HomeMy WebLinkAboutReport of Public Works May 2005.PDFREPORT OF PUBLIC WORKS
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: May 2005
REPORT BY DEPARTMENT:
1. PIIBLIC WORKS
a. Street System: We've almost finished the Klinewoods Road Project
except for the replacement of the mailboxes and a little more topsoil &
seed.
b. Storm Water System: We have cleaned several ditches around the
Village, and cleaned the catch basins several times.
c. Water System: The Parkway Place water line project fras been completed
except for the paving of the cuts in the road on Highland and The
Parkway.
d. Sewer System: We had 27 IIFPO's to mark out. I'm preparing to do 750'
of new sewer line on Comstock Road.
e. Solid Waste: No Report
f. Equipment: DPW Fuel Consumption for the month: Gas : 132.30
. Diesel: 588.10
,i
g. Buildings and Grounds: The Town of Danby is taking all the soil waste
and the concrete blocks we have in our back vard.
h. Personnel: No Report
i. Safety: All employees have ordered the new green safety t-shirts from
Homer Men & Boys.