HomeMy WebLinkAboutEngineer's Report Sept 1971VILLAGE OF CAYUGA HEIGHTS
REPORT OF. THE ENGINDER
September 1971
• I. Streets
Surface treating to seal the roads that were paved with the motor paver this
year is expected to be carried out in the mid part of September, weather
permitting. Also, it is hoped to surface treat Renshaw Road through the
commercial shopping area in the Village if traffic can be sufficiently
controlled. This will complete the annual street paving program.
II. Sewer Plant
Plans and specifications for the first stage of the sewer treatment plant
alterations and additions have gone out to bid. The engineer's estimate on
the cost of construction is $130,000. The Engineer and the Sewer Plant
Operator met with Mr. Valle of Teetor - Dobbins on problems of the present
plant that should be included in the alteration and additional plans plus
cooperation between Teetor- Dobbins and our plant operation during the final
stages of design.
A letter was written to the City asking for a map showing the roads over
which fill could be trucked from the Village Sewage Plant to a disposal
area in the City. Also a letter guaranteeing to accept this fill was
received from the City. A problem here that is being investigated is that
the map seems to indicate that the fill is to be deposited in a small
abandoned channel of the Inlet.
• III. Fire Station
Difficulty was incurred in the motor paving operation in laying down the
driveway for the Fire Station. It is the opinion of the Engineer that the
emulsion mix was not correct and the operator of the motor paver, a Koppers
Company employee, did not do a good job. For best results in the long range
the best procedure now would be to allow the driveway to compact under the
traffic from the fire trucks and next spring put another leveling coat on
the driveway which would then be sealed by a surface treatment.
IV. Trees
Another three or four days was spent by our entire work crew removing elm
wood which had been cut and put by the roadside. None of this work was elm
wood cut by the S & S Tree Company. The S & S Tree Company that received the
award of bids for removal of 36 trees in the Village right -of -way did a good
job. All trees were removed, all stumps were cut close to the ground and
leaves and small branches were raked and hauled away.. It is recommended that
the total contract price be paid to this company.
V. Sewer Lines
A crew of men have been put on the project of locating every sewer manhole.
Where the manhole cover is below street level because of paving they are
being raised to where they will be easily found in the future. Also, during
• this process all lines are being flushed and a record made of lines that
would need periodic flushing.
,,'
Engineer's Report
• VI. Inspection of Smith Property Problem
•
41
Page 2
Along with Trustees Fogg and Nulle, the Engineer inspected the problem further
with Mr. Smith and at the Trustee's suggestion it was agreed that a catch
basin would be placed in front of the driveway culvert east of the side of
the road east of the Smith property and also a catch basin directly in front
of the culvert that goes under the road carrying water onto the Smith property.
VII. Fall Planting
Within the next month our plans are to do fall planting around the Village
Hall and around the Fire House as well as a couple of places that need
reseeding due to sewer line work.
J. B. Rogers
Village Engineer