Loading...
HomeMy WebLinkAboutReport of Public Works April 2006.PDFREPORT OF PI'BLIC WORKS TO: BOARD OF TRUSTEES FROM: Ed Quick, Working Supervisor PERIOD: April2006 REPORT BY DEPARTMENT: 1. PI'BLIC WORKS a. Street System: We put the shoulder material down on the roads we paved last fall. The Tompkins County Highway Department came up with their shoulder machine and helped us. We are now putting seed and top soil down where it is needed. b. Storm Water System: We put a new larger catch basil near 310 Triphammer Road. Also, we have been keeping the catch basins clear of debris. c. Water System: We are preparing the holes in the road caused by water breaks from this winter for blacktop. d. Sewer System: We had 31 IIFPO's to mark out. We also flushed several sewer mains around the Villase. e. Solid Waste: The brush pickup is heavier now that spring cleanup has begun. ,! f. Equipment: DPW Fuel Consumption for the month: Gas : 75.6 Diesel: 573.40 g. Buildings and Grounds: No Report h. Personnel: No Report i. Safety: We plan on having a safety meeting within the next month.