Loading...
HomeMy WebLinkAboutDraft Resolution - WWTP.PDFRESOLUTION )ooo(: TO AUTHORIZE TIIE MAYOR TO SIGN TIIE CONTRACT WITH STEARNS & VVHELER FOR DESIGN SERVICES ON TIIE W\ryTP PHOSPHOROUS PROJECT Whereas, the Village of Cayuga Heights is planning to construct a new phosphorous treatment addition to it's WWTP at95l E. ShoreDrive, and Whereas, Stearns & Wheler Engineers (SWE) has provided engineering support services to the WWTP in the past and has preformed preliminary design services for the Phosphorous Project, and Whereas, SWE has prepared a scope of services for the final design,phase{ ofthe Phosphorous Project, with estimated times for various tasks which have been used to provide an estimated cost of services of ffig* and now S z ro,crar Therefore, the Village of Cayuga Heights Board of Trustees hereby accepts the proposal and authorizes the Mayor to sign the Professional Services Agreement for such work, wfa_ n^4a,*_* b , Jl ,n-, x1f<_'/* lfa ,mn /rtAi'"f _J-4 Lrt, atw" PROGRAM OF' ENGINNERING SERVICES TERTIARY PHOSPHORUS REMOVAL I]PGRADE PROJECT Cayuga Heights Water Pollution Control Plant Village of Cayuga Heights, New York Notes: (l) Interpretation and clariflcation ofcontract requirements, review and approval of payment applications, preparation of work changes, review of contractor claims, etc. Task LADOT Eours LADOT Cost Expenses rolal Cost X'INAL DESIGN PHASE SERVICES Site Survey 6 $600 $2.200 $ 2-800 Subsurf,ace lnvestigation (Soil Borines)2I $ 2.400 $2.300 $ 4.700 Civil Desim 450 $ 38,200 $2.400 $ 40.600 Mechanical Design 416 $ 3s,600 $ 3.000 $ 38.600 Architectural Desim 161 $ 14.400 $ 1"s00 $ 1s.900 Structural Desisx 224 $ 20.800 $ 1,800 $ 22.600 Heating and Ventilatins Desien 97 $ 7.800 $800 $8.600 Electrical Desiear 374 $ 34"700 $2,400 $ 37.100 PlumbingDesign 87 $ 6,700 $900 $ 7,600 Regulatory Review L4 $ 1.400 $100 $ 1.500 Subtotal (Desisn Phasel 1,846 $ 162,600 s 17.400 $ 180,000 BIDDING PHASE SERVICES Bidding 148 $ 13,300 $ 7,200 $20,500 CONSTRUCTION PHASE SDRVICDS Construction Phase Engineā‚¬riog (t)240 $ 28-600 $1.500 $ 30.100 Shop Drawines 286 $ 27,100 $700 $ 27,800 Resident Representative 1.560 $ 124,000 $ 124,000 Concrete Testine 10 $ 1,000 $ 3,300 $ 4.300 Record Drawings 115 $ 7.900 $ 1.700 $ 9,600 Operation and Maintenance Manual 108 $8,400 $900 $ 9.300 Startup Services 18 $ t.sso $r50 $ 2.100 Guarantee Period Services 18 $ 1.950 $150 $ 2,100 Contract Closeout 6 $700 $700 Subtotal (Construction Phase)2,361 $ 201"600 $ 8,400 $ 210,000 TOT 4,355 s 377.500 $ 33,000 $ 410.500