Loading...
HomeMy WebLinkAboutReport of Public Works March 2005.PDFREPORT OF PIIBLIC WORKS TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: March 2005 REPORT BY DEPARTMENT: 1. PI'BLIC WORKS a. Street System: This winter we went through 22 tons of cold patchtrying to keep up with the holes. It's an everyday job. b. Storm Water System: we've had acrew keeping the catch basins clear of ieaves and debris" c. water System: we had a water main break at the intersection of Klinewoods and comstock, fortunately it wasn't in thd'new road. The Parkway Place water lines are in. The job is just about completed. d. sewer system: we also put in 3 new sewer manholes in parkwav place. e. Solid Waste: The brush is going very well. f. Equipment: DPW Fuel Consumption for the month: Gas : 227.00 Diesei: 1382.00 g. Buildings and Grounds: we continue to clean up our yard, which is a mess from leaves, brush and dirt. "! h. Personnel: No Report i. Safety: No Report.