Loading...
HomeMy WebLinkAboutSuperintendent's Report - Technical Assistance.PDF€tlluse fi 6.aguga Heish!* MARCHAM HALL 836 HANSHAW ROAD ITHACA. N.Y. 14850 SUPERINTENDENT'S. REPORT March 12,2005 BOARD OF TRUSTEES Brent A. Cross, Superintendent of Public Works Technical Assistance Over the last 10 years, the time commitments and obligations of my positions has greatly increased. For example: -the Village Engineer is a planning board member of the Tompkins County Transportation Council, which meets several times each year. -the Code Enforcement Officer must obtain 24 hours of in-service training, which results in about 40 hours/year away from the office. the EPA $tormwater requirements have resulted in more administrative effort and time away from the office to keep up on training and regulatory changes. -the new Intemational Building Code has added time to review of plans and inspections. -l have tried to get the Village in compliance with fire inspection requirements for fratemity/sorority, multiple family, and commercial buildings. -Kendal requires some amount of attention each year. -the Teamster contrast requires additional time. -participation in the Intermunicipal Sewer Contrac{. -many other misc. regulatory commitments. I am out of my office aboutTz of the time and I am meeting with "customersn, or trying to retum their phone calls, for about Yz of the remaining time that I am in the office. I have tried to provide an hourly estimate of the time required to fulfill the many obligations that my position requires. Clearly this is an estimate, and not intended to be an exact accounting of tirne. As a result, I have had (you probably have also) had complaints that it is difficult for the public to reach me. Although, I keep track of every single missed cafl, it is my goal to retum every single one of them. The problem is that many times it is not in a timely manner that is acceptable to the public. Therefore, I am requesting that the Village provide some assis-tance to deal with the issue of my time commitments. I have a few ideas that I would like you to consider: 1. Hire a full time technician who would assist me in making some of the field inspections and provide technical assistance with basic engineering tasks such as mapping and infrastructure documentation. This person could also answer the phone when I am out of the office, and handle minor issues in a more timely manner. 2. Hire a full time administrative assistant, who could be shared with other departments. 3. Instead of replacing the vacanl MEO position in the DPW create a new position whlch could assist both the Working $upervisor and the Village Engineer. Another option would be hire an Assistant $uperintendent of Public Works to oversee the DPW crew. 4. Put money in the budget to allow the Village Engineer to contract out some of the technical work to local engineering firms. Telephone 607.257-1238 Otfice Hours 94.M.-4P.M. DATE: TO: FROM: RE: REPORT: HOURS ESTIMATE FOR ROUTINE TASKS TITLE DESCRIPTION TOTAL SPW budget process SPW prepare monthly reports/resolutions for meetings SPW attend PWC meeting SPW prepare CHIPS documents SPW review and approvevouchers SPW general administrative functions (ie: phone, mail, emails, computer, etc) SPW meeting with Working Supervisor SPW review fuel reports and oversee fuel system compliance SPW attend MPO meetings SPW attend Solid Waste meetings SPW inspect infrastructure and write Work Orders SPW receive public requesUcomplaints from Public and prepare Work Orders SPW insurance issues and compliance SPW employee issues (ie: discipline, benefits, requests, complaints) SPW emergency issues (ie: snow, water, sewer, wind, etc) SPW review equipment reports SPW research and prepare equipment bids SPW review safety requirements and OSHA/PESH compliance SPW administer Drug and AlcoholTesting program SPW adminster ROWstreet opening permits Subtotal for Superintendent of Public Works VE review monthly sewer reports VE inspect WWTP operation VE meetings w/ operator, NYSDEC, outside municipalities VE write sewer permits VE review UFPO reports and Dig Safely compliance VE maintain Village Hallsystems VE coordinate Fire Department systems VE oversee water system maintenance and BPWS compliance VE oversee sewer system maintenance VE oversee storm sewer system maintenance VE prepare road reconstruction documents (ie drawings, surveys, bids, etc) VE inspect road work VE special projects (ie fire station, salt building, V1/WIP roof, etc) Subtotal for Village Engineer administer 50 building permits (ie: plan review, application, inspections) attend continuing education to maintain certification attend Southern Tier Building Officials Association meetings prepare documents for NYS and County records Subtotal for Building Commissioner administer 25 zoning permits (ie: additions, signs, garages, etc) adminster 6 variances (inc. correspondences w/ app., ZBA, public) adminster 2 Planning Board reviews (ie: commercial, multiple family) enforcement actions patrol for violations Subtotal for Zoning Officer auditorium, etc) Subtotal for Fire Marshall does not include Trustee meetings or ZBA meetings (total) 1 0.5 4A 96 24 8 24 260 130 24 24I 52 208 24 208 36 12. 24 24 24 24 8 2 8 2 I 4 z 3 1 z z z z 1274 24 4d 24 24 52 52 12 52 52 52 104 vo 192 720 172 624 48 24 24 104 24 24 NA 224112 4 z z 12BC BC BC BC ZO zo ZQ zo ZO FM FM FM FM FM z 4 z z 1 1 I 2 e 't6 784 i nspecVrei nspect 6 faternity/sorority houses inspect 2 public assembly spaces (ie church, inspect 112 of all commercial buildings inspect 112 oI all apartments buildings inspect general spaces at Kendal 48 88 4A 40 40 40 12 working hours per year @ 90olo efficiency holidays 9 daysiyear fl oatingipersonal 5 days/year vacation 15 days/year 148 3098 1872 -72 40 - tzv:- 1640