Loading...
HomeMy WebLinkAboutReport of Clerk 11/18/1974VILLAGE OF CAYUGA HEIGHTS Report of Clerk 11/18/74 OVERTIME paid in October 1974 as follows: Marshall 4 hours $21.96 Truax 4 hours 25.08 We need a resolution to authorize the Mayor to sign approval of Change Orders 5 through 9 for the Sewer Plant expansion as follows: . CHANGE ORDER NO. 5 - 8/21/74 - Stewart & Bennett, Inc. Modifications to discharge piping for the sewage recirculation pumps. Total Cost of change - $1,617.00. CHANGE ORDER N0. 6 - 8/21/74 - Stewart & Bennett, Inc. Provide an additional 70 linear feet of 6 -inch underdrain and filter material along the east edge of existing pavement adjacent the new grit chamber. Total Cost of change - $431.00. CHANGE ORDER NO. 7 - 8/21/74 - Stewart & Bennett, Inc. Construction of a reinforced concrete pier support of rock for the influent pipe tee for the new grit chamber. Total Cost of change - $524.00. • CHANGE ORDER N0. 8 - 8/21/74 - Stewart & Bennett, Inc. Revise 4 -inch diameter digested sludge line at the primary digester, include an additional 4 -inch expansion joint. Total Cost of change - $571.00. CHANGE ORDER NO. 9 - 8/21/74 - Stewart & Bennett, Inc. Install a plug in the new plant outfall line at the polyethylene pipe and cast iron connection. Total Cost of change - $502.00 Total Cost all five change orders equals $3,645.00 I discovered that Resolution 2344 of the last regular meeting concerning a Public Hearing on a NO PARKING ZONE was incorrect. .I ask that you rescind this resolution and make a new resolution which the Police Chief will advise us on. After talking with Mayor Marcham and relating that I had not published notice of a public hearing, he said we could hold the public hearing next meeting. I need approval to prewrite a check for $113.50 for ordering 1000 government printed 10¢ stamped envelopes for Village Justice. Rose M. Tierney . Village Clerk