ON THE SITE WITH TAPE, SIGNS, OR ORANGE CONSTRUCTION FENCE, SO THAT WORKERS CAN SEE THE AREAS TO BE PROTECTED. 2. DIVERT OFF-SITE RUNOFF FROM HIGHLY ERODIBLE SOILS AND STEEP SLOPES TO STABLE AREAS. 3. CLEAR ONLY WHAT IS REQUIRED FOR IMMEDIATE CONSTRUCTION ACTIVITY. LARGE PROJECTS SHOULD BE CLEARED AND GRADED AS CONSTRUCTION PROGRESSES. AREAS EXCEEDING TWO ACRES IN SIZE SHOULD NOT BE DISTURBED WITHOUT A SEQUENCING PLAN THAT REQUIRES PRACTICES TO BE INSTALLED AND THE SOIL STABILIZED, AS DISTURBANCE BEYOND THE TWO ACRES CONTINUES. MASS CLEARINGS AND GRADING OF ENTIRE SITE SHOULD BE AVOIDED. 4. RESTABILIZE DISTURBED AREAS AS SOON AS POSSIBLE AFTER CONSTRUCTION IS COMPLETED. ON SITES GREATER THAN TWO ACRES IN SIZE, WAITING UNTIL ALL DISTURBED AREAS ARE READY FOR SEEDING IS UNACCEPTABLE. FOURTEEN DAYS SHALL BE THE MAXIMUM EXPOSURE PERIOD. MAINTENANCE MUST BE PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION. EXCEPT AS NOTED BELOW, ALL SITES SHALL BE SEEDED AND STABILIZED WITH EROSION CONTROL MATERIALS, SUCH AS STRAW MULCH, JUTE MESH, OR EXCELSIOR, INCLUDING AREAS WHERE CONSTRUCTION HAS BEEN SUSPENDED OR SECTIONS COMPLETED: A. FOR ACTIVE CONSTRUCTION AREAS SUCH AS BORROW OR STOCKPILE AREAS, ROADWAY IMPROVEMENTS AND AREAS WITHIN 50 FT. OF A BUILDING UNDER CONSTRUCTION, A PERIMETER SEDIMENT CONTROL SYSTEM CONSISTING, FOR EXAMPLE, SILT FENCING, SHALL BE INSTALLED AND MAINTAINED TO CONTAIN SOIL. EXPOSED DISTURBED AREAS ADJACENT TO A CONVEYANCE THAT PROVIDES RAPID OFF-SITE DISCHARGE OF SEDIMENT, SUCH AS A CUT SLOPE AT AN ENTRANCE, SHALL BE COVERED WITH PLASTIC OR, GEOTEXTILE FABRIC TO PREVENT SOIL LOSS UNTIL IT CAN BE STABILIZED. STABILIZED CONSTRUCTION ENTRANCES WILL BE MAINTAINED TO CONTROL VEHICLE TRACKING MATERIAL OFF-SITE. B. ON THE CUT SIDE OF ROADS, DITCHES SHALL BE STABILIZED IMMEDIATELY WITH ROCK RIP-RAP OR OTHER NON-ERODIBLE LINERS (EG. ROLLED EROSION PRODUCTS), OR WHERE APPROPRIATE, VEGETATIVE MEASURES SUCH AS SOD. C. PERMANENT SEEDING SHOULD OPTIMALLY BE UNDERTAKEN IN THE SPRING FROM MARCH THROUGH MAY, AND IN LATE SUMMER AND EARLY FALL FROM SEPTEMBER TO OCTOBER 15. DURING THE PEAK SUMMER MONTHS AND IN THE FALL AFTER OCTOBER 15, WHEN SEEDING IS FOUND TO BE IMPRACTICABLE, AN APPROPRIATE TEMPORARY MULCH SHALL BE APPLIED. PERMANENT SEEDING MAY BE UNDERTAKEN DURING THE SUMMER IF PLANS PROVIDE FOR ADEQUATE WATERING. TEMPORARY SEEDING WITH RYE CAN BE UTILIZED THROUGH