Loading...
HomeMy WebLinkAboutReport of the Engineer Dec 19736 VILLAGE OF CAYUGA HEIGHTS REPORT OF THE ENGINEER DECEMBER 1973 • VILLAGE PROPERTY ON FOREST DRIVE The J. D. Gallagher Co. was hired to make an appraisal of this property in anticipation of the Village receiving bids for its sale. This report is on file with the Village Clerk for the Trustee's inspection if they so desire. The valuation report of the J. D. Gallagher Co. has not been made public but can be if the Trustees feel it is the proper procedure. Upon inspection of the property with Mr. Agard of the J. D. Gallagher Co. it was noted that there were a number of dead elm trees in the back part of the property that had not been removed. There were also a number of very large dead trees .lying on the property that would have to be removed if the property were to be used for a building lot. In an effort to make the lot more saleable and to follow through with our own Dutch Elm Disease Control Program the Public Works Crew was directed to remove all dead trees standing or lying on the ground. This took considerable machine and manpower. LEAVES AND ELM WOOD An excellent job has been maintained in keeping up with the removal of leaves and elm wood put out by the roadside. The job is not yet complete and the service of leaf removal will continue until December 15. SEWER LINES Construction and repair work on sewer lines has been postponed during the • fall to allow the crew to do leaf and elm wood removal. During the Christmas vacation when school is not in session at the Cayuga Heights School, the replacement of a leaking sewer line running across the school property is scheduled. Also, as soon as time permits a second section of the sewer line on Berkshire Road will be replaced. In connection with the sewer line replacement was proposed the purchase of a 4" pump reported at the last meeting. At the request of the Board prices on similar pumps have been secured from other suppliers. They are as follows: Valley Fixit Shop, Ithaca - Homelite 4" trash pump with suction hose and 250' of discharge hose - $1,335.00 Self- Central Scaffolding, Vestal - another brand of 4" trash pump with same hoses - $3,615 Seneca Supply, Ithaca - Homolite 4" trash pump with suction hose and 250' of discharge hose - $1,454.00 SEWAGE TREATMENT PLANT Additional information has been pulled together and submitted to Mr. Petrucelli of the Environmental Conservation Office in Syracuse to further process our requests for grant in aid in the sewer plant operation. The operation of our existing treatment plant by Mr. Gary Gleason under contract has received praise from the State, our Consulting Engineers, and our contractor, Stewart and Bennett. In addition to his present operation, Mr. Gleason has been helpful in securing . information out of the plant files pertaining to the operation 'during the last year as a help in our application for grant in aid. 0 17J • Engineer's Report CONSTRUCTION OF ALTERATIONS AND ADDITIONS TO SUTAGE TREAT14ENT PLANT Construction progress continues to be ahead of schedul e at this time that at least part of the plant will be on line by April 1974. The Village application for a 50% completion in aid for this construction has been completed and has been payment. Page 2 and it is anticipated and treating sewage payment in grant submitted for At the request of Mr. Shepherd who owns property fronting on lower Remington Road, a telephone pole blocking entrance to this road was removed. He has been instructed to notify us as soon as the access he required is not necessary for another period and we will replace the barricade. This will keep unwanted traffic and nuisance from traveling this road and as a result it will not have to be patroled by the Police. J. B. Rogers Village Engineer