HomeMy WebLinkAboutVCayugaHeights_MCM3_MCM62019Auto Recyclers
Building Maintenance
Churches
Commercial Carwashes
Commercial Laundry/Dry Cleaners
Construction Vehicle Washouts
Cross-Connections
Distribution Centers
Food Processing Facilities
Garbage Truck Washouts
Hospitals
Improper RV Waste Disposal
Industrial Process Water
Other:
Sewersheds:
Landscaping (Irrigation)
Marinas
Metal Plateing Operations
Outdoor Fluid Storage
Parking Lot Maintenance
Printing
Residential Carwashing
Restaurants
Schools and Universities
Septic Maintenance
Swimming Pools
Vehicle Fueling
Vehicle Maint./Repair Shops
None
MS4 Annual Report Form
SPDES ID
Minimum Control Measure 3. Illicit Discharge Detection and Elimination
1.Enter the number and approx. percent of outfalls mapped:
3.a.What types of generating sites/sewersheds were targeted for inspection during this
reporting period?
#%
2.How many of these outfalls have been screened for dry weather discharges during this
reporting period (outfall reconnaissance inventory)?
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
The information in this section is being reported (check one):
On behalf of an individual MS4
On behalf of a coalition
How many MS4s contributed to this report?
MCM 3 Page 1 of 4
This report is being submitted for the reporting period ending March 9,
7368169291
7.Has the storm sewershed mapping been completed in this reporting period?
If No, approximately what percent was completed in this reporting period?
Yes No
%
8.Is the above information available in GIS?
Is this information available on the web?
If Yes, provide URL(s):
Yes No
URL
MS4 Annual Report Form
SPDES ID
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name of MS4/Coalition
Yes No
Please provide specific address of page where map(s) can be accessed - not home page.
MCM 3 Page 2 of 4
3.b.What types of illicit discharges have been found during this reporting period?
5.How many illicit discharges have been confirmed during this reporting period?
6.How many illicit discharges/illegal connections have been eliminated during this reporting
period?
Broken Lines From Sanitary Sewer
Cross Connections
Failing Septic Systems
Floor Drains Connected To Storm Sewers
Illegal Dumping
Other:
Industrial Connections
Inflow/Infiltration
Pump Station Failure
Sanitary Sewer Overflows
Straight Pipe Sewer Discharges
None
4.How many illicit discharges/potential illegal connections have been detected during this
reporting period?
URL
This report is being submitted for the reporting period ending March 9,
5953169299
9.Has an IDDE law been adopted for each traditional MS4 and/or have IDDE procedures been
approved for all non-traditional MS4s contributing to this report?
10.If Yes, has every traditional MS4 contributing to this report certified that this law is
equivalent to the NYS Model IDDE Law?
11.What percent of staff in relevant positions and departments has received IDDE training?
MS4 Annual Report Form
SPDES ID
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
Yes No
Yes No NT
MCM 3 Page 3 of 4
%
URL
URL
URL
8.URL(s) con't.:
Please provide specific address of page where map(s) can be accessed - not home page
URL
URL
This report is being submitted for the reporting period ending March 9,
5820169292
MS4 Annual Report Form
SPDES ID
12.Evaluating Progress Toward Measurable Goals MCM 3
Use this page to report on your progress and project plans toward achieving measurable goals
identified in your Stormwater Management Program Plan (SWMPP), including requirements in Part
III.C.1. Submit additional pages as needed.
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
MCM 3 Page 4 of 4
This report is being submitted for the reporting period ending March 9,
A.Briefly summarize the Measurable Goal identified in the SWMPP in this reporting period.
B.Briefly summarize the observations that indicated the overall effectiveness of this Measurable
Goal.
C.How many times was this observation measured or evaluated in this reporting period?
(ex.: samples/participants/events)
D.Has your MS4 made progress toward this measurable goal during this reporting period?
Yes No
E.Is your MS4 on schedule to meet the deadline set forth in the SWMPP?
Yes No
F.Briefly summarize the stormwater activities planned to meet the goals of this MCM during
the next reporting cycle (including an implementation schedule).
9126383899
1a.Has each MS4 contributing to this report adopted a law, ordinance or other regulatory
mechanism that provides equivalent protection to the NYS SPDES General Permit for
Stormwater Discharges from Construction Activities?
1b.Has each Town, City and/or Village contributing to this report documented that the law is
equivalent to a NYSDEC Sample Local Law for Stormwater Management and Erosion and
Sediment Control through either an attorney cerfification or using the NYSDEC Gap
Analysis Workbook?
If Yes, Towns, Cities and Villages provide date of equivalent NYS Sample Local Law.
Yes No
2.Does your MS4/Coalition have a SWPPP review procedure in place?Yes No
3.How many Construction Stormwater Pollution Prevention Plans (SWPPPs) have been
reviewed in this reporting period?
4.Does your MS4/Coalition have a mechanism for receipt and consideration of public
comments related to construction SWPPPs?
If Yes, how many public comments were received during this reporting period?
