HomeMy WebLinkAbout2005 Road Projects.PDF2OO5 ROAD PROJECTS
TYPE DESCRIPTION
w*Yd$'
QUOTE
A BASE STABILIZATION + 2,'OLB RECYCLE BASE + 2'' OL
C SHIM LOW SPOTS + 2'' OL
D MILL + 2'' OL
E MILL + 2.5" BINDER + 2'TOP
F 1i2'MIRCO PAVING
G 2" OL (by contractor)
RANh STREET NAME LENGTH TEPAIF
87,000.00
103,000.00
72,500.00
66,000.00
120,000.00
13,000.00
50,000.00
PRICE
per mile
per mile
per mile
per mile
per mile
per mile
per mile
COST RUNNING
$
$
$
$
$
$
$
tJ"*t"i/u-,vt,vt
t4*
1
2
3
4
5
6
7I
I
10
11
IROOUOIS PI.ACE
COMSTOCK ROAD
HILLSIDE DRIVE
IROQUOIS ROAD
REMTNGTON ROAD (LOWER)
REMTNGTON ROAD (UPPER)
HANSHAW ROAD (UPPER)
HANSHAW ROAD (LOWER)
HTGHGATE ROAD (UPPER)
HIGHLAND PARK LANE
HTGHLAND ROAD (UPPER)
0.11
0.48
o.12
0.33
0.75
0.25
0.6
0.37
0.52
0.12
0.95
0$
A$G$
F$
0$
G$G$A$G$
G$
G$
-$
87,000.00 $
50,000.00 $-$
-$
50,000.00 $
50,000.00 $
87,000.00 $
50,000.00 $
50,000.00' $
50,000.00 $
$-$
41,760.00 $
6,000.00 $-$
-$
12,500.00 $
30,000.00 $
32,190.00 $
26,000.00 $
"6,000.00 $
47,500.00 $
or,ruo.oo
47,760.04
47,760.00
47,760.00
60,260.00
90,260.00
122,450.40
148,450.00
154,450.00
201,950.00
\
My suggestion is to plan to use $15,000 of the A51 10.41A budget to micro'pave 1 mile of streets to be\
determined by Ed Quick as part of his annual maintenance planning. )
i'l /*L
n 0t,
)"X A
.(tff
J''
Kwwa . 0,.,o*-t'PK" 0 -K9 i' t
ln addition to_tbe{39o,Ooo ip the A5112.41A Capital lmprovement Budget, the A5110.410 Street Maintenance
Budget hqg_0_,qq$Fspefid on work such as crack sealing, drainage improvements, paving repairs,
includi ng an nlEtp6-thole patchi ng, sweeping, stri pi ng, signage.