HomeMy WebLinkAboutReport of the Public Works April 2005.PDFREPORT OF PIIBLIC WORKS
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: April2005
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
a. Street System: We are still patching holes around the Village. We
finished Phase I of the new sign replacement system, Phase II will start
later in the Fall. We have been working on the Klinewoods Project
putting in top soil and seed. We have a little more black top work to do.
We also have been working on the snow plow damage done over the
winter.
b. Storm Water System: We are cleaning catch basins and creeks around the
Village. We put a new drainage pipe across the road at 143 North Sunset
that was damaged in the April2no storm. We also ditched and cleaned the
pipe on koqoius and Triphammer intersection.
c. Water System: We have been hooking up the services to the houses in
Parkway Place. We have one more to do to finish the project.
d. Sewer System: We had 35 UFPO's to mark out. We had one sewer plug
up and have been flushing certain sections of the sewer line.
e. Solid Waste: No Report ,!
f. Equipment: DPW Fuel Consumption for the month: Gas : 217.00
Diesel: 732.20
g. Buildings and Grounds: We have alarge amount of dirt debris at the shop
which we are having trouble getting rid of. We need to find a place to
dump it.
h. PerSonnel: No Report
i. Safety: No Report