Loading...
HomeMy WebLinkAboutReport of the Engineer March 1978• VILLAGE OF CAYUGA HEIGHTS REPORT OF THE ENGINEER March 1978 PERSONNEL Jack (Bert) Truax was �pending a major part of his time doing 20 omotive repast work on Village equipment. If Mr. Truax goes on disability leave or makes a decision to take early retirement, his budget line Item should be reclassified as a mechanic- assistaht foreman and a new job description be prepared. It It believed that a good candida-fe can be hired for around $11,000. STREETS Public Works Department Is prepared to replace a damaged culvert under N. Sunset Drive as soon as the frost leaves the ground in that area. This will correct a stream flow problem which has been giving Mr. Brodhead problems at his home Just south of this culvert. SNOW. ICE b WATER Mr. Tyrrell has kept the problem stream areas under constant surveillance during the period of melt -off and will continue to do so during the spring. A removal • of snow from ditches and accumulated ice in front of culverts has been done. The weather has been cooperative in that there has not been a heavy rain combined with a warm weather which would accelerate the run -off rate. FIRE HOUSE ROOF A Fire House inspection was made by the Engineer of the Insulation over the resident driver apartment In the Fire Station. Additional insulation was In- stalled by the contractor and the sum of money withheld from payment to the contractor for this work should now be paid to him. (Balance $665.00) REPORT OF ZONING OFFICER A request has been received from Robert S. Grant, attorney for the Corners Community Center, requesting that a strip of property to the south and west of the Corners Community Center fronting the east side of East Upland Rd. be rezoned from residential to multiple housing. This strip is 498 feet long and 200 feet in depth. This matter is for determination by the Village Board of Trustees rather than the Village Zoning Board of Appeals. A request for the construction of addition to the fire damaged property at 1107 Triphammer Rd. hbs been denied because the addition would exceed the land coverage allowable under the Village zoning ordinance. • During the'past month one zoning permit was Issued to renew a permit of a year ago which had expired because no construction had started on the proposed Job. No road opening permits were issued during the past month. Jdh6 tti Roger'si Efig� /Z.O.