REPORT OF THE ENGINEER
May 21, 1984
1984 -85 Budget
It is the understanding of the Engineer that, after the discussion of health
insurance costs at the April 10, 1984 meeting, the Board intent.was expressed
to increase the salaries of the three lowest salaried men on the D.P.W. staff
effective with the start of the 1984 -85 budget year. The amount was not
specified. It is recommended that the salaries of Steve Roco, Mike Coyle, and
Tim Dupuy be raised by $200 each and that the money ($600) be transferred from
Summer Extra Help thereby resulting in no change in the total 1984 -85 Budget.
Sidewalks
The extremely wet spring has delayed starting on sidewalk work to be
accomplished under the 1983 -84 Budget. For asphalt paving repair on the
full length and both sides of White Park Road, two quotations were received -
$7,375 from D & J Paving Co. and $11,000 from Central Asphalt. D & J Paving
was notified to proceed. D & J was low bidder on the Hanshaw Road sidewalk
paving and did a very good job.
The concrete repair work to be done by our D.P.W. at Highland Road and
Iroquois Road is expected to start the week of May 21.
Requests have been received to extend the sidewalk on Triphammer Road from
property owner Mrs. Dugan who stressed pedestrian (child) safety. Also a
request for sidewalk on Hanshaw Road school corner to North Triphammer Road
from Prof. BAnks. Again safety was the reason.
Sewer Lines
500' of leaky.10" tile sewer main in lower Remington Road was replaced.
The replacement of 8" line on Hanshaw (600 block),is completed except for
reseeding the disturbed area. Sewer line leaks on Highland Road (600 block)
were repaired.