HomeMy WebLinkAbout07.21.2021_Minutes
1
Minutes VILLAGE OF CAYUGA HEIGHTS Wednesday, July 21, 2021
Marcham Hall BOARD OF TRUSTEES 7:00 p.m.
MONTHLY MEETING
Present: Mayor Woodard; Trustees: Hubbell, Marshall, McMurry, Rennekamp, Robinson and Salton; Police Chief Wright,
Village Engineer Cross; Director of Public Works Wiese; Clerk Walker; Treasurer Laskaris; Attorney Marcus (arrives at 7:06
p.m.)
1. Call to Order: Mayor Woodard calls the meeting to order and welcomes the Board back in person at 7:02 p.m.
2. Approval of Meeting Minutes: June 16, 2021 (Exhibit 2022-036)
Resolution # 9015
BE IT RESOLVED THAT: the Village of Cayuga Heights Board of Trustees approves the June 16, 2021
Meeting Minutes as presented.
Motion: Trustee Robinson
Second: Trustee Marshall
Ayes: Mayor Woodard; Trustees: Hubbell, Marshall, McMurry, Rennekamp, and Robinson
Nays: none
Abstentions: Salton
Motion Carried
3. Report of Fire Superintendent Tamborelle: Submitted Report (Exhibit 2022-037)
•Fire Superintendent Tamborelle states that the department received 70 calls this month, which is a record
number. The increase was related to the many storms that caused damage in the Village.
•Fire Superintendent Tamborelle states the new ladder truck will be ready for inspection this November.
•The CHFD will be conducting a fall recruit class.
•Trustee Salton inquires if there will be any Village hydrant testing this year.
•Fire Superintendent Tamborelle states that he has been trying for years to get Bolton Point to allow the fire
department to test the hydrants. He further states that, since Bolton Point provides the water to our hydrants, they
are the only entity allowed to test hydrants.
•Village Attorney R. Marcus states that the Intermunicipal Water Agreement signed by the municipalities that
utilize Bolton Point decided that, in order to maintain the consistency and uniformity of the physical facilities
making up the water system, only Bolton Point would be allowed to conduct testing.
4. Privilege of the Floor: No members of the public wish to speak.
5. Report of Treasurer Laskaris:
2
•Treasurer Laskaris states that she has spent the last month working on the Annual Update Document (AUD).
Abstract # 2
Resolution: 9016
BE IT RESOLVED THAT: the Village of Cayuga Heights Board of Trustees approves Abstract #2 for
FYE2022 consisting of TA vouchers 4 -13 in the amount of $37,456.55 and Consolidated Fund vouchers 35-132
in the amount of $559,538.12 and the Treasurer is instructed to make payments thereon.
Motion: Trustee Robinson
Second: Trustee Marshall
Ayes: Mayor Woodard; Trustees: Hubbell, Marshall, McMurry, Rennekamp, Robinson and Salton
Nays: none
Abstentions: none
Motion Carried
6. Report of Mayor Woodard:
a. NYCLASS Update: Last month the Village Finance Committee recommended moving some municipal funds
into a money market fund where municipalities pool their resources to get better interest rates. There is no
minimum amount or minimum time for these deposits to be used and, as a municipality, there can be no loss of
principal.
•Mayor Woodard states that one idea would be to place all the property tax and American Rescue Funds (ARF)
monies into the NYCLASS fund and draw from that as needed.
•Trustee Hubbell is concerned that the Village could lose any principal invested. Trustee Rennekamp informs the
Board that because this money market is only for municipalities, there is no loss of principal.
•Treasurer Laskaris states that she spoke to Tompkins Trust Company (TTC) branch Manager Matt Valaik who
informed her that other municipalities are investing in NYCLASS and, if the Village did move some money from
their account to this money market account, it would not affect our relationship with the TTC.
•Currently we are earning 0.1% on our savings with TTC. NYCLASS has stated that we could be earning up to
five times that.
• Trustee Hubbell would like more details on the yield that NYCLASS has paid over the last few years
before supporting the investment.
• The Board agreed to pass a resolution to create the account, but to wait until after the August BOT
meeting to fund it.
