VILLAGE OF CAYUGP HEIGHTS
REPORT OF THE E1101INEER
NOVEMBER 1972
FLOOD DAMAGE
All flood damage work has been completed except replacement of Juniper
bushes at the Village Sewage Treatment Plant and grading at the Sewage Treatment
Plant and the completion of the culvert on North Sunset Drive. The replacement
steel culvert under North Sunset is in place, all seams have been welded and
about one -half of the backfill has been replaced. Footings for the headwall
have been poured and form work for the headwalls is in process. It is estimated
that the work should be completed within a month.
LEAF COLLECTION
Excessive amount of rainy weather has delayed some collection of leaves
but it is expected that all leaves put out for collection will be picked up by
November 20. It will then be possible to keep up with the leaves that are put
out for collection.
DISEASED EU4 WOOD
The Village men continue to pick up diseased elm wood when they can fit
it into their schedule. With the excessive amount of rainy weather this fall
the contractor who was scheduled by contract to have finished the removal of
some 50 trees has fallen behind schedule but I am assured by him that they will
be completed by November 20.
SEWER LINES
The leak and partial blockage has been discovered in the sewer line on
Sunset Drive. Tests will be made to try to isolate the break, then it will
be repaired, or if the entire line is in bad condition it will be replaced
from the corner of Corson Place to the north end of Sunset Drive.
SEWER PLANT
Alterations and Additions, Phase II have been put out for bid. Copies
of plans and specifications have been received from Teetor - Dobbins and are
being forwarded to perspective bidders at their request and expense. Further
discussion of the right of way for staging area over Liberman's right of way
have been carried out with the Village Attorney in preparation for condemnation
proceedings. Any additions or addenda to the Plans and Specifications must
be in the hands of Teetor - Dobbins no later than November 24 so that they can
be forwarded to the contractors for bidding purposes.
J. B. Rogers
Village Engineer