Loading...
HomeMy WebLinkAboutReport of the Engineer 3/17/1975REPORT OF ENGINEER 3 /1T /T5 • NEW SEWAGE TMA71ENT PLANT At our request our Engineers have designed and requested a proposal from our electrical contractor slid -State Electric to submitt a proposal for 1. ti:e installa- tion of Type C fixtures and 2. the installation of a time clock for the grit chamber operation. Ifid- State's proposal I is $216.00 for the installation of the C type fixture and $334.27 for the installation of the time clock: Details of these proposals will be available at the Board meeting. It is the recommendation of the Village Engineer and Teetor- Dobbins that these proposals for changes and extras be accepted and the work be started. NThI WATER LINES. Mr. Masciarelli, Contractor for the installation of transmission mains for the Southern Cayuga Lake Intermunicipal Water Supply Project wishes the Village of Cayuga Heights to waive the deposit of $100 required for the open cutting of roads in the Village. Because Cdr. Masciarelli has submitted a preformance bond in connection with his contract and because the Village does not require either the NYSE &G or the NY Telephone Co. to deposit $100 for road opening permits, it is the recommendation of the Village Engineer that this $100 deposit be waived. After discussion with the firm of Macciarelli Construction Co. and the Clerk of the Works., fir. Ed LaVigne, of this project; it has been determined that the back fill in open cut road crossings of paved areas . be completely filled with crusher run limestone. There are only two such crossings required in the Village, one on North Triphammer near Hanshav Road and the other is on Pleasant Grove Road.,This type of crusher run has been used by the Village in backfilling under paved roads the length of Fast Upland Road, Cayuga Park Road and a section on Hanshaw Road, 1Qinewoods.Road and many others. Because of the good results obtained by this type of back fill, we have adopted this as the required procedure for any of the Village openings of paved road areas and any other persons opening our roads. It is the recommendation of the Village Engineer and Bob Tyrrell, Public Works Superin- tendent that this standard be maintained. Mr. LaVigne said during our discussion on March 14th that this type of back fill with crusher run to the full depth of the cut was found to give good results and was used in the Town of Lansing. STREET NA1.1E AND NUMBERING A request has been received from the Attorney of Mr. & Airs. Carl Sagan that the name of TYLER ROAD be changed to PLANET PLACE and that their property be asdigned the number ONE. en�r ZONITM OFFICER'S REPORT 3/1T/75 During the past month one building permit was issued for alterations and additions for an estimated cost of $1,000. One additional permit was issued for the con- struction of a new single family residence for an estimated cost of $32,000. Also issued were seven road opening permits. • A request has been received from an occupant of the Village Green to change the location of a sign. Details will be available at the Board meeting.