HomeMy WebLinkAboutReport of the Engineer March 1980VILLAGE OF CAYUGA HEIGHTS
REPORT OF THE ENGINEER - March 1980
LANSING SEWER LINES
In reviewing the drawings for the Lansing sewer Lines, it has been noted that the
connection of the existing 8 -in. Village sewer line in Tyler Road is not shown as
connected or as to be connected under this project. Also, the project plans do not
show a conversion of the sewer lines in Warren Road to divert the entire flow clown
Warren Road, including the flow from the County Airport, down Dart Road and through
the Village of Lansing to the railroad trunk line rather than coming into the
.Village by way of Burleigh Drive. These two points should be cleared up with the
Lansing officials or their engineers along with the questions raised by the Mayor's
letter that brought to the attention of the Village of Lansing the requirements of
our seiner contract with the Village of Lansing, including the need for our approval
of any sewer line construction plans. To date, the Mayor's letter to the Village
of Lansing has not been answered.
TM4 PICKUP TRUCK
Phe new pickup truck was delivered; inspected by the Public Works Superintendent,
Ur. Tyrrell; and found to meet specifications.
PLESONNEL
Mr. Timmie Dupuy is thought to have strained his back while lifting a 55- gallon
drum half filled with bricks and stones during the Village refuse collection opera-
tion. He was advised by Dr. Mann to not report to work until Friday, April 4, 1.980,
at which time he is to report back to the doctor for further examination.
REPORT OF ZONING OFFICER - April 1980
There were no zoning permits issued since the last report and also no road opening
permits.
The Zoning Board of Appeals is scheduled to meet April 9, 1980, at 'j:30 p.m., to
consider a request from Mr. and Mrs. Reeder Gates, 2233 N. Triphammer Road, for a
zoning variance regarding building coverage and property line setbacks.