HomeMy WebLinkAboutReport of Engineer 6/21/1982VILLAGE OF CAYUGA HEIGHTS Report of Engineer June 21, 1982 SEWER PLANE A bill for $290 has been received fro Pickard & Anderson for work over and above the amount and scope authorized by thVillage Board. The work was done three or four months ago in connection with the acquiring of a sludge disposal permit. A sewer plant inspection trip will be set up for the Board in July at their conven- ience. A date should be established. SEWER LINES The sewer line replacement job on Cayuga Heights Road has been completed. It was also necessary to replace 200 feet of storm sewer line in this same vicinity. STREETS The recommendation of Prof. Lynn Irwin of Cornell University is for an inch and one half of plant mix asphalt concrete topping on Triphammer Road. Because of the extent of the base and layers of asphalt already in place, the strength of the structure is very good and what is needed is a wearing coat that will not spall or deteriorate. BIDS ON STREET MOWER The bids on the street mower will be received and will be available for Board acceptance or rejection at the Monday evening meeting. VILLAGE HALL There is an increasing proem on the electrical supply for the Village Hall. The increase in the size of thImachines used in te::Wordpro have caused greater flicker- ing o£'the lights which is very disturbing to to people working in the Village Hall. A separate service for the Village Hall annex is recommended and an engineer survey and report on the needs for rewiring and the size of the service to thmain part of the Village Hall is recommended. l There are a number of places on the exterior of the Village Hall where wood trim has deteriorated that would require a carpenter to make repairs by removing beams and window or door sills and replacing the wood. It is recommended that a carpenter be hired on an hourly basis to do this work. 825 HANSHAW ROAD Settlement at the front of the house has caused failure in the brick veneer. Work on this will be necessary prior to the painting of the building. Bids are being secured for the painting at this time. SIDEWALKS A section of sidewalk has been completed on Cayuga Park Circle. A section of side- walk on Triphammer Road near the entrance to the Village of Cayuga Heights from the City is in the process of being replaced along with a culvert into a storm drain under Triphammer Road. REPORT OF THE ZONING OFFICER Luring the past month there have been two zoning permits issued for new house construction for a total estimated cost of $310,000. There has been two permits issued for alterations and additions for an estimated cost of $1900. Cowan hearing before the Zoning Board of Appeals has been scheduled for June 24th. Mrs, wanderstock of 101 Klinewoods Rd. has been notified of a zoning violation.