Loading...
HomeMy WebLinkAboutASPW Rpt Board Meeting 2-21-17.pdfVillage of Cayuga Heights Assistant Superintendent of Public Works Report 2/21/2017 Street: v New Signs have been created and will be placed on sidewalks. The signs are intended to inform residents that any brush overhanging the sidewalks will be trimmed. The trimming will happen in between the signs. Snow: v Total overtime worked plowing snow for the Month of January – 99.5 Hours General: v Continue compiling an equipment list so we can evaluate our current vehicle inventory and status v Disconnect switch for street lights – Brent, Tim and I met with Ted Hanson of NYSEG to discuss the possibility of installing a disconnect switch. Ted was going to review the different feeds for the street lights and get us in contact with someone who could cut the power to the street lights for us. This would give the village a window to hire a contractor to install a disconnect switch. o In contact with NYSEG to discuss options of NYSEG taking ownership of the street lights. v Rehab of Village Parking lot – Tim and I had conversations with a Suit-Kote representative and he feels the parking lot needs more than sealant. The parking lot shows significant wear and should have a top coat of asphalt installed or completely replaced. o Brent discussed this with the property owner’s assistant. We are waiting for further communication from the property owner.