NOVEMBER. D. ALL SLOPES STEEPER THAN 3:1 (H:V), OR 33.3%, AS WELL AS PERIMETER DIKES, SEDIMENT BASINS AND TRAPS, AND EMBANKMENTS SHALL, UPON COMPLETION, BE IMMEDIATELY STABILIZED WITH SOD, SEED AND ANCHORED STRAW MULCH, OR OTHER APPROVED STABILIZATION MEASURES. AREAS OUTSIDE OF THE PERIMETER SEDIMENT CONTROL SYSTEM SHALL NOT BE DISTURBED. MAINTENANCE SHALL BE PERFORMED AS NECESSARY TO ENSURE CONTINUED STABILIZATION. E. TEMPORARY SEDIMENT TRAPPING DEVICES SHALL NOT BE REMOVED UNTIL PERMANENT STABILIZATION IS ESTABLISHED IN ALL CONTIRBUTORY DRAINAGE AREAS. SIMILARLY, STABILIZATION SHALL BE ESTABLISHED PRIOR TO CONVERTING SEDIMENT TRAPS/BASINS INTO PERMANENT (POST-CONSTRUCTION) STORMWATER MANAGEMENT PRACTICES. 5. IF TEMPORARY WORK ROADS OR HAUL ROADS CROSS STREAM CHANNELS, ADEQUATE WATERWAY OPENINGS SHALL BE CONSTRUCTED USING SPANS, CULVERTS, WASHED ROCK BACKFILL, OR OTHER ACCEPTABLE, CLEAN METHODS THAT WILL ENSURE THAT ROAD CONSTRUCTION AND THEIR USE DO NOT RESULT IN TURBIDITY AND SEDIMENT DOWNSTREAM. ALL CROSSING ACTIVITIES AND APPURTENANCES ON STREAMS REGULATED BY ARTICLE 15 OF THE ENVIRONMENTAL CONSERVATION LAW SHALL BE IN COMPLIANCE WITH A PERMIT ISSUED PURSUANT TO ARTICLE 15 OF THE ECL. 6. MAKE SURE THAT ALL CONTRACTORS AND SUB-CONTRACTORS UNDERSTAND THE ESC PLAN AND SIGN THE CERTIFICATION STATEMENT REQUIRED BY NYSDEC GP. 7. DESIGNATE RESPONSIBLITY FOR THE ESC PLAN TO ONE INDIVIDUAL. THIS PERSON SHALL BE NAMED IN THE NOTICE OF INTENT. 8. AN ESC PLAN INSPECTION PROGRAM MEETING THE REQUIREMENTS OF THE NYSDEC GP, IS NECESSARY TO DETERMINE WHEN ESC MEASURES NEED MAINTENANCE OR REPAIR. PAY PARTICULAR ATTENTION TO INSPECTIONS REQUIRED AFTER RAINFALL. THE INSPECTION PROGRAM SHALL ALSO STATE THE COMPLETION OF IDENTIFIED REPAIR AND MAINTENANCE ITEMS. 9. IF CONSTRUCTION ACTIVITIES CONTINUE DURING WINTER, ACCESS POINTS SHOULD BE ENLARGED AND STABILIZED TO PROVIDE FOR SNOW STOCKPILING. IN ADDITION SNOW MANAGEMENT PLAN SHOULD BE PREPARED WITH ADEQUATE STORAGE AND CONTROL OF MELTWATER. A MINIMUM 25 FOOT BUFFER SHALL BE MAINTAINED FROM PERIMETER CONTROLS SUCH AS SILT FENCING. KEEP DRAINAGE STRUCTURES OPEN AND FREE OF SNOW AND ICE DAMS. INSPECTION AND MAINTENANCE ARE NECESSARY TO ENSURE THE FUNCTION OF THESE PRACTICES DURING RUNOFF EVENTS. EXCERPTS FROM NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL NOVEMBER 2016 GENERAL NOTES NYS STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDMIMENT CONTROL, NOVEMBER 2016 LAND GRADING SPECIFICATIONS TOP SOILING SPECIFICATIONS 1. PRESERVE EXISTING TOPSOIL IN PLACE WHERE POSSIBLE, THEREBY REDUCING THE NEED FOR ADDED TOPSOIL. 