Yes No NT
5.Does your MS4/Coalition provide education and training for contractors about the local
SWPPP process?Yes No
09/2004 03/2006 NT
MS4 Annual Report Form
Minimum Control Measures 4 and 5.
Construction Site and Post-Construction Control
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
The information in this section is being reported (check one):
On behalf of an individual MS4
On behalf of a coalition
How many MS4s contributed to this report?
SPDES ID
MCM 4/5 Page 1 of 2
This report is being submitted for the reporting period ending March 9,
Yes No NT
5624056356
6.Identify which of the following types of enforcement actions you used during the reporting
period for construction activities, indicate the number of actions, or note those for which you
do not have authority:
Notices of Violation
Stop Work Orders
Criminal Actions
Termination of Contracts
Administrative Fines
Civil Penalties
Administrative Orders
Enforcement Actions or Sanctions
Other
#
#
#
#
#
#
#
#
No Authority
No Authority
No Authority
No Authority
No Authority
No Authority
No Authority
No Authority
MCM 4/5 Page 2 of 2
#
3951056357
Minimum Control Measure 4. Construction Site Stormwater Runoff Control
1.How many construction projects have been authorized for disturbances of one acre or more
during this reporting period?
2.How many construction projects disturbing at least one acre were active in your jurisdiction
during this reporting period?
3.What percent of active construction sites were inspected during this reporting period?
4.What percent of active construction sites were inspected more than once?
5.Do all inspectors working on behalf of the MS4s contributing to this report use the NYS
Construction Stormwater Inspection Manual?
MS4 Annual Report Form
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
SPDES ID
The information in this section is being reported (check one):
On behalf of an individual MS4
On behalf of a coalition
How many MS4s contributed to this report?
MCM 4 Page 1 of 3
Yes No NT
6.Does your MS4/Coalition provide public access to Stormwater Pollution Prevention Plans
(SWPPPs) of construction projects that are subject to MS4 review and approval?
If your MS4 is Non-Traditional, are SWPPPs of construction projects made available for
public review?
If Yes, use the following page to identify location(s) where SWPPPs can be accessed.
Yes No NT
%
%
This report is being submitted for the reporting period ending March 9,
NT
NT
Yes No
9445612573
6.con't.:
MS4 Annual Report Form
SPDES ID
City
Department
Address
Zip
-
Phone
()-
City
Address
Zip
-
Phone
()-
City
Address
Zip
-
Phone
()-
URL
MS4/Coalition Office
Library
Other
Web Page URL(s):
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
MCM 4 Page 2 of 3
Please provide specific address where SWPPPs can be accessed - not home page.
Submit additional pages as needed.
URL
This report is being submitted for the reporting period ending March 9,
7482169883
MS4 Annual Report Form
SPDES ID
7.Evaluating Progress Toward Measurable Goals MCM 4
Use this page to report on your progress and project plans toward achieving measurable goals
identified in your Stormwater Management Program Plan (SWMPP), including requirements in Part
III.C.1. Submit additional pages as needed.
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
MCM 4 Page 3 of 3
This report is being submitted for the reporting period ending March 9,
A.Briefly summarize the Measurable Goal identified in the SWMPP in this reporting period.
B.Briefly summarize the observations that indicated the overall effectiveness of this Measurable
Goal.
C.How many times was this observation measured or evaluated in this reporting period?
(ex.: samples/participants/events)
D.Has your MS4 made progress toward this measurable goal during this reporting period?
Yes No
E.Is your MS4 on schedule to meet the deadline set forth in the SWMPP?
Yes No
F.Briefly summarize the stormwater activities planned to meet the goals of this MCM during
the next reporting cycle (including an implementation schedule).
7935007876
Minimum Control Measure 5. Post-Construction Stormwater Management
MS4 Annual Report Form
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
SPDES ID
The information in this section is being reported (check one):
On behalf of an individual MS4
On behalf of a coalition
How many MS4s contributed to this report?
Alternative Practices
Filter Systems
Infiltration Basins
Open Channels
Ponds
Wetlands
Other
#
Inventoried
#
Inspections
# Times
Maintained
2.Do you use an electronic tool (e.g. GIS, database, spreadsheet) to track post-construction
BMPs, inspections and maintanance?Yes No
1.How many and what type of post-construction stormwater management practices has your
MS4/Coalition inventoried, inspected and maintained in this reporting period?
MCM 5 Page 1 of 3
3.What types of non-structural practices have been used to implement Low Impact
Development/Better Site Design/Green Infrastructure principles?
Building Codes
Overlay Districts
Zoning
None
Watershed Plans
Other:
Municipal Comprehensive Plans
Open Space Preservation Program
Local Law or Ordinance
Land Use Regulation/Zoning
Other Comprehensive Plan
This report is being submitted for the reporting period ending March 9,
1048119251
5.What percent of municipal officials/MS4 staff responsible for program implementation attended
training on Low Impace Development (LID), Better Site Design (BSD) and other Green
Infrastructure principles in this reporting period?
4a.Are the MS4s contributing to this report involved in a regional/watershed wide planning effort?
