Loading...
HomeMy WebLinkAboutReport of Engineer Feb 19770 VILLAGE OF CAYUGA HEIGHTS REPORT OF THE ENGINEER - February 1977 STREETS The top surface of Triphammer Road (sand mix) has traveled areas. The supplier has been notified, mix back for lab tests to determine the problem. problem with the pugmill mix. At this time, it s which was put down just prior to the topping coa t not show excessive wear. GARAGE (�va( c, worn away in many of the most and he is taking samples of the It is thought that there is a eems that the leveling coat, , Is In good condition and does 119 have two quotations for installing eight inches of blown -in insulation over the ceiling of two bay areas and the small, adjacent building. The estimate from Lang Roofing is $660. The estimate from Marion Electric Is $1,050. Both firms have done considerable insulation work in the Village area. Does the Board wish to have this insulation installed now or wait until the next budget year? At pre- sent, there is only 31 inches of insulation over the small, adjacent building. SNOW REMOVAL The total for this year for salt, sand, gravel, and grits is $2400. This Is out of a budget figure of $6000 for the full year. We have had an exceptionally cold • first half of the winter, and this relatively low cost figure Is an indication of the use of grits and sand mixture with salt for ice control rather than straight salt. There has been considerable overtime, as many of the snowfalls occurred on weekends and in the night. SEWAGE TREATMENT PLANT After discussions with the contractor, Stewart and Bennett, at the time of writing this report all but two Items remain to be completed on their list. A detail of the cost for enclosing the grit chamber can then be submitted to the Board for their review and approval of the change order for that enclosure. Signs on all non - potable water have been Installed at the Plant. The tannic hardware for the chlorine room has been installed. The contractor is working on a cost proposal for supplying spare parts under the latest proposed change order, and it should be completed before our February meeting. There Is some minor concrete work to be done to the final settlement basins. This repair work can not be done until warmer weather, but there is no controversy with the contractor, and he will complete the work as soon as the weather permits. REPORT OF THE ZONING OFFICER - February 1977 During the past month there have been no zoning permits Issued, although there have been two street opening permits issued. 41 The Zoning Board of Appeals meets February 14 to hear the request of Lagrand Chase that he be permitted to exceed 1-he height requirement at the rear of a residential house on Pleasant Grove Road. He is also requesting a temporary occupancy of the building by his own personal office while the building is being completed and before he occupies it as his residence.