2. AS NEEDED, INSTALL EROSION CONTROL PRACTICES SUCH AS DIVERSIONS, CHANNELS, SEDIMENT TRAPS, AND STABILIZING MEASURES, OR MAINTAIN IF ALREADY INSTALLED. 3. COMPLETE ROUGH GRADING AND FINAL GRADE, ALLOWING FOR DEPTH OF TOPSOIL TO BE ADDED. 4. SCARIFY ALL COMPACT, SLOWLY PERMEABLE, MEDIUM AND FINE TEXTURED SUBSOIL AREAS. SCARIFY AT APPROXIMATELY RIGHT ANGLES TO THE SLOPE DIRECTION IN SOIL AREAS THAT ARE STEEPER THAN 5%. AREAS THAT HAVE BEEN OVERLY COMPACTED SHALL BE DECOMPACTED TO A MINIMUM DEPTH OF 12-INCHES WITH A DEEP RIPPER OR CHISEL PLOW PRIOR TO TOPSOILING. 5. REMOVE REFUSE, WOODY PLANT PARTS, STONES OVER 3-INCHES IN DIAMETER, AND OTHER LITTER. 6. TOPSOIL SHALL HAVE AT LEAST 6% BY WEIGHT OF FINE TEXTURED STABLE ORGANIC MATERIAL, AND NO GREATER THAN 20%. MUCK SOIL SHALL NOT BE CONSIDERED TOPSOIL. 7. TOPSOIL SHALL HAVE NOT LESS THAN 20% FINE TEXTURED MATERIAL (PASSING THE NO. 200 SIEVE) AND NOT MORE THAN 15% CLAY. 8. TOPSOIL TREATED WITH SOIL STERILANTS OR HERBICIDES SHALL BE SO IDENTIFIED TO THE PURCHASER. 9. TOPSOIL SHALL BE RELATIVELY FREE OF STONES OVER 1 1/2-INCHES IN DIAMETER, TRASH, NOXIOUS WEEDS SUCH AS NUT SEDGE AND QUACKGRASS, AND WILL HAVE LESS THAN 10% GRAVEL. 10. TOPSOIL CONTAINING SOLUBLE SALTS GREATER THAN 500 PARTS PER MILLION SHALL NOT BE USED. 11. TOPSOIL SHALL BE DISTRIBUTED TO A UNIFORM DEPTH OVER THE AREA. IT SHALL NOT BE PLACED WHEN IT IS PARTIALLY FROZEN, MUDDY, OR ON FROZEN SLOPES OR OVER ICE, SNOW, OR STANDING WATER PUDDLES. 12. TOPSOIL PLACED AND GRADED ON SLOPES STEEPER THAN 5% SHALL BE PROMPTLY FERTILIZED, SEEDED, MULCHED, AND STABILIZED BY "TRACKING" WITH SUITABLE EQUIPMENT. SECTION VIEW MIRAFI 100X, STABILINKA T140N, OR APPROVED EQUIVALENT. 1. WOVEN WIRE FENCE TO BE FASTENED SECURELY TO FENCE POSTS WITH WIRE TIES OR STAPLES. POSTS SHALL BE STEEL EITHER "T" OR "U" TYPE OR HARDWOOD. LAPPED BY SIX INCHES AND FOLDED. FILTER CLOTH SHALL BE EITHER FILTER X, 3. WHEN TWO SECTIONS OF FILTER CLOTH ADJOIN EACH OTHER THEY SHALL BE OVER- 2. FILTER CLOTH TO BE TO BE FASTENED SECURELY TO WOVEN WIRE FENCE SHALL BE WOVEN WIRE, 12 1/2 GAUGE, 6" MAXIMUM MESH OPENING. FENCE WITH TIES SPACED EVERY 24" AT TOP AND MID SECTION. 4. PREFABRICATED UNITS SHALL BE GEOFAB, ENVIROFENCE, OR APPROVED EQUIVALENT. 