Resolution # 9017
3
WHEREAS, New York General Municipal Law, Article 5-G Section 119-0 empowers municipal corporations
(defined in Article 5-G Section 119-n to include school districts, boards of cooperative educational services,
counites, cities, towns and villages, and districts) to enter into, amend cancel, and terminate agreements for the
performance among themselves of their respective functions, powers, and duties on a cooperative or contract
basis;
WHEREAS the Village of Cayuga Heights wishes to invest portions of its available investment funds in
cooperation with other corporations and/or districts pursuant to the NYCLASS Municipal Cooperation Agreement
Amended and Restated as of March 28, 2019 and,
WHEREAS, the Village of Cayuga Heights wishes to satisfy the safety and liquidity needs of their funds,
NOW THEREFOR BE IT RESOLVED that the Village Board of Trustees approves and authorizes Mayor
Woodard to participate in the NYCLASS program under the terms of the NYCLASS Municipal Cooperation
Agreement Amended and Restated as of March 28, 2019 and,
FURTHER BE IT RESOLVED THAT the Village Board of Trustees will not fund this account until after the
Board of Trustees meet on August, 18, 2021.
Motion: Trustee Rennekamp
Second: Trustee Robinson
Ayes: Mayor Woodard; Trustees: Marshall, McMurry, Rennekamp, Robinson and Salton
Nays: none
Abstentions: Hubbell
Motion Carried
b. FYE 2020-2021 Fund Balance: (Exhibit 2022-040)
•Mayor Woodard states that she has finished calculating the fund balance for the General, Water, and Sewer
Funds. The General Fund has a year-end balance of around two million dollars. The Water Fund will be closer
examined by the finance committee to determine the upcoming water and sewer rate. The Water Fund no longer
has any debt attached to that account.
•Treasurer Laskaris states that the Village had a million-dollar water project that provided better water pressure to
the lower Village and that the bond was paid off this past year which resulted in no debt on that fund.
c. American Rescue Fund (ARFP) Update:
•Mayor Woodard states that the Village will be receiving $184,068.50. At last month’s Board of Trustees
meeting, the Board ranked several projects that ARF would fund.
• Mayor Woodard would like to propose adding a Village-wide water pressure study to the list. T.G. Miller
conducted one fifteen years ago which resulted in the lower Village million-dollar water infrastructure
project.
•B. Cross obtained a copy of the T.G. Miller study that was conducted fifteen years ago and shared it with the
Board. He states that a new study is estimated to cost between $8,000 and $10,000.
4
d. Airbnb Update:
•The Village is still waiting on the short-term rental monitoring company (LTAS Technologies) to provide
information about who might be operating an Airbnb without a permit. Currently we have eight issued short-term
rental permits for 2021. LTAS Technologies is suggesting there are 28 Village residences listed on the Airbnb
platform.
•Trustee Salton states that he believes there are workarounds to this monitoring. The Board agrees but feels we
need to make every effort to enforce the existing law.
•Village Clerk Walker passes around the Short-Term Rental Permit Log with the names and addresses of those
who are registered as having or having had an Airbnb rental.
e. Kline Road By-Pass Update: An agreement has been made establishing an annual payment of $10,500 to the
Ithaca Area Wastewater Treatment Facility (IAWWTF) for the ability to send sewage to their plant. Going
forward, the Village will pay $1,100 annually for the ability to send sewage to the Ithaca plant.
•Mayor Woodard states that she received an email from Cynthia Brock requesting a modification to the agreement
presented from the previous month. Mayor Woodard reached out to Bill Goodman from the Town of Ithaca, and
he agreed another meeting should take place, at which members of the “Gang of Six” indicated their support for
the terms of the original agreement.
•Trustee Robinson, who also attended the last meeting, states that it was clear that all parties were on board.
•Mayor Woodard has re-asserted the fact that the Village will shut off the Kline Road By-Pass on August 15,
2021 if the agreement is not formalized by then.
f. Website Re-design-Floursish Design Studio: The Village Administrative Committee recommends Flourish
Design Studio to design and maintain the Village website.
•Mayor Woodard states that we will use the ARF’s fund to pay for this. Attorney R. Marcus recommends that the
Board of Trustees pass a resolution supporting this decision.
•Trustee Marshall asks Clerk Walker what the timetable is for completing the re-design. Clerk Walker states that
Flourish Design Studio estimated eight weeks.
Resolution: 9018
BE IT RESOLVED THAT: The Village of Cayuga Heights Board of Trustees approves and authorizes Mayor
Woodard to sign the contract with Flourish Design Studios to design and maintain a new Village website for one
year.
Motion: Trustee Salton
Second: Trustee McMurry
Ayes: Mayor Woodard; Trustees: Hubbell, Marshall, McMurry, Rennekamp, Robinson and Salton
Nays: none
Abstentions: none
5
Motion Carried
g. LED Update: NYPA Contractors were in the Village this week to address non-communicating LED fixtures.
•B. Cross states that there were about six non-communicating and six that did not have power. The Village is still
waiting for several other fixtures to be delivered and installed.
