HomeMy WebLinkAboutEngineer's Report Dec 1971VILLAGE OF CAYUGA HEIGHTS REPORT OF THE ENGINEER S DECEMBER 1971 F am" �;G74it7s3aLy The one short period of snow and ice we have had so far was well handled by the crew. All pieces of snow removal equipment are in operating condition, ready to go. A new snow plow blade was purchased and installed on the Village 4 -wheel drive power wagon. This piece of equipment will primarily be used for snow removal at the Sewage Disposal Plant. II. LEAF REMOVAL All leaves that were in piles by the roadsides were collected and the job was considered complete. The last unseasonably warm weather over the weekend of December 11th brought out many resident leaf rakers and our job of leaf collection continues. III. NEW SEWAGE TREATMENT PLANT The contractor for phase I of the new plant additions and alterations is making good progress in his grading work. All tree and brush removal work has been completed. Stock piling of top soil has been completed. Grading and removal of excess overburden is started. A good view of the entire job can be had by stopping on Route 13 above the Sewage Disposal Plant area. IV. SEWAGE TREATMENT SERVICE Formal requests and plans from Lansing Sewer District #2 have been received for the installation of sewer lines for the first phase of Lansing North Apartment complex which will eventually house 750 units. Sewer lines will be laid during the winter but no connection will be made to the existing Lansing lines that tie into the Village sewer system until next summer. Our inspector as well as Lansing inspector will keep a close watch on the construction of these lines. V. Samples of possible exteriors for the new sewer plant buildings are in the Village office for Trustee's inspection. These have been suggested by our Consulting Engineers, Teetor - Dobbins. J. B. Rogers Village Engineer •