HomeMy WebLinkAboutReport of the Engineer June 1983n '
VILLAGE OF CAYUGA HEIGHTS
REPORT OF THE ENGINEER
June, 1983
NORTH TRIPHAMMER CULVERTS
The contractor, Hey's Enterprises, has completed work on this project. It is
recommended that, upon receipt of a release of liens from the contractor, the
balance due $14,226 less back charge for Village work and materials be paid.
Hey's Enterprises. It is recommended that the Hey's Enterprises' bill for
$1960 for additional work caused by Republic Steel Corporation delivery of pipe
that did not meet the Village specification be paid. The Village had deducted
the $1960 from the Republic Steel bill.
PERSONNEL
Bruce Hoyt returned to restricted work for one week, had additional back problems
and is again not able to work.
Mike Coyle's operations on his job damaged leg have been successful and he is
expected back to work in a week or two.
The Trustee Committee on personnel leave postponed their meeting but are expected
to meet soon.
EAST UPLAND SIDEWALK
Grading and seeding is completed.
410 EAST UPLAND DEVELOPMENT
The manhole to be installed by the Village as part of the road storm drainage
system was not necessary. An extension and curving of the pipes to be completly
covered will solve problems for the property owner and save the Village at least
$500. The job is complete.
TEXAS LANE WALKWAY
Trustee intentions and desires on this walkway are requested.
TEXAS LANE - FORMER KUBOTA PROPERTY
Ivar Jonson has hired a landscape firm to "replace" the property, in as close as
possible, that was dug up for the sewer line serving Lisa Place. This.includes
the shoulder of Texas Lane. The work is in process or completed.