Loading...
HomeMy WebLinkAboutReport of the Zoning Officer Dec 1982VILLAGE OF CAYUGA HEIGHTS REPORT OF ZONING OFFICER December 1982 Last month two zoning permits were issued for a total'estimated construction cost of $25,000 for alterations and additions. Three road opening permits were issued and one sign permit was issued. The Z.B.A. met on November 29, 1982 to hear a request for a variance from Mrs. With Wanderstock. A variance was granted to exceed the 12% land coverage for a "tool shed ", but the shed would have to be moved to comply with the setback distances of the Village Zoning Ordinances. The operation of the Mobil Station is reported to be by a contract operator. Sign changes described to the Zoning Officer by the owner's representative have not taken place. The large outside "number ", gas price, sign remains. A letter has been received with a lot division map from Mr. Morusty's lawyer.