Loading...
HomeMy WebLinkAboutReport of Engineer 4/1/1978VILLAGE OF CAYUGA HEIGHTS BOARD OF TRUSTEES e REPORT OF ENGINEER - April 1978 SEWER LINES The sewer lines constructed in connection with the additions at the Pyramid Mall and the sewer lines that were constructed during the original building of Pyramid Mall were again inspected by the Engineer and the Public Works Foreman. Work on these sewer lines and manholes is still required before a statement can be issued to the Village of Lansing stating they meet Village requirements. STORM WATER Numerous requests are still being received to have the Village do something about stream flow and surface water flow on private property. Long discussions have been held with John Babcock, E. W. Jones, Ernie Cole, Joe Cosentini, Professor Mermin, and Mrs. Bowman to mention a few. It is suggested that a statement be made by the Village explaining the Village position in regard to stream flow and surface water flout on private property and that it be distributed by letter and /or an article in the local publication. WATER LINES Current bills received from the Water Commission for work on the Village water lines by the Commission personnel are being reviewed and will be presented at the next Board meeting. • LOCKE PROPERTY Weather pernitting, a series of level readings will be taken io determine the elevation of the basement of the Locke house in relation to the culvert running under the road in front of the Locke property. REPORT OF THE ZONING OFFICER - April 1978 Restrictions on the permission to develop the lands of Lagrand E. Chase on Pleasant Grove Road have been drawn up by the Engineer and the Attorney. Copies of these restrictions will be mailed to the Trustees or will be available at the meeting. 0