5. MAINTENANCE SHALL BE PERFORMED AS NEEDED AND MATERIAL REMOVED WHEN 10' MAX. C. TO C. WOVEN WIRE FENCE (MIN. 14 1/2 GAUGE W/ MAX. 6" MESH SPACING) CONSTRUCTION SPECIFICATIONS "BULGES" DEVELOP IN THE SILT FENCE. WOVEN WIRE FENCE (MIN. 14 1/2 GAUGE W/ MAX. 6" MESH SPACING) WITH FILTER CLOTH FLO W PERSPECTIVE VIEW COMPACTED SOIL 36" MIN. FENCE POST EMBED FILTER CLOTH A MIN. OF 6" IN GROUND. FLO W FLOW SILT FENCE UNDISTURBED GROUND HEIGHT OF FILTER = 16" MIN. 36" MIN. LENGTH FENCE POSTS DRIVEN MIN. 16" INTO GROUND. 20"MIN. 16"MIN. 8" MIN. 4" SYMBOL PROFILE NOT TO SCALE SAME ELEVATION 1. STONE WILL BE PLACED ON A FILTER FABRIC FOUNDATION TO THE LINES, 2. SET SPACING OF CHECK DAMS TO ASSUME THAT THE ELEVATIONS OF THE CREST OF THE DOWNSTREAM DAM IS AT THE SAME ELEVATION OF THE TOE OF THE 3. EXTEND THE STONE A MINIMUM OF 1.5 FEET BEYOND THE DITCH BANKS TO 4. PROTECT THE CHANNEL DOWNSTREAM OF THE LOWEST CHECK DAM FROM SCOUR AND EROSION WITH STONE OR LINER AS APPROPRIATE. 5. ENSURE THAT CHANNEL APPURTENANCES SUCH AS CULVERT ENTRANCES BELOW CHECK DAMS ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONE. CONSTRUCTION SPECIFICATIONS 9"MIN. SECTION A-A NOT TO SCALE GRADES AND LOCATIONS SHOWN IN THE PLAN. PREVENT CUTTING AROUND THE DAM. MAXIMUM DRAINAGE AREA 2 ACRES. CUTOFF TRENCH 18" WIDE 6" DEEP UPSTREAM DAM. FILTER FABRIC MIN. 1.5' FILTER FABRIC CUTOFF TRENCH DESIGN BOTTOM SPACING VARIES DEPENDING ON CHANNEL SLOPE B TOE B SLOPE X 24" MAX @ CENTER CHECK DAM SYMBOL SLOPE (FT/FT) H (Ft) 1 SECTION B-B NOT TO SCALE X = H 2 1 2 1 1 1 1 18" A A 24" MAX @ CENTER 6" CREST SYMBOL CONSTRUCTION SPECIFICATIONS GRASSED/VEGETATED SWALE G PLAN VIEW NOT TO SCALE NEED NOT BE COMPACTED POSITIVE DRAINAGE 18"MIN. EXISTING GROUND 18"MIN. 2'MIN. SUFFICIENT GRADE TO DRAIN CROSS SECTION NOT TO SCALE 2'MIN. FLOW SL O P E SEDIMENT & EROSION CONTROL MEASURES TYPICAL N.T.S. DIV E R S I O N DIV E R S I O N SIL T F E N C E SIL T F E N C E D D D D ST O C K P I L E OR U T I L I T Y EX C A V A T I O N ST A B I L I Z E D CO N S T R U C T I O N EN T R A N C E GRASSED/VEGETATED SWALE 1.DRAINAGE AREA SHALL BE LESS THAN 5 ACRES. 2.HEIGHT SHALL BE NO LESS THAN 18-INCHES FROM BOTTOM OF SWALE TO TOP OF DIKE EVENLY DIVIDED BETWEEN DIKE HEIGHT AND SWALE DEPTH. 3.BOTTOM WIDTH OF DIKE SHALL BE NO LESS THAN 2-FEET. 4.WIDTH OF SWALE SHALL BE NO LESS THAN 2-FEET. 5.SWALE SHALL HAVE POSITIVE DRAINAGE TO AN ADEQUATELY STABILIZED OUTLET TO AN UNDISTURBED AREA. MAXIMUM ALLOWABLE GRADE NOT TO EXCEED 8%. 