MS4 Annual Report Form
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
SPDES ID
MCM 5 Page 2 of 3
This report is being submitted for the reporting period ending March 9,
Yes No
4b.Does the MS4 have a banking and credit system for stormwater management practices?
Yes No
4c.Do the SWMP Plans for each MS4 contributing to this report include a protocol for evaluation
and approval of banking and credit of alternative siting of a stormwater management practice?
Yes No
4d.How many stormwater management practices have been implemented as part of this system in this
reporting period?
%
9091119257
MS4 Annual Report Form
SPDES ID
6.Evaluating Progress Toward Measurable Goals MCM 5
Use this page to report on your progress and project plans toward achieving measurable goals
identified in your Stormwater Management Program Plan (SWMPP), including requirements in Part
III.C.1. Submit additional pages as needed.
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
MCM 5 Page 3 of 3
This report is being submitted for the reporting period ending March 9,
A.Briefly summarize the Measurable Goal identified in the SWMPP in this reporting period.
B.Briefly summarize the observations that indicated the overall effectiveness of this Measurable
Goal.
C.How many times was this observation measured or evaluated in this reporting period?
(ex.: samples/participants/events)
D.Has your MS4 made progress toward this measurable goal during this reporting period?
Yes No
E.Is your MS4 on schedule to meet the deadline set forth in the SWMPP?
Yes No
F.Briefly summarize the stormwater activities planned to meet the goals of this MCM during
the next reporting cycle (including an implementation schedule).
1610116332
Minimum Control Measure 6. Stormwater Management for Municipal Operations
MS4 Annual Report Form
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
SPDES ID
The information in this section is being reported (check one):
On behalf of an individual MS4
On behalf of a coalition
How many MS4s contributed to this report?
Street Maintenance......................................................
Bridge Maintenance....................................................
Winter Road Maintenance..........................................
Salt Storage.................................................................
Solid Waste Management...........................................
New Municipal Construction and Land Disturbance..
Right of Way Maintenance.........................................
Marine Operations......................................................
Hydrologic Habitat Modification................................
Parks and Open Space.................................................
Municipal Building.....................................................
Stormwater System Maintenance................................
Vehicle and Fleet Maintenance...................................
Other...........................................................................
1.Choose/list each municipal operation/facility that contributes or may potentially contribute
Pollutants of Concern to the MS4 system. For each operation/facility indicate whether the
operation/facility has been addressed in the MS4's/Coalition's Stormwater Management
Program(SWMP) Plan and whether a self-assessment has been performed during the
reporting period. A self-assessment is performed to: 1) determine the sources of pollutants
potentially generated by the permittee's operations and facilities; 2) evaluate the
effectiveness of existing programs and 3) identify the municipal operations and facilities
that will be addressed by the pollution prevention and good housekeeping program, if it's
not done already.
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
Operation/Activity/Facility Addressed in SWMP?
Self-Assessment
Operation/Activity/Facility
performed within the past 3
years?
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
Yes No
MCM 6 Page 1 of 3
This report is being submitted for the reporting period ending March 9,
6894134836
Parking Lots Swept
Streets Swept
Catch Basins Inspected and Cleaned Where Necessary
Post Construction Control Stormwater Management Practices
Phosphorus Applied In Chemical Fertilizer
Nitrogen Applied In Chemical Fertilizer
Pesticide/Herbicide Applied
MS4 Annual Report Form
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
SPDES ID
2.Provide the following information about municipal operations good housekeeping programs:
Inspected and Cleaned Where Necessary
# Acres
# Miles
#
#
# Lbs.
# Lbs.
# Acres .
3.How many stormwater management trainings have been provided to municipal employees
during this reporting period?
4.What was the date of the last training?
5.How many municipal employees have been trained in this reporting period?
6.What percent of municipal employees in relevant positions and departments receive
stormwater management training?
//
%
MCM 6 Page 2 of 3
This report is being submitted for the reporting period ending March 9,
(Number of acres X Number of times swept)
(Number of miles X Number of times swept)
(Number of acres to which pesticide/herbicide was applied X Number of
times applied to the nearest tenth.)
6445134838
MS4 Annual Report Form
SPDES ID
7.Evaluating Progress Toward Measurable Goals MCM 6
Use this page to report on your progress and project plans toward achieving measurable goals
identified in your Stormwater Management Program Plan (SWMPP), including requirements in Part
III.C.1. Submit additional pages as needed.
If submitting this form as part of a joint report on behalf of a coalition leave SPDES ID blank.
Name ofMS4/Coalition
MCM 6 Page 3 of 3
This report is being submitted for the reporting period ending March 9,
A.Briefly summarize the Measurable Goal identified in the SWMPP in this reporting period.
B.Briefly summarize the observations that indicated the overall effectiveness of this Measurable
Goal.
C.How many times was this observation measured or evaluated in this reporting period?
(ex.: samples/participants/events)
D.Has your MS4 made progress toward this measurable goal during this reporting period?
Yes No
E.Is your MS4 on schedule to meet the deadline set forth in the SWMPP?
Yes No
F.Briefly summarize the stormwater activities planned to meet the goals of this MCM during
the next reporting cycle (including an implementation schedule).
7123078468