Loading...
HomeMy WebLinkAboutPW111315.pdf Kathryn D. Supron, Mayor Joan M. Mangione, Clerk & Treasurer Angela M. Podufalski, Deputy Clerk Brent A. Cross, Engineer Village of Cayuga Heights MARCHAM HALL 836 HANSHAW ROAD ITHACA, NEW YORK 14850 (607) 257-1238 fax (607) 257-4910 ENGINEER’S REPORT DATE: November 12, 2015 TO: PUBLIC WORKS COMMITTEE OF BOARD OF TRUSTEES FROM: Brent Cross, Superintendent of Public Works Leaf season is in full swing. After initially being told that we would not be allowed to off load leaves at the Cornell Plantations facility, they gave us the “go ahead” at the last minute. The crew took leaves there for most of last month, but has since been asked by the Plantations to stop taking the leaves there for the time being. I suspect that they have not had a chance to manage the leaf piles yet and do not want to get overwhelmed. In the meantime, the DPW crew is taking the leaves to the Village “compost” site adjacent to the WWTP. Since we have found recent unapproved dumping (mostly tree stumps and branches), we have installed a new gate (cable) across the driveway to prevent further misuse of the facility. The goal remains to accomplish “one round” through the Village each week. It is typical in the middle of the season (peak raking) to fall behind. We are going to try to work an extra hour for a few days to see if we can catch back up. The DPW has successfully completed the installation of the new culvert pipes under Randolph Road and Warwick Place. There is still some detail work to be done, and we are still waiting for a final decision from one of the adjacent neighbors whether they will be participating with the replacement of their pipe. Asphalt patching on N. Triphammer has been completed. Other small work orders have also been completed. Pothole patching on W. Remington Road may need to be done as a paver project which could still be done this year before the asphalt plants close. As of today, Evans Roofing has confirmed that they still have the Village Hall project on their schedule for this year. They are shooting for the next 2 weeks. I just received today the engineering submittal package from Macom, so no work has been done by GHD Services yet. They have contacted Yaws Environmental for laboratory data on the sludge for analysis to show to Ithaca Area WWTP. IAWWTP also has an application for that GHD will review for us. On the asset valuation project, I owe them some informati on about the insured property so they can cover the correct physical structures. I am still quite busy with zoning related permits, variances, site plan reviews, etc. I was able to make time to process the CHIPS reimbursement application form for State Fi scal Year 14-15 and 15-16. Between 2 years worth of reimbursement for capital projects and emergency winter recovery, we will be receiving a check from NYSDOT for approximately $250,000.00.