MINUTES of a special meeting of the Board of Trustees of the Village
of Cayuga Heights held on April 28, 1938 at 7:40 P.M, at the School-
house, and Public Hearing on the budget held at 7:30 P.M, on the
same day.
PRESENT: H. E. Baxter, Mayor
R. P: Sibley, .Trustee
C. J. Kenerson, Trustee`
C. H. Guise, Treasurer
Carl Crandall, Engineer
1. Mr. Fred A. Rogalsky appeared before"the Trustees representing
a group of Ithaca business men-, with plans-for a-.proposed..22- tenant
apartment house; construction -of which was- under consideration on .
o
Triphmmmer Road, west of the lots..of, Paul Brainard and Archie Palmer.
The plans called for an investment of, #92,000 exclusive of land, on
which they.expected to receive a #80,000.loan through.the.',Ithaca
Savings Bank which would be guaranteed by the Government .'. The plans
called for a building of .fire- proof.construction.to be"completed by
Sept. 15, 1938. .
2. The minutes of the meeting held on April 4th were.read and
approved.
3. The following bills paid on authority of the Mayor were
approved:
HIGHWAYS
Moran & Gleason - crushed stone 27.38
Frank Haskins - 73z hr. @ 1.10; 2� hr. ® .50 82.10
James Collins - 76 hr. @ .45 34,20
4. The following additional bills were approved for payment:
GENERAL
The Ithaca Journal - notice re. budget hearing .96"1
McKinney Agency, Inc. - fire insurance premium
on tool shed 2/10/38 - 4/10/38. 2.92"
5. Mayor Baxter read a letter from Prof,.:Dwight'Sanderson,'
requesting that the Village take over the maintenance of that .portion
of Overlook,Road lying between Kline Road and Hillside Drive.. ,This
has never been taken over by the Village due to,the fact that:it is
e
less than 33 feet wide which is the State's requirement for accept-
q
ance of roads to be designated by Villages as village highways. The
2
legal and engineering difficulties involved in widening the road were
discussed and it was decided not, to designate that portion'of Overldok
Road as a village highway, but'
,IT, WAS VOTED, RESOLVED that .Engineer Crandall be requested .
to maintain ;Overlook Road between*Kline Road and Hillside Drive if
such could be done for a small annual outlay.
6. Mayor Baxter read.to the Board of Trustees the correspondence
and Village action with regard to the sewer in front of the house of
Prof. Kennard. It appeared that Prof. Kennard had a.reasonable
grievance for the manner in which the matter had been adjusted in 1931
and
IT WAS VOTED that Engineer Crandall be requested to.negotiate
with Prof. Kennard regarding an adjustment and bring in a
recommendation
to the Trustees at the next meeting.
7. Treasurer Guise presented the following financial
report:
Finanoial Statement
Village of Cayuga Heights
April 26, 1938
Balanoe Maroh 1, 1938 ............ $ 3,459.65
73.55
i
$ 3,533.20
Receipts to April 26, 1938 ....:.,
Expended to April 27, 1938
la Advertising 1,92
e Advertising 1.20
j
h Other geni. goverment 2.65 ' 5e77
4a Refuse oolleotion 300000,
5a Highway- supervision 4000
b Highway- foreman 190.00
6 Highriay -labor 66.60
d Highvmy- materials .: 27.38
f Snow removal 18100
g State insurance fund 151.93
i
h Light 277,34 771.25
7a Interest on indebtedness 428.00
1,505.02 -
Balance April 26,'1938 ...........::.
$ 2;028.18,..
252
8. The Clerk reported that the bond.had
been reduced on
Collector and Treasurer Guise from #159000 to
10,000 in
accordance
14
with the action of the Board on April 4, 1938:.
9. The Clerk reported that no one appeared at
the public
hearing on the.budget held at 7 :30 P.M. on this
day.:
10. IT WAS VOTED,.RESOLVED: That the
following.
budget,
be declared adopted':
.. ,
March: 1, 1938
VILLAGE OF CAYUGA HEIGHTC, K Y.
