Loading...
HomeMy WebLinkAboutDepartment of Public Works Monthly Report June 2009.PDFDEPARTMENT OF PI'BLIC WORKS 123 Sheldon Rd. Ithaca,NY 14850 (607) 2s7-6766 Tuesday, July 07,2009 To: The Honorable Mayor Gillnaore Members of the Board of Trustees Village of Cayuga Heights Re: Monthly Report- June 2009 During the month of June we have been working everyday trimming brush and keeping our street signs cleared and since our road side tracJor was disabled the guys were clearing road side brush by hand which took a lot of hours and continuous time... with the non-stop raining that we have had we have been mowing about every 4 days and been clearing storm sewer grates continuously.. We have also been seeding all the spots in the village that needed cover which was either snow plow darnaged or work in the ditching that we have done... We have started our yearly ditching projects in the winthrop area and on tripphammer rd,s. We have also started reforming other ditches tlat needed blacktop swales which have helped the storrn waters to travel where it was intended to run... Sincerely; Jeffiey Frisbie Asst Supervisor DPW REPORT OF PUBLIC WORKS Tuesday, July 07,2009 TO: BOARD OF TRUSTEES FROM: Jef&ey Frisbie; Asst. Superintendent Of Public Works PERIOD: June 2009 REPORT BY DEPARTMENT: 1. PUBLIC WORKS a. Street System: We have been hot patching pot holes throughout the village and have been addressing many of tlre storm water swales and ditches to prevent erosion ofourpaved roads. I have seheduled a list of roads to be crack sealed which needs to be addressed so that we maintain the newer roads so that they stay in great shape... this should be done in the beginning part ofjulY. b. Storm Water System: Our system has been working well with periodic cleaning and ditching. 'We also have utilized blacklop swales to keep water flowing into the catch basins to help in the erosion of effected areas... c. Water System: Our water system has been working well. And have started the dsny mark out of the new water trine addition for Chicago cnst. d. Sewer System: We have plans on continuing flushing. e. Buildings and Grotrnds: We have been continuously cleaning the yard as time allows. f. Personnel: Nothing to report g. Safety: nothing to report...