6.THE DISTURBED AREA OF THE DIKE AND SWALE SHALL BE STABILIZED WITHIN 7 DAYS OF INSTALLATION, IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS FOR TEMPORARY SWALES. 7.DIVERTED RUNOFF FROM A DISTURBED OR EXPOSED UPLAND AREA SHALL BE CONVEYED TO A SEDIMENT TRAPPING DEVICE SUCH AS A TRAP, BASIN, OR TO AN AREA PROTECTED BY ANY OF THESE PRACTICES . 8.PERIODIC INSPECTION AND REQUIRED MAINTENANCE MUST BE PROVIDED AFTER EACH RAIN EVENT. MATERIAL STOCKPILING TEMPORARY CHECK DAMS REMOVE AFTER 80% GERMINATION SEE SITE PLAN SYMBOL CONSTRUCTION SPECIFICATIONS DIVERSION SWALE SECTION AS REQUIRED TO MEET THE CRITERIA SPECIFIED HEREIN, AND BE FREE OF SHALL BE REMOVED AND DISPOSED OF SO AS NOT TO INTERFERE WITH THE 2. THE DIVERSION SHALL BE EXCAVATED OR SHAPED TO LINE, GRADE, AND CROSS 1. ALL TREES, BRUSH, STUMPS, OBSTRUCTIONS, AND OTHER OBJECTIONABLE MATERIAL A. FOR DESIGN VELOCITIES OF LESS THAN 3.5 FT. PER. SEC., SEEDING AND 5. STABILIZATION SHALL BE DONE ACCORDING TO THE APPROPRIATE STANDARD DISPOSED OF SO THAT IT WILL NOT INTERFERE WITH THE FUNCTIONING OF THE 4. ALL EARTH REMOVED AND NOT NEEDED IN CONSTRUCTION SHALL BE SPREAD OR 3. FILLS SHALL BE COMPACTED AS NEEDED TO PREVENT UNEQUAL SETTLEMENT THAT BANK PROJECTIONS OR OTHER IRREGULARITIES WHICH WILL IMPEDE NORMAL FLOW. DIVERSION OF THE WATER UNTIL THE VEGETATION IS ESTABLISHED. EXCELSIOR MATTING OR WITH SEEDING AND MULCHING INCLUDING TEMPORARY SHALL BE STABILIZED WITH SOD, WITH SEEDING PROTECTED BY JUTE OR ENTERING THE DIVERSION DURING THE ESTABLISHMENT OF THE VEGETATION. DIVERSIONS OR OTHER MEANS SHOULD BE USED TO PREVENT WATER FROM IT IS RECOMMENDED THAT, WHEN CONDITIONS PERMIT, TEMPORARY MULCHING MAY BE USED FOR THE ESTABLISHMENT OF THE VEGETATION. PROPER FUNCTIONING OF THE DIVERSION. DIVERSION. B. FOR DESIGN VELOCITIES OF MORE THAN 3.5 FT. PER. SEC., THE DIVERSION AND SPECIFICATIONS FOR VEGETATIVE PRACTICES. WOULD CAUSE DAMAGE IN THE COMPLETE DIVERSION. D PARABOLIC CROSS-SECTION TRAPEZOIDAL CROSS-SECTION Z 1 WIDTH Z 1D b 4'MIN. FREEBOARD T T/2 D D/4 FREEBOARD 4'MIN. WIDTH 1.FOR RESIDENTIAL CONSTRUCTION, ONE SPECIFIC AREA ON EACH LOT SHALL BE DESIGNATED FOR TEMPORARY STOCKPILING OF TOPSOIL AND ALL OTHER CONSTRUCTION MATERIALS CONTAINING FINES THAT CAN BE MOVED BY RUNOFF. THIS AREA SHALL BE AS SMALL AS PRACTICABLE . 