•Trustee Salton states that the North Triphammer decorative LED lights project light differently, and that needs to
be addressed.
•B. Cross state that there have been several resident requests for some sort of adjustment. Luckily, those issues
have been resolved with dimming. Once all of the lights have been installed, the Village will be signing a
maintenance agreement with NYPA.
•Mayor Woodard states that by buying the streetlights directly from NYSEG verses financing them through
NYPA, the Village has avoided paying any interest to date.
h. Appointment of Mark Tate and Daniel Szpiro to the Village ZBA: The Village Zoning Board of Appeals
accepted Jeff Sauer’s resignation. Mart Tate will be taking his place. Daniel Szpiro will join the Board as the
alternate, a position which has been empty since Mark Eisner resigned.
•Mayor Woodard states that Mark Tate is a long-time resident and is a scientist at Cornell University. Daniel
Szpiro is also a long-time resident and is a professor in the Samuel Curtis Johnson Graduate School of
Management at Cornell University.
•Mayor Woodard would like to appoint Mark Tate to the Village Zoning Board of Appeals as a full voting
member.
Resolution # 9019
BE IT RESOLVED THAT: The Board of Trustees approves the appointment of Mark Tate to the Village
Zoning Board of Appeals to complete the term left vacant by former Board member Jeff Sauer.
Motion: Trustee Salton
Second: Trustee Robinson
Ayes: Mayor Woodard; Trustees: Hubbell, Marshall, McMurry, Rennekamp, Robinson and Salton
Nays: none
Abstentions: none
Motion Carried
•Mayor Woodard would like to appoint Daniel Szpiro to the Village Zoning Board of Appeals as an alternate
voting member.
Resolution # 9020
6
BE IT RESOLVED THAT: The Board of Trustees approves the appointment of Daniel Szpiro as an alternate to
the Village Zoning Board of Appeals.
Motion: Trustee McMurry
Second: Trustee Marshall
Ayes: Mayor Woodard; Trustees: Hubbell, Marshall, McMurry, Rennekamp, Robinson and Salton
Nays: none
Abstentions: none
Motion Carried
7. Report of the Trustees:
a. Walking Safe Cayuga Heights Update:
•Trustee McMurry states that she has received the preliminary results of the architectural resources study from
Fisher and Associates that the Village was asked to conduct as part of the Walking Safe Cayuga Heights sidewalk
project. The results conclude that four of the five properties studied are eligible for the National Register of
historic structures.
•Trustee McMurry further states that the study will need to be reviewed by the historic resources office at
NYSDOT to determine whether the project will have any adverse impacgts on these structures. NYSDOTwill
then advise the Village of the next steps.
• As a result of this process, the Village will be requesting a 24-month extension for this project.
•Trustee Salton states that since we are going to have to wait even longer to start this project shouldn’t we re-
scope the cost of this project. We approved a project that was going to be done in a certain period of time. How is
that approval even relevant anymore?
•B. Cross states that it would be valid to ask for an engineer’s opinion of cost and, if there is no impact, then the
design of the plan will not change.
•Trustee McMurry states that the 4 houses eligible are: 903 and 701 Wyckoff, 100 Sunset Park, and 201 Cayuga
Heights Road. Ironically, the 511 Kline Rd property that is already in the historic district was deemed non-
contributing.
•In Closing, B. Cross states that at yesterday’s ITCTC meeting,an attending DOT regional employee indicatedthat
the Village would not be expected to do any additional steps for this project to move forward.
8. Report of Police Chief Wright: Submitted Report (Exhibit 2022-041)
•Chief Wright states that an individual who had a long history with the Village Police Department was arrested on
a bench warrant from our Village Court. The subject was taken into custody by CHPD officers, arraigned, and
remanded to Tompkins County Jail.
•Chief Wright states that part-time hours are up in order to cover vacations and training. Currently we have two
part-time positions available, and the goal will be to interview six candidates by the end of August.
7
9. Report of Director of DPW Wiese: Submitted Report (Exhibit 2022-042)
•Director Wiese states that he is going to fill the seasonal employee position with former employee Josh Randall.
There is also a possibility of one or more DPW employees retiring in the near future.
•Director Wiese states that the sewer lines along Pleasant Grove Rd have been videotaped and the footage is being
sent to Instiuform Pipe Lining Technologies. He is hopeful that the sleeving of the sewer line will take place in
September.
•The manhole work at the Kline Road bypass is complete and NYSEG will be installing electricity to operate the
sewer meter followed by the installation of the diversion weir.
