Loading...
HomeMy WebLinkAboutReport of the Engineer November 1984VILLAGE OF CAYUGA HEIGHTS Report of the Engineer November 1984 LEAF REMOVAL This year the leaf removal program is ahead of schedule for completion. Both leaf suction machines have been operating. Two part -time men were hired so the machines could be continuously operated without interfering with other scheduled work. Also, Bob Tyrrell bailed leaves with his hay bailer as an experiment. With some modifications to a hay bailer, it could be an efficient way of picking up large piles of leaves. PLEASANT GROVE ROAD BIKEWAY /WALKWAY The Town of Ithaca has proposed a 4' wide extension of the pavement on each side of Pleasant Grove Road for bicycle and pedestrian traffic from Jessup Road to Hanshaw Road. The proposal further states the Town will pay for the estimated $48,000 cost at a rate not to exceed $12,000 a year from the Town -wide unexpended balance. The Village of Cayuga Heights is asked to finance the project through bonding with reimbursement including interest from the Town. An alternative to relocate the road east of the Petrillose property and build a separate walkway on the west side of the road was mentioned. A, third alternative not mentioned is to build the walkway separate from the road on the west side of Pleasant Grove Rd. The Town asks for the Village preference. SEWER LINE EASEMENT The property owners at the end of Spruce Lane wish to deed to the Village a sewer line easement for the maintenance of the line that serves Spruce Lane. Formal acceptance by the Village Board and recording of the easement with the County Clerk should be accomplished. FIRE HOUSE ROOF REPAIR Roofer Harold Wright was hired to repair a persistent leak in the new flat roof of the Fire Station. The cost was $261.00. SEWER SERVICE TO THE TOWN OF LANSING AND VILLAGE OF LANSING The Village Attorney and Engineer met with the attorney of the Town and Village of Lansing. The Village of Cayuga Heightd requirement that a new contract with new sewer districts in both the Town and Village was made known. The attorneys are working on such proposed agreements. Report of the ZO /Building Commissioner During the past month 2 zoning permits and 2 building permits were issued for one new house and one alteration for a total construction estimated cost of $99,300. Two street opening permits were issued. NYSEG has been slow but after repeated requests has replaced sidewalk paving and final street paving in a number of areas for which it had street opening permits. ZBA will meet November 15, 1984 at 7:30 p.m. to hear a request for a variance for sideyard setback from the Kents, 619 Cayuga Heights Road and for land coverage from the Swieringas, 305 Winthrop Drive. ZBA will also meet on November 29, 1984 at 7:00 p.m. to hear a request for a variance for size of lot and sideyard setback from Harry Missirian of 4 Highland Park Lane. Frank Hanshaw has purchased the Morusty property and wished to divide the property into two in accordance with the wishes of the Village.