2.STOCK PILES WILL HAVE DOWN HILL SIDE PERIMETER SILT FENCING PROTECTION. REFERENCE SILT FENCE DETAILS THESE PLANS. 3.STOCK PILES WILL BE SEEDED AND MULCHED IF ANTICPATED TO BE LEFT IN PLACE 14-DAYS OR MORE. REFERENCE DETAIL SHEET NOTES AND SPECIFICATIONS THIS PLANT SET AND STORMWATER POLLUTION PREVENTION PLAN (SWPPP) ACCOMPANYING THIS PLAN SET. 4.SILT FENCE AND OTHER TEMPORARY CONTROL MEASURES SHALL BE IN PLACE BEFORE STOCKPILING OF MATERIALS. CONSTRUCTION SCE SYMBOL EXISTING PAVEMENT STABILIZED ENTRANCE (OPTIONABLE) MOUNTABLE BERM 12 ' M I N . GROUND EXISTING 6" MIN.FILTER CLOTH 3' 12' MIN. 50' MIN. 50' MIN. PAVEMENT EXISTING 10 ' M I N . 5: 1 10 ' M I N . CONSTRUCTION SPECIFICATIONS BE SUBJECT TO THE APPROVAL OF THE APPROPRIATE AUTHORITIES. 10. TEMPORARY CONSTRUCTION ENTRANCES, EXITS AND TEMPORARY ACCESS SHALL 9. PERIODIC INSPECTION AND NEEDED MAINTENANCE SHALL BE PROVIDED AFTER WITH STONE AND WHICH DRAINS INTO AN APPROVED SEDIMENT TRAPPINGS 8. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED ONTO PUBLIC RIGHTS-OF-WAY MUST BE REMOVED IMMEDIATELY. RIGHTS-OF-WAY. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACTED WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC 7. MAINTENANCE - THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION PIPING IS IMPRACTICAL, A MOUNTABLE BERM WITH 5:1 SLOPES WILL BE CONSTRUCTION ENTRANCES SHALL BE PIPED ACROSS THE ENTRANCE. IF 6. SURFACE WATER - ALL SURFACE WATER FLOWING OR DIVERTED TOWARD 5. FILTER CLOTH - WILL BE PLACED OVER THE ENTIRE AREA PRIOR TO PLACING AT POINTS WHERE INGRESS OR EGRESS OCCURS. TWENTY-FOUR (24) FOOT 4. WIDTH - TWELVE (12) FOOT MIN. BUT NOT LESS THAN THE FULL WIDTH 3. THICKNESS - NOT LESS THAN SIX (6) INCHES. LOT WHERE A 30 FOOT MIN. LENGTH WOULD APPLY). 2. LENGTH - NOT LESS THAN 50 FEET (EXCEPT ON A SINGLE RESIDENCE 1. STONE SIZE - USE 2" STONE OR RECLAIMED OR RECYCLED CONCRETE IF SINGLE ENTRANCE TO SITE. EQUIVALENT. EACH RAIN. DEVICE. PERMITTED. OF STONE. 1. THE WASHOUT FACILITY SHOULD BE SIZED TO CONTAIN SOLIDS, WASHWATER AND RAINFALL 2. WASHWATER SHALL BE ESTIMATED AT 7 GALLONS PER CHUTE AND 50 GALLONS PER HOPPER OF CONCRETE PUMP TRUCK AND/OR DISCHARGING DRUM. 3. THE MINIMUM SIZE SHALL BE 8' X 8' AT THE BOTTOM AND 2' DEEP. IF EXCAVATED, THE SIDE 4. LOCATE THE FACILITY A MINIMUM OF 100' FROM DRAINAGE SWALES, STORM DRAIN INLETS, WETALANDS, STREAMS AND OTHER SURFACE WATERS. PREVENT SURFACE WATER FROM ENTERING THE CONSTRUCTION SPECIFICATIONS AND SIZED TO ALLOW FOR THE EVAPORATION OF THE WASHWATER AND RAINFALL. SLOPES SHALL BNE 2 HORIZONTAL : 1 VERTICAL. CONCRETE WASHOUT STRUCTURE EXCEPT FOR THE ACCESS ROAD. 5. PROVIDE APPROPRIATE ACCESS WITH A GRAVEL ACCESS ROAD SLOPED DOWN TO STRUCTURE. 