Loading...
HomeMy WebLinkAboutReport of Public Works April 17, 2006.PDFREPORT OF PUBLIC WORKS AprIl17 ^2006 TO: FROM: PERIOD: BOARD OF TRUSTEES Ed Quick, Working Supervisor March 2006 REPORT BY DEPARTMENT: 1. PIIBLIC WORKS a.Street System: The potholes were not bad this winter due to the fact that it was a mile winter. We had crews out ail winter patching. I've been talking with Suit Kote to decide when to micro-pave the roacls from the 05-06 budget that was put on hold until this Spring. we are micro-paving Berkshire, a section of Iroquois, and cambridge Place. we were going to micro-pave warwick and Randolph Roads, but the suit*Kote saresman said that we need to repair it another way. we are not working on that. I am slow preparing a list of roads that are going to be done in the 06-07 budget which I will show you on an attached sheet. Storm water System: we have been cleaning the catch basirrs all winter. The drainage systems seem to be working well all around the village, with a small amount of problems. water System: we installed2water services on Hanshaw Road from the new water main. we had a water main break at902 Triphammer Road on 3/25/06 when the water department turned the 2 valves down to shut the water flow down. They broke them. we repaired them on3128106 and. 3130/06. Sewer System: we are getting our sewer flusher ready for the annual spring maintenance program of flushing lines. we flush lines all over the village every year, which has cut down on the amount of sewer plug-ups. We flush approximately 2 miles every year. Solid waste: This time of year everyone is cleaning up their yards from debris so the brush and cans of leaves are alotheavier. It takes us a little longer to pick it up than usual. b. d. i. Equipment: DPW Fuel Consumption for the month: Gas: 83.90 Diesel : 994.00 f. Buildings and Grounds: No Report g. Personnel: No report h. Safety: We will be having a safety meeting this Spring.