HomeMy WebLinkAboutPWC Meeting 1-11-17.pdfVillage of Cayuga Heights
Assistant Superintendent of Public Works Report
1/11/2017
Street:
Crew continues to address pot holes that occur throughout the village.
Refuse:
Crew continues to pick up Christmas trees throughout village.
Sunset Park – Started to push bark chips over the bank to help with the smothering process.
This will help slow the plant growth.
Snow:
New salt is getting good reviews from crew. They can see it on the roads and they also notice
that it starts melting the snow on the roads faster.
General:
Continue compiling an equipment list so we can evaluate our current vehicle inventory and
status
Disconnect switch for street lights – Brent, Tim and I met with Ted Hanson of NYSEG to discuss
the possibility of installing a disconnect switch. Ted was going to review the different feeds for
the street lights and get us in contact with someone who could cut the power to the street lights
for us. This would give the village a window to hire a contractor to install a disconnect switch.
o Conference call scheduled for Wednesday 1/18/2017
Rehab of Village Parking lot – Tim and I had conversations with a Suit-Kote representative and
he feels the parking lot needs more than sealant. The parking lot shows significant wear and
should have a top coat of asphalt installed or completely replaced.
Sale of 2004 Sterling Dump truck.
o Truck auction ended on 1/10 and the truck sold for $5,850