6. SIGNS SHALL BE PLACED TO DIRECT DRIVERS TO THE FACILITY AFTER THEIR LOAD IS DISCHARGED. 1. INSPECT ALL FACILITIES DAILY. REPAIR ALL DAMAGED OR LEAKING WASHOUT STATIONS IMMEDIATELY. THE LINER SHALL BE PLASTIC SHEETING WITH A MIN. THICKNESS OF 10 MILS WITH NO HOLES OR TEARS. ANCHOR THE LINER TO THE TOP OF THE PIT WITH AN EARTHEN BERM, SAND BAGS, STONE, ETC. MAINTENANCE 2. PUMP OUT ANY ACCUMULATED RAINWATER OVER HARDENED CONCRETE. 3. ACCUMULATED HARDENED MATERIAL SHALL BE REMOVED WHEN 75% OF THE STORAGE CAPACITY OF THE STRUCTURE IS FILLED. 4. DISPOSE OF HARDENED MATERIAL OFF-SITE IN A C/D LANDFILL. ON-SITE DISPOSAL IS ACCEPTABLE IF IT HAS BEEN APPORVED AND ACCEPTED AS PART OF THE SWPPP. 5. REPLACE THE PLASTIC LINER WITH EACH CLEANING OF WASHOUT FACILITY. 6. INSPECT THE PROJECT SITE FREQUENTLY TO ENSURE THAT NO CONCRETE DISCHARGES ARE TAKING PLACE IN NON-DESIGNATED AREAS. DESIGN CRITERIA Cross-Section Water Quality Bio-Swale MIRAFI 140N GEOTEXTILE #1 WASHED STONE SOIL MEDIUM PLANTING & TEMP. PONDING AREA DR A I N A G E L A Y E R PO R O S I T Y = 0 . 4 0 2" - 4" MULCH LAYER WATER QUALITY BIO-SWALE UNDERDRAIN LAYERS 0' - 6 " PO N D I N G D E P T H Rip Rap Weir Rip Rap Weir, 2-4" Stone 4' Long x 2' Wide 1' - 0 " 2' - 6 " EL. 634.50' EL.634.00' EL. 632.50' EL. 631.50' Top of Berm EL. 636.50' EL. 635.60' SPECIFICATIONS FOR FILTRATION LAYER Planting Soil The soil shall be a uniform mix, free of stones, stumps, roots or other similar objects larger than two inches. No other materials or substances shall be mixed or dumped within the bioretention area that may be harmful to plant growth, or prove a hindrance to the planting or maintenance operations. The planting soil shall be free of noxious weeds. Planting soil shall be of a sandy loam consistency containing approximately 75% concrete sand, 25% top soil and organics. Compaction Minimize compaction of both the base of the bioretention area and the required backfill. Place soil in lifts 12" or great. Do not use heavy equipment within the bioretention area basin. 