HomeMy WebLinkAboutReport of the Engineer 8/16/1982VILLAGE OF CAYUGA HEIGHTS
REPORT OF ,ENGINEER
August 16, 1982
F
STREETS
r
The paving of Triphammer Road is completed. There remains an extensive amount
of shoulder work to be done. This will be started within the next week. The
need to install 700 feet of storm sewer, the necessity to remove the sand mix
{g
on the southern part of Triphammer Road, and the need to widen the road with
,..
1;
paved shoulders, all doze in an effort to give the Village a good paving job .
'
has resulted in an overrun of .the Budget well above the figures previously .
estimated. Since all bills have not been sutmitted,.the total cost of the
paving will be available at the next Board meeting.
r�
SIDEWALK
ti,
The rough grading for the E. Upland Rd. sidewalk has been completed. The schedul- .'
ii7
ing of the removal of the TV, telephone, and electric poles on the right -of -way
of the sidewalk has been delayed by coorftnation between the three companies.
,.
VILLAGE HALL
NYSEG has reported back after putting different test meters on our lines'that' the . .
problem with the flickering lights does not result from any service from outside..
z?
and that the replacement of our service from the telephone pole to the building ..•
will not correct our problem. It is not cIear from their tests as to whether the
•:n�c
problem is from the machinery in the Wordpro or the equipment that we have in the
Police Department. The Electric and Gas company agreed to do further testing on., .
"oUr• lines to try to determine the cause of the flickering.
:F
`
Report of Zoning Officer
During the past month one zoning permit was issued for the erection of a sign at:':
the Village Green.