Loading...
HomeMy WebLinkAboutEngineer's Report Nov 1971• VILLAGE OF CAYUGA HEIGHTS REPORT OF THE ENGINEER NOVEMBER 1971 I. STREETS During the past two weeks a sealing coat has been applied to the road surfaces which have been repaved by the motor paver earlier this year. The painting of traffic lines on the streets has been completed. II. SNOW REMOVAL A good supply of salt has been trucked in and is stored in our newly roofed salt storage bin. Plows have been made ready for the first snow removal work. Public works supervisor Bob Tyrrell is looking for a small plow for our four - wheeled drive truck. This truck will primarily be used at the Village Sewage Treatment Plant where snow removal in the past by our larger truck and larger plow has been very hard on our equipment. It can also be used on intersections, parking lots, both at the Village Hall and at the Fire House. III. LEAF REMOVAL With two blowers operating the leaf removal has progressed much faster this year. Also, because the leaves are stored near the Village Barn the travel time for disposal of a truck full of leaves has been decreased. This also • has increased the efficiency on the leaf removal job. IV. SEWAGE TREATMENT PLANT The Board's request for a general description of the expanded Village Treatment Plant was passed on to our engineers Teetor - Dobbins. Their description was forwarded to the Trustees with the October 28th Agenda. Additional copies are on file with the Village Clerk if they are needed. V. FIRE STATION Planting has been completed at the Fire Hall except for a row of bushes along the back property line which have been on order from our supplier but have not as yet been delivered. The motor paver driveway surface was treated with a sealer coat with light stone both in front and in back of the new garage. J. B. Rogers Village Engineer C