Loading...
HomeMy WebLinkAboutReport of the Engineer Sept 1983VILLAGE OF CAYUGA HEIGHTS REPORT OF THE ENGINEER September, 1983 STREAM MAINTENANCE $1000 was granted to the Village by the County for stream maintenance to prevent flooding. The Village workforce has removed trees and other debris from stream beds of all major streams in the Village. Money was not granted by the County to construct a concrete wall in the small gorge on the north side of Remington Road between Cayuga Heights Road and Highland Road. The wall is needed to underpin the edge of Remington Road and protect the shale cliff from further erosion. The project will have to be budgeted (an estim- ated cost of $6,000) by the Village or apply for County stream maintenance money in the future. SIDEWALKS Sidewalks (concrete) have been replaced over the North Triphammer Rd. culverts. More requests for sidewalk maintenance have been received. The lack of time has prevented the Engineer from completing the pending sidewalk report, but it should be finished by the October 1983 meeting. Patching for safety has continued for sidewalks. SEWAGE TREATMENT PLANT Requests have gone out to additional engineering firms for proposals on the engi- neering work.necessary for the belt filter press. Additional proposals have been obtained on the repair of the plant roof. FIRE HOUSE ROOF AND BLOCK POINTING REPAIRS Quotations have been received and contractor Harold Wright, has been notified to proceed to repair block work and repair the fire house roof. VILLAGE OF CAYUGA HEIGHTS REPORT OF ZONING OFFICER September, 1983 During the past month, one zoning permit was issued for construction of a new house on Lisa Place for an estimated construction cost of $100,000.. After inspection by the Zoning Officer approval was given to change the grade of the property, (finished grade to be 3 to 4 feet higher next to the foundation of the hosue. Agree- ment was made by builder and owner to -truck in fill this fall when the damage to the Village road would be at a minimum. One zoning permit was issued for a $31,000 addition and one permit for construction of a $10,000 swimming pool. One sign permit was issued. Questions on the restrictions placed on the Cornwall property on Hanshaw Rd. by the Board of Trustees were raised and copies of the Board minutes were given to a pros- pective buyer and owner. A zoning permit for the construction of a building at the Corners Community Center (estimated construction cost $250,000) was made out but not as yet issued by the permit fee has not been received by the Village.