HomeMy WebLinkAboutReport of Public Works April 2006.PDFREPORT OF PI'BLIC WORKS
TO: BOARD OF TRUSTEES
FROM: Ed Quick, Working Supervisor
PERIOD: April2006
REPORT BY DEPARTMENT:
1. PI'BLIC WORKS
a. Street System: We put the shoulder material down on the roads we paved
last fall. The Tompkins County Highway Department came up with their
shoulder machine and helped us.
We are now putting seed and top soil down where it is needed.
b. Storm Water System: We put a new larger catch basil near 310
Triphammer Road. Also, we have been keeping the catch basins clear of
debris.
c. Water System: We are preparing the holes in the road caused by water
breaks from this winter for blacktop.
d. Sewer System: We had 31 IIFPO's to mark out. We also flushed several
sewer mains around the Villase.
e. Solid Waste: The brush pickup is heavier now that spring cleanup has
begun.
,!
f. Equipment: DPW Fuel Consumption for the month: Gas : 75.6
Diesel: 573.40
g. Buildings and Grounds: No Report
h. Personnel: No Report
i. Safety: We plan on having a safety meeting within the next month.