Loading...
HomeMy WebLinkAboutDPW Monthly Report - Sept 2009.PDFDEPARTMENT OF PIIBLIC WORKS 123 Sheldon Rd. Ithaca, NY 14850 (607) 2s7-6166 Thursday, October 01, 2009 To:The Honorable Mayor Giilmore Members of the Board of Trustees Viilage of Cayuga Heights Re: Monthly Report- SePtember 2009 During the month of September we have been working continued trimming brush and keeping our street signs cleared. We have also completed various patching jobs in order for u_s tt be ready for the stripping crew to stripe the village prior to school starting. Many other projects were completed throughout September as well and other projects such as the TCAT bus stop were planned and look forward to starting sometime in October" We have also completed many small projects that will enhance the storm sewer system such as 104 Lisa place, the catch basin on park-way and e. upland rd was repaired, many other paving jobs were completed... Jeff Ellis has been working hard as well preparing and readying the equipment needed for leaf season as well as preparing the snow equipment and feels that the sidewalk plow we recently purchased will help a lot on the sidewaik conditions this winter.. . Sincerely; Jeffrey Frisbie Assl6ppervisor DPW TO: FROM: REPORT OF PUBLIC WORKS Thursdav' October 01, 2009 BOARD OF TRUSTEES Jeffrey Frisbie; Asst. Superintendent Of Public Works PERIOD: Septernber2009 REPORT BY DEPARTMENT: 1. PUBLIC WORKS a. Street System: We have been able to complete the stripping prior to school starting... the new crosswalk at Chemung canal is completed, the bus stop at the fire dept has been repaired, and various other patching jobs have been repaired in SePtember. b. Storm Water System: Our system has been working well with periodic cleaning and ditching. We also have utilized blacktop swales to keep water flowing into the catch basins to help in the erosion of effected areas'.. we have alio seeded many of the ditch lines and are very happy with the appearance after the grass has taken.. c. Water System: Our water system has been working well. The new water line coniractor is installing the main on schedule and seems to be doing a great job... d. Sewer System: We have plans on continuing flushing. e. Buildings and Grounds: We have been continuously cleaning the yard as time allows. And have approximately 300 ton of salt on hand for winter... Personnel: nothing to rePort... Safety: nothing to report...o