TentativeBudret for Fiscal Year - I_arch,1. 1838:
to.I.arch.1,
1939 i
J.
Actually. .Recommended`
Budget
expended
tentative..bud-
Number and Title of Account ^ - 1037-38
1937_38 -yet
1938_ 33
1. General Administration
a: Publication of iloticea ... 50400
38.36
50.00
b: Attorney Fees ...... 100,00
135:Ob
100.00
c: Village Clerk - .Salary :......::::.:..: .300 :00'
300.00
300.00
d: ° Treasurer '6 Collector - Salary 300.00
300.00
300.00
e. Election Supplies and Expenses .:.::.:. 10.00
5.54
10.00
f; Audit Expense :..::....:..:.:.... :.:::: 50;00
50.00
25.00
g. Operation d: Enfor. of Zoning Ordinance 25.00
.13,00•
25.00
he Other Expense of General Government ,:: 250 ;00
219.40
•700.00
if Hight Watchman :::::.::: : ::.::...:...... 50.00
20.15
50.00 _
Account llo: 1 - Totals 1,135.00
1;081.95
1,560,00
2. }'later and Fire Service.
a. Hydrant Rental (paid to City) ,::::...: .731;67
402,67.
216.00
b: dater System I:aintenance & Supervision 150,00
18.55
150.00,
c. Fire Protection' = Ithaca Fire Department 600:00
765.13
650.00
Contribution to Fireman's Fund ...:: 100:00
100:00
100:00
Liability Insurance ::::::::..::.'... - --
101:25, ..
101.25,
d. Hydrant Replacoment,and Installation ... 100:00
--
- --
Account Ito'. 2 - Totals .. 1, 681.67
„ 1; 387.60:.
1,217.25
3: Iiealth .
a.IHealth Officer :..:.:: :: .'.. '80,00
76,53.-
80.00 .' .
b: Vital Statistics.-Fees .'...::.'..:.'a .'','.': _- 30:00
24:50
30.00
Account Ilo. 3 -- .Totals 110.00
101.03
110.00
253,
4. Sanitation
a. Garbage and Ash Collection.'...'. :......1,900.00 1,800.00 1,800.00
b. Sewage Disposal '(paid to City) 2,567.06 2,567.06 20911.31
c. Sewer System Maintenance L. Supervision 100.00 73.86 100.00 _
Account No. 4 - Totals
b. IiiF�hvmys
ai. Highway supervision
b. Foreman - Time and Truck
c'. Additional Labor
d. I.`,aterials and Supplies'..:.':.'..:.:.::.
e. Surface Treatment of Roads
f. Snow Removal and Sanding Roads
g. Compensation and Liability Insurance:.
h. Lighting ......'.:
i..Ront - Tool Shed
j. Street Tree Spraying
Account Ho. 5'- Totals
4,567.06 4,440.94 4,811.31
400.00
400.00
400.00
1,300.00
1,300.10
1,300.00
550.00
550.00
550000
500,00
210.86
300000
1,000.00
889.17
10500000 '
200900
174,45
200,00
220,00
230.66
300.00
1,664.00
1',664.04
1,664.00
15.00
21.25
- --
200,00.
160.00
200,00 _
6,049.00 5,600,53 6,414.00
&..__, na____-..
6, Permanent Im�rove m onts
--
I
Construction F: Repair of Sidewalks•aVd
2,000„00
2,000,00 - --
b.
Culvert Iieadvmlls .....:.... curbs
500.00
498.;95 1,000.00.'
c.
Sewer Extension - irortlavay Road .:...
100.00
100,00 ___
I d.
Village Tool Iiouse ..................
1,000.00
1,000.00
e.'Asphalt
Roa3 Work ...................
1,000.00
1,000,00 - --
f.
Construction of Sidewalk and Curb ...
".
