HomeMy WebLinkAboutEngineer's Report June 1969VILLAGE OF CAYUGA HEIGHTS ENGINEER'S REPORT JUNE 1969 0 I. Sewer Line Infiltration A major sewer line leak has been located in the North Sunset 8" main by the flow meter program. Tests are currently underway to isolate the leak and correct it. The Teetor- Dobbins program for use of flow meters was based on the use of five meters and it is recommended by them to continue this program by Village personnel. This would necessitate the purchase of five used but in good operating condition meters rather than the four as discussed the last Special Board Meeting. The price of the meters is $139.00 or a total of $695.00. Fred Howe has been hired as a temporary employee. One of his duties will be the maintenance and operation of the flow meters. He is presently being instructed by Teetor - Dobbins personnel. II. Sewage Treatment Plant Summer employee, Fred Howe, will operate the Village Sewer Plant on weekends four hours Saturday and four hours Sunday as part of his regular 40 -hour week. Ile worked for the Village Sewer Plant last year so is familiar with the operation. III. Sidewalks Grading for the sidewalks has been completed on the house side of the sidewalk for all areas except in front of Hatfields where the operation • has been held up because of the installation of the Hatfield's sewer lateral. The Hatfield sewer lateral was completed on June 4th. It is recommended that the construction of the retaining wall at the large culvert between Quinn's and Hatfield's be put out for bid. Rough estimate of cost would be about $1,000. Grading of the roadside ditch for the sidewalk has been started and will be finished within two weeks. IV. Carriage House Fire Hydrant The installation of an 8" water main from Pleasant Grove Road has been completed and the fire hydrant is now in operation at the rear of the Telephone Company adjacent to their parking lot. As a result of our excavation for this water line water has come to the surface and has continued to flow for over a 2 -week period. This is our responsibility although as yet it has not been absolutely determined as to the origin of this water. This may add to the cost of the completed job. V. Sewer Line Plans Submitted for Approval Plans and profiles for the Sharon Wood Drive and Pine Woods Place for the sewer mains drawn by Engineer T. G. Miller have been submitted for Village approval. A copy of these plans are available at the Village Office for Board inspection. These plans are in order and it is recommended that they be approved. VI. Board of Trustees Approval of Teetor - Dobbins Report • It is recommended that approval be given to the Engineer's Report on the addition to the Village Sewage Treatment Plant submitted by Teetor - Dobbins. Approval is necessary at this time for applications for State and Federal Aid. It is also recommended that approval be given for bill from Teetor - Dobbins for $15,228.75 for preparation of this report. The bill is in accordance with professional engineering practice. J. B. ROGERS, VILLAGE ENGIKE'ER