HomeMy WebLinkAboutReport of the Engineer Aug 1984VILLAGE OF CAYUGA HEIGHTS
Report of the Engineer
August 1984
STREETS
Iroquois Road recycling project has produced 800 tons of asphalt concrete base.
About 500 tons will be used for base pavement for Iroquois Road. The remainder
will be stockpiled for use on other Village patching, shoulder, and paving jobs.
On the upper section of the road, to replace the concrete curbing, an asphalt
curb will be installed. Lisa Place is scheduled for paving in September 1984
by D & J Paving Co. who is under contract with Ivar Jonson and the Village.
The money for the paving is held in an escrow account with the Citizens Savings
Bank.
SIDEWALKS
A request for bids for paving Village sidewalks with lh" of asphalt concrete was
advertised August 11. Bids are to be received by August 22, 1984 at 2:00 P.M.
and will be available for the Board meeting.
825 HANSHAW ROAD
The contractor is in process of repairing, repainting and cleaning the building.
A new gravity cellar drain is to be installed by Village forces. The rugs are
at the cleaners for a "factory" cleaning.
BRUSH CUT BACK
Letters have been prepared and a number have been mailed out to Villagers for
their cooperation. The second mowing of lots by the Village to be charged to
the respective property owner is scheduled for next week.
Report of the Zoning Officer
Building Commissioner
During the past month four zoning permits were issued. One was for a zoning
interpretation of the changing of a property line between two buildable lots.
The other three were for additions with a total estimated construction cost
of $71,600. Three building permits were issued for $71,600 of construction
cost. Two road opening permits were issued.
The Zoning Board of Appeals met July 12 and granted a variance to Prof. Baer
from Section 7a of the Zoning Ordinance - Size of Lot.