-- 2,500.00
1
Account 11o.16 - Totals
7.` Debt Service
a. Interest on Bonds a Certificates ....
b. Liquidation of Indebtedness
1. Highland Road Bonds ............
2. Sewer Certificate .......:....I.
3. Street.Certificato ........:..::
4. Improvement Certificate ..: ... ::
Account 11o.;7 - Totals
4,600.00 4,598.95 3,500.00
1,750.00' 1,805.63 1,330.00
500.00 500.00 500,00,
6,600.00 6,600.00 1,500.00•
250,00
8,850.00 9,155.63 4,830.00
GRAAD TOTALS .'.'.'....:'...'26,992.73 26,366.63
Contingency Fund .:.:.:. .1,095.56
TOTAL BUDGET ....:... ::. 28,088.29
22,442.56
2,270.68
24,719.24
254
• IBC01� AIlALYSIS
�
-
Estimated
Estim.`.Roceipts
Actual Re-
.'Receipts
_ I.._t -e'm ; ��
1937 - 1938:
loeipts 1937 - 38,1838 -39
General Tax (137 -138 Assessnent- ,2,618;650.)
.15,711.90
15,765.90 :,16,298.28
at .006 Rate t38-139 Assessment - ','2,716,380.)
Stato Income and Nortgage Tax Rebate:.......
`_1,500000
1;981.02 :.,
1,500.00"
State Doverage.Tax Rebate ...'.'.:.:..'...:....'
- --
914.84:
'.200.00
Sewage Disposal (payable by.property owners).;
2,567.06
Uncollected Taxes,Assessments & 11isc.Charges
161.96
161,96'.
-- .
ISisc.P,eceipts, Fees, Permits;• Interest ..".:.'
200.00
488.13
350.00,'1
Cash Balance at Start of Fiscal Year on.lar.l
3,347.37
3 ;347.37.
`• 3;459.65:.."._
To Be Borrowed on Certif.of Indebtedness'..,.,.
_4,600.00
4,600.00
--
Total Income ....::..''28,080.29
1;129,826.28
".
24,719,.24 ... .
SM31ARY OF VILLAGE DEBT.- 01VAARCH 1;.1938
1.ffii;hland Road Bonds 7/1/38 to 1952 (Rate
4 per cent)
.:': .......... '0.7,500.00
.
20 Certificate of Indebtedness -1 a fer(Rate 4 per cent)............ .6,400,00
3.,Certificate of Indebtedness.- Street- (Rats.4 per cent )....G.'...`. 15,000.00,'
4._Certifioate n
of Indebtedness - 'Inproveiant:(Rate 4, per, 'cent) .:.;, .4,350.00
Total,Debt .. .'.;030,250.00.
IT WAS VOTED that the tax levy be.established at 6 mills
for the current year.
12. Engineer Crandall made a report on the bids he had
received with regard to the spraying of trees in the Village, and
after consideration
IT WAS VOTED that the bid of Mr. Wayne Thomas of the,
Arborists, Inc. of Geneva for #200 be accepted, inasmuch as this
bid was as low as any of the others and as the spraying was done by
Mr. Thomas last year in a fairly satisfactory manner.
13. Engineer Crandall reported on the proposed construction
of sidewalks under item 6f in the budget,, and
IT WAS VOTED that Engineer Crandall be.authorized to award
a contract to'Byr,on C. Perkins for the construction. of the proposed
Village sidewalks at not over 20¢ per.square foot up to the amount
provided in the budget for such construction. ,
r
0
14. Engineer Crandall brought up the matter of awarding
a contract for the surface treatment of roads, and due to the lack
of competition in this vicinity and the reasonable charges and
good work of Moran and Gleason
IT WAS VOTED that Engineer Crandall.be authorized to
award a contract for #1,500 to Moran and Gleason for the.surface
treatment of "roads in the Village..
15. Trustee Kenerson as Chairman,of the Committee,on
Bus Transportation made a further report on negotiations with
the Ithaca Railways.
16. The matter of•the purchase of a new safe £or the
Village records came up for discussion and
IT WAS VOTED that the Clerk be instructed to obtain
bids for the purchase of a suitable safe and report to the Board
at the next meeting.
l+j .
18.
The date of the next meeting was set for June 6th.
Adjourned at 10:30 P.M.