4" PERF DRAIN PIPE Site Water Quality Volume Sizing WQv = [(P)(Rv)(A)] /12 = (1.0* 0.064”/AC * 0.60AC)/12 = 0.003AC-IN or 140-CF Rv = 0.05+0.009(I)  I = Impervious Cover (Percent) = 1.6% +/- Minimum Rv = 0.2 A = site area in acres = 0.60AC Practice floor surface area = 243-SF. This provides 230-CF of WQv treatment or, roughly 80%. S.G. N.T.S. S-4 22-166 WA T E R Q U A L I T Y S W A L E DE T A I L S VI L L A G E O F C A Y U G A H E I G H T S , I T H A C A , N E W Y O R K ST A R L A N D B U I L D E R S 21 1 N . S u n s e t P a r k Mar 3, 2023 S S S S S S S S S S S S S S S S N. S u n s e t D r i v e -2' MH MH 628 630 632 640 642 644 646 648 650 652 654 6 5 6 660 662658 634 638 664 672 666 668 670 30% SLOPE DRAIN A G E - N O T A N IDEN T I F I E D S T R E A M 646P 60 0 C A Y U G A H E I G H T S R O A D 6 0 4 C A Y U G A H E I G H T S R O A D GREATER T H A N 2 5 % S L O P E G R E A T E R T H A N 2 5 % S L O P E L E S S T H A N 2 5 % S L O P E 6 4 0 -1' -1' +1' -1.5' +1' -2' -1' -2' -2' 636 40% S L O P E 25' AT 8% SLOPE 648 P 6 5 2 P 65 0 6 5 0 6 4 0 65 0 P 64 0 P 6 6 0 6 6 0 644 P 642 P Fisher, GeoFFrey & Katie 1.-3-11.2 211 North suNset Drive 63 7 Existing Subcatchment 26,333-SF (0.60-AC) S S S 638 636 634 -2' 632 MH MH 628 630 632 640 642 644 646 648 650 652 654 6 5 6 660 662658 634 638 664 666 CULVERT 30% SLOPE DRAIN A G E - N O T A N IDEN T I F I E D S T R E A M 646P 60 0 C A Y U G A H E I G H T S R O A D 6 0 4 C A Y U G A H E I G H T S R O A D GREATER T H A N 2 5 % S L O P E G R E A T E R T H A N 2 5 % S L O P E L E S S T H A N 2 5 % S L O P E S E T B A C K 6 4 0 -1' -1' +1' -1.5' +1' -2' -1' -2' -2' 636 40% S L O P E 25' AT 8% SLOPE 648 P 6 5 2 P 65 0 6 5 0 65 0 P 64 0 P 6 6 0 6 6 0 644 P 642 P Fisher, GeoFFrey & Katie 1.-3-11.2 211 North suNset Drive Proposed Subcatchment Existing Subcatchment Site Runoff Rates and Volumes Existing 1 Yr (2.00")0.13 cfs 0.010 af 10 Yr (3.42")0.79 cfs 0.043 af Proposed 1 Yr (2.00")0.23 cfs 0.018 af 10 Yr (3.42")0.51 cfs 0.061 af S S S S S SMH W W W W Proposed 15" CpEp Culvert 6 4 0 6 3 8 6 4 2 64 2 S S S S S S S S S S S 64 0 6 4 6 6 4 8 6 5 0 6 5 2 64 4 . 5 0 ' 64 4 6 4 6 6 4 8 6 5 0 6 5 2 6 5 4 Proposed Subcatchment 26,333-SF (0.60-AC) 6 3 6 6 3 5 6 3 6 6 4 4 64 3 64 4 S.G. 1" = 20' S-5 22-166 HY D R A U L I C A N D H Y D R O L O G I C AN A L Y S I S W O R K S H E E T VI L L A G E O F C A Y U G A H E I G H T S , I T H A C A , N E W Y O R K ST A R L A N D B U I L D E R S 21 1 N . S u n s e t P a r k Mar 3, 2023