•Director Wiese states that the DPW also fixed a sewer line leak at the intersection of Kline Road and Hanshaw
Road.
•Trustee Salton asks Director Wiese how he determined that there was a leak at that location. Director Wiese
states that two years ago Drain Brain was hired to video camera off-road sewer lines. Through viewing the video
footage, it was determined that there was an issue there.
•Trustees McMurry and Hubbell compliment the recent paving work. Director Wiese states that Seneca Paving
Company does a great job for the Village.
10. Report of Village Engineer Cross:
•B. Cross states that the DPW staff has completed repair of the storm damage on the Marcham Hall greenhouse.
•B. Cross, in an effort to ease any concerns, displays a piece of 50-year-old water main pipe. B. Cross states that
the pipe looks brand new. He is confident that we should not be as concerned about Village water infrastructure in
preparation for the flow testing and T.G. Miller report on water pressure.
•B. Cross States that the Planning and Design work by TG Miller Engineers continues on the Culvert Right Sizing
project for Cayuga Heights Road. In anticipation of the final design report, the Village will need to obtain 6-12
temporary easements from various landowners. B. Cross is hoping to present those easements at the August Board
of Trustees Meeting.
•Trustee Marshall asks what would happen if the landowner does not want to sign the easement? Village Attorney
R. Marcus states that this would fall under eminent domain, and it would become a legal proceeding.
•There was a ribbon cutting ceremony for the completion of Phase 1 of the WWTP renovation. That same
morning GHD had a Phase 2 pre-construction meeting with all the contractors. We did learn in that meeting that
the general contractor is not going to do any physical construction in this calendar year. The equipment they will
be installing for the digestive covers is very unique and requires significant design time to make sure it works.
The next step will be to find a source that can handle the WWTP liquid sludge during the time the current
digesters are being replaced.
•Trustee Salton would like to know how long we will need to outsource the sludge. B. Cross states that it could
be up to six months. B. Cross is hoping that the Ithaca Area Wastewater Treatment Facility will be able to process
that sludge during that period of construction, but there are other alternatives.
8
•Village Attorney R. Marcus ask if the IAWWTF is not able to take the WWTP sludge then where is the next
nearest facility that could? B. Cross states that Yaw’s (who manages the Village WWTP) has reached out to
Watkins Glen, Auburn, Cortland, and Corning area.
•Trustee Robinson thanks B. Cross for organizing the ribbon cutting ceremony at the WWTP.
11. Report of Clerk Walker: Submitted Report (Exhibit 2022-043)
•Clerk Walker states that, to date, the Village has collected $2,895,545.75 in property taxes leaving around
$65,000 remaining.
•Clerk Walker states that the new hire Kiersten (information aid), is doing a great job familiarizing herself with
all aspects of the job and is a quick learner.
•In closing, Clerk Walker informs the Board that he has communicated with several audio/video conferencing
companies and will be presenting three proposals to the Administrative Committee to set up Marcham Hall for
video conferencing.
•Trustee Salton suggests that the Village IT Committee review this information and make a determination to the
Board.
12. Report of Attorney Marcus:
•Village Attorney R. Marcus states that there is no new information on the topic of last month’s Executive
Session.
13. Executive Session: The Board enters Executive Session at 9:22 p.m.
Resolution: 9021
WHEREAS: The NYS Open Meeting Law §105 prescribes matters for which a public body may conduct an
executive session; and,
WHEREAS: Upon a majority vote of its total membership, taken in an open meeting pursuant to a motion
identifying the general area or areas of the subject or subjects to be considered; and,
WHEREAS: The conduct an executive session for these enumerated purposes only, provided, however, that no
action by formal vote shall be taken to appropriate public money:
THEREFORE, BE IT RESOLVED THAT, An Executive Session of the Village of Cayuga Heights Board of
Trustees is conducted for the purposes of subsection (D) discussions regarding proposed, pending or current
litigation.
Motion: Trustee Robinson
Second: Trustee Salton
Ayes: Mayor Woodard; Trustees: Hubbell, Marshall, McMurry, Rennekamp, Robinson, and Salton
Nays: none
Abstentions: none
Motion Carried
9
Resolution: 9022
BE IT RESOLVED THAT: the Village of Cayuga Heights Board of Trustees exits Executive Session and
returns to an open meeting.
Motion: Trustee Robinson
Second: Trustee Marshall
Ayes: Mayor Woodard; Trustees: Hubbell, Marshall, McMurry, Rennekamp, Robinson, and Salton
Nays: none
Abstentions: none
Motion Carried
13. Adjournment: Mayor Woodard adjourns the meeting at 10:18 p.m.