REPORT OF PI]BLIC WORKS
Monday, August 03,2009
BOARD OF TRUSTEES
Jeffiey Frisbie; Asst. Superintendent Of Public Works
PERIOD: July2009
REPORT BY DEPARTIv{ENT:
1. PUBLIC WORKS
Sfteet System: Suit Kote has completed the crack sealing throughout the
newly paved roads and a few of the older roads in need. We also have
beor patching potholes and have started the reconstruction of Midway Rd.
Storm Water System: Our system has been working well with periodic
slsaning and ditching. We also have utilized blacktop swales to keep water
flowing into the catch basins to help in the erosion of eflected areas...
Water System: Our water system has been working well. The new water
line contractor is installing the main on schedule and seems to be doing a
great job...
d. Sewer System: We have plans on continuing flushing.
e. Buildings and Grounds: We have been continuously cleaning the yard as
time allows.
Personnel: Nefhing to report
Safet-y: nothing to report...
DEPARTMENT OF PUBLIC WORKS
123 Sheldon Rd.
Ithaca,NY 14850
(607) 2s7-6r66
Monday, August 03,2009
To: The Honorable Mayor Gilhnore
Members ofthe Board of Trustees
Village of Cayuga Heights
Re: Monthly Report- July 2009
During the month of July we have been working continued trimming brush and
keeping our street signs cleared. We have also begun to reconstruct midway road and
have resurfaced it with base until we monitor it for a finished top material for completion.
The crack sealing was completed in one day by Suit-Kote.
We have also completed many small projects that will enhance the storm sewer
system such as ditching and adding some pipes where needed. We have also started
r"fo.rniog other ditches that needed blacktop swales which have helped the storrn waters
to travel where it was intended to run...
Sincerely;
Jeffrey Frisbie
Asst Supervisor DPW