Loading...
HomeMy WebLinkAboutReport of the Engineer Feb 1981VILLAGE OF CAYUGA HEIGHTS REPORT OF ENGINEER, February 1981 FROZEN CULVERTS A number of road and driveway culverts have frozen causing flooding. These have been thawed by use of the Village steam jenney. Mr. D.W. Singley's drain under North Triphammer froze and was thawed by the Village work force. This line should be excavated, examined, and insulated. The lower part of this pipe under North Triphammer and the shoulder to the wrest did not freeze because of the cover placed over it by the Village in an effort to help out Singley with his problem. PURCHASE OF NEW PICKUP TRUCK Request to put out to bid for the purchase of a new pickup truck. There is suffi- cient money in the current budget, and this was a purchase planned for this year. pt 111Z0-w—h The Village Engineer met with the Public Works Committee on Saturday, January 30, 1980 to go over the 1981 -82 budget proposal. SICK LEAVE POLICY The Engineer and Trustee Allee discussed the proposed sick leave policy with the Public Works personnel. A question was raised on "personal days ". The final proposed policy should be ready for presentation to the full Board at the March meeting with the idea that it should go into effect with the start of the new fiscal year. REPORT OF ZONING OFFICER No zoning permits have been issued in the last month and the Zoning Board of Appeals has not met. The Zoning Officer has met with Mr. Branchini regarding his interest in develop- ment of Mr. Hill's lot on E. Upland Road.