Loading...
HomeMy WebLinkAboutSidewalk Committee Meeting, Monday, June 4, 1964VILLAGE OF CAYUGA HEIGHTS Sidewalk Committee Meeting, Monday, June 4, 1964 4:00 to 5:00 p.m. - Village Hall Present; Mayor'F.G. Marcham, Trustee Philbrick, Attorney Sovoccol, Engineer Rogers. Summary: It was agreed that alternatives should be presented to the Board. Each member of the committee expressed his ideas and concern as to how, when, and where sidewalk maintenance and construction of new sidewalks should take place. Financing was the first subject addressed. The concensus of opinion was that the committee should recommend that all maintenance costs (i.e. clearing of ice and snow, patching tomake safe, resurfacing entire lengths for reconditioning) should be paid 100% by the Village out of the General Fund raised by real estate taxes. Financing of new sidewalks was discussed. Alternatives of 100% financed by the Village, 100% by abutting property owners, and division of cost between the two were suggested. No definite conclusion was reached, but some division of costs between the Village General Fund and abutting property owners seemed to be the alternative the committee favored. The pros and cons of the two types of sidewalk, portland cement concrete and asphalt, were presented. Cost and personal preference of individual residents on an appearance basis were two main points. The problem of one type of sidewalk adjoining a different type was noted. The total cost to the Village, the effect on the tax rate, a special bond issue, and number of years over which the cost should be spread were all discussed. the meeting was adjourned with the intent to meet again as soon as possible.