Proposed Changes in Project
The Space Committee is proposing the following change in the
Village Hall Project for your consideration.
The Committee proposes removing the 3-Car Gange section of the
new addition as shown on the attached floor plan. The Garage
would then be erected at the Department of Public STorks site on
Sheldon Road. This change would reduce the total project plan
amount significandy, as well as open up the space behind the Village
Hail. The footprint of the existing Village Hall with the new
proposed addition would fit comfortably on the existing piece of land
^t 836 Hanshaw Road.
In addition to the frst floor plan,I am also attachitg for the Board's
consideration a new cost estimate which encompasses these changes.
Norma Manning
Chatman, Space Committee
cf
€
crry
0)
Ft
0qo
ct
ts.
€P.
rT
-
CT
IDd
0q
I
PROPOSED VILLAGE HALL PROJECT
COST ESTIMATE AS PER SCHICKEL ARCHITECT PLANS
DELETE ATTACHED GARAGE
ADD GARAGE AT DPW
ADD LIFT
ADD GENERATOR
979 SF $ 110.00
1000 sF $ 30.Q0
allowance each
allowance each
$ 642,194.00
$ (107,Q90.00)
$ 30,0oo.oo
$ 50,000.00
$ 62e,504.00
OTHER OPTIONS NOT RECOMMENDED BY SPACE COMMITTEE:
STONE WALLS $152,970
SLATE ROOFTNG $42190
A/C EXISTING BUILDING $88,275
ELEVATOR $75,OOO
$ 1s2,970.00
$ 42,490.00
$ 88,275.00
$ 75,000.00