Loading...
HomeMy WebLinkAboutIntermunicipal Wastewater Committee 3.18.2006 Minutes.PDFIntermunicipal Wastewater Committee The IWWC met at Village of Cayuga Heights Hall on May 18 2006.In attendance were W. Lynn, D. Hartill, S. Brock, S. Trumbull, S. Farkas, N. Desch, C. Valentino. The Committee reviewed the outstandins tasks list dated March I and the notes from the April 10,2006 meeting Item 1 Agreement between Town of Ithaca and Village of Cayuga Heights on reimbursement of O&M costs by VCH for diverted flows to IAWTP. A scheduled meeting was held on April20. Attendees were B. Cross, W. Lynn,, D. Walker, S. Brock, D. Tyler and C. Valentino. A multi-page outline of the components of the agreement have been prepared by S. Brock and forwarded to D. Tyler who will prepare the draft agreement for review. The goal is to have the final agreement completed by mid August Item 2 Agreement among affected municipalities on who will perform and pay for flow diversion work. The Kline Road diversion is completed and paid for by the Village of Lansing. The Village of Lansing will be reimbursed by the Town of Lansing for the bond act portion since the Town is the expected recipient of the Bond act award for the project once the Town District is formed. See below for Remington Road pr<lject. Item 3 Agreements between VC and the Lansings, Town of lthaca and T'own of Dryden to fteat wastewater at VCHWTP. The agreements depend on the completion of the agreement described in Item 1. B. Cross has provided Town of Lansing the cost parameters for Lansing's district engineering report. Item 5 VCH and IAWTP owners enter into plant to plant agreement. The Town of Ithaca and the Village of Cayuga Heights have approved the agreement. The Town of Dryden is expected to approve it on June 8, Cathy will contact City of Ithaca to see if they have approved it or find out when it is scheduled for action. S. Brock nereds signed copies of both the Town of Ithaca and City of Ithaca agreements. Item 6 Construct Kline Road Diversion. Completed. ItemT After the Kline Road diversion is complete, the Village of Cayuga lFleights has lifted its limitation of sewer units for municipalities using the VCHWTP. Moratorium has been lifted. VCH needs to pass resolution rescinding moratorium. Item 8 Revise sewer use laws for VCH and Lansings to make comparable to those adopted by IAWTP owners. S. Brock has sent another copy of the draft lavrs. B. Cross will veri$ with Stearns and Wheler tJnat the treatment limits in the laws are c;onsistent with permit requirements. Item 9 Enter into agreements for enforcement of pretreatment requirennents. It appears that Cayuga Heights, Town of Ithaca and the Village of Lansing have adopted these agreements. Signed copies need to be sent to S. Brock. Dryden is expected to approve it on June 8. Item 10 Town of Dryden/Town of Ithaca Agreement on the use of Town of Ithaca Sewers. Cathy will initiate call for meeting to complete this work. Item 11 Begin planning Remington Road Diversion. A meeting is now set up for Tuesday May 30 at 9AM at VCH Hall to establish scope and timetable for this project. Preliminary plans and profiles have been prepared. kmay be possible to move forward with a phase I for the project consisting of the work by VCH on Remington Road to connect with the existing 8" line on East Shore Drive. Invitees to the meeting are D. Hartill, S. Farkas, W. Lynn, N. Desch plus the engineers. Cathy will notiff the attendees.