HomeMy WebLinkAboutDepartment of Public Works Monthly Report June 2009.PDFDEPARTMENT OF PI'BLIC WORKS
123 Sheldon Rd.
Ithaca,NY 14850
(607) 2s7-6766
Tuesday, July 07,2009
To: The Honorable Mayor Gillnaore
Members of the Board of Trustees
Village of Cayuga Heights
Re: Monthly Report- June 2009
During the month of June we have been working everyday trimming brush and
keeping our street signs cleared and since our road side tracJor was disabled the guys
were clearing road side brush by hand which took a lot of hours and continuous time...
with the non-stop raining that we have had we have been mowing about every 4 days and
been clearing storm sewer grates continuously..
We have also been seeding all the spots in the village that needed cover which was
either snow plow darnaged or work in the ditching that we have done... We have started
our yearly ditching projects in the winthrop area and on tripphammer rd,s.
We have also started reforming other ditches tlat needed blacktop swales which
have helped the storrn waters to travel where it was intended to run...
Sincerely;
Jeffiey Frisbie
Asst Supervisor DPW
REPORT OF PUBLIC WORKS
Tuesday, July 07,2009
TO: BOARD OF TRUSTEES
FROM: Jef&ey Frisbie; Asst. Superintendent Of Public Works
PERIOD: June 2009
REPORT BY DEPARTMENT:
1. PUBLIC WORKS
a. Street System: We have been hot patching pot holes throughout the
village and have been addressing many of tlre storm water swales and
ditches to prevent erosion ofourpaved roads. I have seheduled a list of
roads to be crack sealed which needs to be addressed so that we maintain
the newer roads so that they stay in great shape... this should be done in
the beginning part ofjulY.
b. Storm Water System: Our system has been working well with periodic
cleaning and ditching. 'We also have utilized blacklop swales to keep water
flowing into the catch basins to help in the erosion of effected areas...
c. Water System: Our water system has been working well. And have started
the dsny mark out of the new water trine addition for Chicago cnst.
d. Sewer System: We have plans on continuing flushing.
e. Buildings and Grotrnds: We have been continuously cleaning the yard as
time allows.
f. Personnel: Nothing to report
g. Safety: nothing to report...