Loading...
HomeMy WebLinkAboutSEQR-FormPg. 1Page 1 of 3 Short Environmental Assessment Form Part 1 -Project Information Instructions for Completing Part 1 – Project Information. The applicant or project sponsor is responsible for the completion of Part 1. Responses become part of the application for approval or funding, are subject to public review, and may be subject to further verification. Complete Part 1 based on information currently available. If additional research or investigation would be needed to fully respond to any item, please answer as thoroughly as possible based on current information. Complete all items in Part 1. You may also provide any additional information which you believe will be needed by or useful to the lead agency; attach additional pages as necessary to supplement any item. Part 1 –Project and Sponsor Information Name of Action or Project: Project Location (describe, and attach a location map): Brief Description of Proposed Action: Name of Applicant or Sponsor:Telephone: E-Mail: Address: City/PO:State:Zip Code: 1.Does the proposed action only involve the legislative adoption of a plan, local law, ordinance, administrative rule, or regulation? If Yes, attach a narrative description of the intent of the proposed action and the environmental resources that may be affected in the municipality and proceed to Part 2. If no, continue to question 2. NO YES 2.Does the proposed action require a permit, approval or funding from any other government Agency? If Yes, list agency(s) name and permit or approval:NO YES 3.a. Total acreage of the site of the proposed action? __________ acres b. Total acreage to be physically disturbed? __________ acres c. Total acreage (project site and any contiguous properties) owned or controlled by the applicant or project sponsor? __________ acres 4.Check all land uses that occur on,are adjoining or near the proposed action: Rural (non-agriculture) Industrial Commercial Residential (suburban) Aquatic Other(Specify):Agriculture □ Urban □ Forest SEAF 2019 Parkland 408 E.Upland Road Office Building 408 East Upland Road Ithaca,NY 14850 The existing building at 408 East Upland Road will be removed to accommodate a new 5,500 SF single story multi-tenant office building.The building is being designed to be carbon-neutral and net-zero,with anticipation of photovoltaic panel installation at time of construction.The building will be contextual,respecting the scale of the residential properties that border two sides of the site,while creating contemporary space to attract business tenants.The building is designed to accommodate two tenants.Sciarabba Walker will be one of the tenants.The other tenant,not yet under contract,is anticipated to a professional business.Site work will consist of grading for a new parking lot,stormwater management,new plantings,as well as a wood fence and vegetative buffer screen. Lauren Butts,TWM A Fisher Associates Landscape Architecture Studio 607-210-8339 leb@twm.la 1001 West Seneca St.Suite 201 Ithaca NY 14850 Village of Cayuga Heights Zoning Board (setback variance,lot coverage) .56 .56 .56 Pg. 2Page 2 of 3 5.Is the proposed action, a.A permitted use under the zoning regulations? b.Consistent with the adopted comprehensive plan? NO YES N/A 6.Is the proposed action consistent with the predominant character of the existing built or natural landscape?NO YES 7.Is the site of the proposed action located in, or does it adjoin, a state listed Critical Environmental Area? If Yes, identify: ________________________________________________________________________________ NO YES 8.a.Will the proposed action result in a substantial increase in traffic above present levels? b.Are public transportation services available at or near the site of the proposed action? c.Are any pedestrian accommodations or bicycle routes available on or near the site of the proposed action? NO YES 9.Does the proposed action meet or exceed the state energy code requirements? If the proposed action will exceed requirements, describe design features and technologies: _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES 10.Will the proposed action connect to an existing public/private water supply? If No, describe method for providing potable water: _________________________________________ _____________________________________________________________________________________________ NO YES 11.Will the proposed action connect to existing wastewater utilities? If No, describe method for providing wastewater treatment: ______________________________________ _____________________________________________________________________________________________ NO YES archaeological sites on the NY State Historic Preservation Office (SHPO) archaeological site inventory? NO YES 13.a. Does any portion of the site of the proposed action, or lands adjoining the proposed action, contain wetlands or other waterbodies regulated by a federal, state or local agency? b.Would the proposed action physically alter, or encroach into, any existing wetland or waterbody? If Yes, identify the wetland or waterbody and extent of alterations in square feet or acres: _____________________ _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES 12.a. Does the project site contain, or is it substantially contiguous to, a building, archaeological site, or district which is listed on the National or State Register of Historic Places, or that has been determined by the Commissioner of the NYS Office of Parks, Recreation and Historic Preservation to be eligible for listing on the State Register of Historic Places? b.Is the project site, or any portion of it, located in or adjacent to an area designated as sensitive for The building is designed to be net-zero ready with photovoltaic panels anticipated to be installed at the time of construction.Heating and cooling will be provided by either air source heat pumps or ground source heat pumps.Lighting will be LED. The nearby Pleasant Grove Brook and Renwick Brook are identified in the National Wetland Inventory.The project parcel does not have any wetlands within the property or impact any nearby wetlands. Pg. 3Page 3 of 3 14.Identify the typical habitat types that occur on, or are likely to be found on the project site. Check all that apply: □Shoreline □ Forest Agricultural/grasslands Early mid-successional Wetland □ Urban Suburban 15.Does the site of the proposed action contain any species of animal, or associated habitats, listed by the State or Federal government as threatened or endangered?NO YES 16.Is the project site located in the 100-year flood plan?NO YES 17.Will the proposed action create storm water discharge, either from point or non-point sources? If Yes, a.Will storm water discharges flow to adjacent properties? b.Will storm water discharges be directed to established conveyance systems (runoff and storm drains)? If Yes, briefly describe: _____________________________________________________________________________________________ _____________________________________________________________________________________________ NO YES 18.Does the proposed action include construction or other activities that would result in the impoundment of water or other liquids (e.g., retention pond,waste lagoon, dam)? If Yes, explain the purpose and size of the impoundment:______________________________________________ ____________________________________________________________________________________________ _ NO YES 19.Has the site of the proposed action or an adjoining property been the location of an active or closed solid waste management facility? If Yes, describe: _______________________________________________________________________________ _____________________________________________________________________________________________ NO YES 20.Has the site of the proposed action or an adjoining property been the subject of remediation (ongoing or completed) for hazardous waste? If Yes, describe: _______________________________________________________________________________ _____________________________________________________________________________________________ NO YES I CERTIFY THAT THE INFORMATION PROVIDED ABOVE IS TRUE AND ACCURATE TO THE BEST OF MY KNOWLEDGE Date:_____________________Applicant/sponsor/name:____________________________________________________ __________________________ Signature: _____________________________________________________Title:__________________________________ Discharge of runoff will be to existing open drainage channel. No change in drainage patterns are proposed. Stormwater management is subject to review by Village of Cayuga Heights which is a registered MS4. Lauren Butts 02/18/22 Landscape Architect I PRINT FORM